Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Service certificate

MT ANUKET IVORY
MISSION OC KBE 550
1 Load Pos. 15 20 30 40 50 60 70 80 90 100
2
Fuel
amount
l/h 80 150 230
3
Fuel temp.
at inlet to
burner
C
4
Fuel
pressure at
burner
Barg. 1,8 1,8 1,8 1,8 1,8
5
Fuel temp.
after pre-
heater
C
6
Fuel
temperatur
e in tank
C 32 32 32 32 32
7
Air temp. at
inlet air fan
C 34 34 34 34 34
8
Static
pressure
after air fan
mBar 255 245 235 210 185
9
Static
pressure in
wind box
mmWS 10 12 15 45 80
10
Static
pressure
on primary
air
mmWS
11
Static
pressure in
furnace
room
mmWS 1 2 4 17 30
12
Static
pressure in
uptake
mmWS
13
Fluegaste
mperature
in uptake
C 140 152 170 250 298
14
O2 in
uptake
% 6,5 6,5 7 7 7
15
CO in
uptake
No. 24 19 14 6 8
16
Steampres
sure at
boiler
Barg 4 4,2 4,5 5,1 6
17
Power
combustion-
airfan
Amp.
18
Feedwater
temp.
C
Burner cup, direction of rotation: Distance Cup/cupscroud (m0.8mm
Direction of primary airvanes:
Direction of secondary airvanes:
MGO
Tertiary airgap (mm.):
Date / Time: 4.7.2014 Fueltype/quality:
Fuel circulation valve open (turns):
Boiler type/No: Burner type/No:
Performance Scheme for Rotary Cup Oilburner
Plant name/O.N:

You might also like