This invoice from Ericsson India Pvt Ltd to Kross Infotel Ltd summarizes work completed on a project for Airtel. It includes 14 line items describing telecommunications infrastructure installation and upgrades, such as linking BTS sites and installing equipment. The total amount due is 122,700 Indian rupees.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This invoice from Ericsson India Pvt Ltd to Kross Infotel Ltd summarizes work completed on a project for Airtel. It includes 14 line items describing telecommunications infrastructure installation and upgrades, such as linking BTS sites and installing equipment. The total amount due is 122,700 Indian rupees.
This invoice from Ericsson India Pvt Ltd to Kross Infotel Ltd summarizes work completed on a project for Airtel. It includes 14 line items describing telecommunications infrastructure installation and upgrades, such as linking BTS sites and installing equipment. The total amount due is 122,700 Indian rupees.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This invoice from Ericsson India Pvt Ltd to Kross Infotel Ltd summarizes work completed on a project for Airtel. It includes 14 line items describing telecommunications infrastructure installation and upgrades, such as linking BTS sites and installing equipment. The total amount due is 122,700 Indian rupees.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Ericsson India Pvt Ltd Invoice No : Kross /09/10/453
Hotel Jehlum Resorts Invoice Date :`26th -Oct-09 Gandhi Nagar, Jammu (J&K) INDIA
Work.Order No: Pan No. : AACCK8953F
Date: Service Tax No. : AACCK8953FST001 PROJECT : Airtel GRN.No.: Rate per S.No Description of work Scope Quantity Total Amt Unit 2964 BTS 0.6 Link at Mandi 1 1 15000 1 15000 Sangwala link (1+0) 0.6 at Janipur to 2 3 4000 1 4000 Sarwal 2964 BTS &1.2 Link at 3 2,17 19500 1 19500 Rara 4 2111 &1.2 link at Rajpura 16500 1 16500 2964 BTS &1.2 link at 5 17,2 19500 1 19500 Samba 1 Sup.1 (Railway station) Tech .2 Rigger at 6 73 2500 1 2500 Samba(Railway Station) 7 RRU EXP at Deyoli Chak 2500 1 2500 For even cabel 1 Tech at 8 73 700 1 700 Chadwal RBSC 1.2 Link at SND344 TO 9 17 8000 1 8000 SND307 1.2 Link at LMB434 TO 10 17 8000 1 8000 BKH937 1.2 Link at LMB434 TO 11 17 8000 1 8000 JMU093 1.2 Link at SND307 TO 12 17 8000 1 8000 BML308 20 P Kit install at 13 2000 1 2000 Sunderbani 3 EXP 2964,Change of M/W 14 9 8500 1 8500 Mount Sub Total 122,700 Total 122,700
Amount in Words:Rs One Lakh Twenty Two Thousand & Seven Hundred Only.