SL No Activity Resp Target Date For Compln. Actual Date of Compln. Review

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

(P) LTD

Design Development Plan



PREPARED BY
Date:

APPROVED BY
Date:


QUAD/F/D&D/01-00

Mould/Die
Description



Customer
Enquiry Ref
Date
Primary
Responsibility

SL
No
Activity Resp
Target
date for
Compln.
Actual date
of Compln.
Review.
1.
Collecting of design
Inputs.

2.
Preparation of Concept
Design

3. Review of concept design
4. Customer 1 stage approval
5.
Final Design and BOM
Preparation

6. Design Review
7.
Final drawings and BOM
Release

8.
Manufacturing of
Mould/Die

9. Sample Production
10. Testing
11. Final Design review
12. Customers Inspection
13.
Customer Feedback
(Validation)