Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

PRESSURE EQUIPMENT

INSPECTION REQUIREMENTS
IDENTIFICATION
Unit:
Train 3 - Unit 02
Tag No:
03-V0211
Equipment Name:
No. 1 Drain Drum
VESSEL/CONFINED SPACE ENTRY REQUIRED: YES NO
CLEANING & PURGING REQUIREMENTS
Water Wash Caustic Wash Fuel Gas Purge Air Purge
Steaming N2 Purge Other: As Per Operations Requirements
OPENING FOR INSPECTION
an !a"s #es No Open Manway M
$nternal an !a"s #es No
Channel Co%er #es No
&un'le remo%e' #es No
Other Opening #es No
Comments:
SUPPORT SERVICES REQUIRED FOR INSPECTION
(emister )emo%e' #es No
Schoepentoeter )emo%e #es No
)asching )ings )emo%e #es No
Sca**ol'ing )equire' #es No nterna! s"a#o!$ to a""ess t%e s%e!!&no''!es at top si$e
echanical Cleaning #es No Power (rus% "!eanin) o* s%e!! an$ no''!e we!$s
+ighting )equire' #es No Vesse! sa*e +an$ ,amps insi$e -esse!.
Comments: 1. A&" %ose to (e arran)e$ i* *oun$ -ery %ot insi$e t%e Un$er)roun$ -esse!.
2. Pro-i$e 230 V e!e"tri" supp!y at man way.
INSPECTION
,isual $nspection #es No
Ultrasonic $nspection #es No T%i".ness on set TM,/s.
("e Penetrant #es No
agnetic Particle #es No 0%e!! an$ no''!e we!$s as per nspe"tor/s mar.in)s.
E''" Current #es No
)a'iograph" #es No
Comments:
ADDITIONAL REQUIREMENTS
-"'ro.Pneumatic Test #es No nterna! steam "oi! %y$ro test at 1 (ar ).
P), Ser%icing #es No
Other #es No
Comments
MANPOWER
/atar gas $nspector #es No 1 2atar )as nspe"tor
N(E Technicians #es No 2 NDT te"%ni"ians
$nspection Time 1 Twe!-e-%our s%i*ts
PREPARED BY
Signature:
Name:
Title:
(ate:
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000
000000000000000000000000000000000

You might also like