< 1.west, south then east > < 2.east through the mountain, then south >
< 3.across the private ground, Min distance > < 4.Min the private distance, then east >
< C(x), economized cost, BML + the private ground> 2. Tables of each case. Case.1 Case.2 Case.3 case.4 C(x) BML $ 500,000 per/mile Total 60 miles Total 50 miles (15 2 +35 2 ) 1/2
miles (35+15) miles (15 2 +X 2 ) 1/2 +(35-x) miles Drilling Mt $2,000,000 Included
Env. Study $320,000 Included
Delay cost $480.000 (4*$120.000)
Included
Additional cost of The private ground $350,000 per/mile
3. The explanation of solution and equation. Case 1. One running west, south and then east to the refinery. ( West + South + East )*( The cost of running the pipeline on BLM ground ) = ( 5miles + 15miles +40miles )*( $500,000 ) = $30,000,000 Case 2. One heading east through the mountain and then south to the refinery. ( East through the mountain + South ) * ( The cost of running the pipeline on BLM ground ) + ( Drilling the mountain + Cost for environmental study + Delay cost for 4 months ) = ( 35miles + 15miles )*( $500,000 ) + ( $2,000,000 + $320,000 +4(months)*$350,000 ) = $27,000,000 Case 3. The shortest distance from well to refinery across the private ground. ( Southeast )*( Cost of BML + Additional cost of The private ground ) = [(15 2 +35 2 ) 1/2 miles] + ( $350,000 + $500,000 ) = $32,367,035 Case 4. The shortest path across the private ground (directly south), then straight to the refinery (directly east). ( South )*[ ( Cost of BML + Additional cost of the private ground ) + ( East )*(Cost of BML) ] = ( 15miles )*( $350,000 + $500,000 ) = $30,250,000 Comparing among 4 Cases, Optimal cost is Case 2.
C(x) : Involving crossing some private ground as well as some BLM ground. ( 0x35, South or Southeast)*[ (Cost of BML + Additional cost the private ground) + ( East )*(Cost of BML) = [ ( 15 2 +x 2 ) 1/2 + ( 35 x ) ]miles*( $500,000 ) + [(15 2 +x 2 ) 1/2 miles ]*( $350,000 ) To find minimum cost for x point, use derivation and graph. C(x) = 850,000*( 15 2 +x 2 ) 1/2 +500,000*( 35 - x ), ( 0 x 35 ) C`(x) = 850,000*x/( 15 2 +x 2 ) 1/2 -500,000 C`(x) = 0, x = ( 22500/189 ) 1/2 =10.91 x =10.91 miles , Minimum cost is $27,810,795
4. Reflection Most people who have not experienced into Math class or Math over an academic purpose, they easily treat Math as something that is disparate against real life. As a result, some people feel they dont need to know and do well about math. However, even from counting coins for paying purchase to sending a spaceship into space, Math has an intimate connection with human life. It is not a matter of need or needless but prerequisite basic of daily life. As I see above, with math, I can check ideal costs for pipeline. Given the numbers of all expense, we can calculate the economized price for pipeline construction by using derivation. It might be a rash decision, however, based on this project, Im pretty sure that math is a very beneficial tool for life. Its better to focus on life of math if we have a chance to learn.