Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Titan Manufacturing and Distribution Inc.

141 Eastley Street #113


Collierville, TN 38017
800-605-8241


POWER RACK ASSEMBLY GUIDE


Two people are required to safely assemble unit.
Unpack the boxes and lay all the pieces in the area where it will be
assembled.
Familiarize yourself with the pieces and hardware, and compare them to the
installation instructions.
Tighten bolts just enough to hold pieces securely. This will make it easier to
line up all the pieces.
When unit is completely assembled, go back and tighten each bolt fully.





Package Contents: (1) Back Leg, (2) Side Leg, (4) Upright Posts, (2) Side Cross Supports,
(1) Rear Cross Support, (1) Pull Up Bar, (20) Hex-bolts M12x80, (8) Square Bolts M12x75,
(28) Nuts, (4) Plastic Feet, (2) J-Hooks, (2) Steel Tubes.







Step #1:

Bolt the two side legs to the back leg using
the Hex-bolt M12x80.









Step #2:

Attach the four upright posts to the side legs.
Use the square neck bolts M12x75, insert
them from the bottom up.

Place the washers on the top along with the
nut.












Step #3:

Attach the two top cross supports to the
front and rear uprights, using the Hex-bolt
M12x80.

The 2 holes on cross support for the pull up
bar should be at the front.










Step #4:

Attach the top rear cross support bar to rear
uprights, using the Hex-bolt M12x80.













Step #5:

Attach the pull up bar to front uprights, using
the Hex-bolt M12x80.

You might also like