This document is a protocol from an inspection of drainage pipes. It includes information about the company performing the inspection, SC EUROSOLAR SRL, their address and contact information. The inspection took place on an underground drainage system running between manholes CM7 and a building. The pipes are made of PVC and are 100mm in diameter. The report notes that the system requires cleaning as it has deposits inside.
This document is a protocol from an inspection of drainage pipes. It includes information about the company performing the inspection, SC EUROSOLAR SRL, their address and contact information. The inspection took place on an underground drainage system running between manholes CM7 and a building. The pipes are made of PVC and are 100mm in diameter. The report notes that the system requires cleaning as it has deposits inside.
This document is a protocol from an inspection of drainage pipes. It includes information about the company performing the inspection, SC EUROSOLAR SRL, their address and contact information. The inspection took place on an underground drainage system running between manholes CM7 and a building. The pipes are made of PVC and are 100mm in diameter. The report notes that the system requires cleaning as it has deposits inside.
This document is a protocol from an inspection of drainage pipes. It includes information about the company performing the inspection, SC EUROSOLAR SRL, their address and contact information. The inspection took place on an underground drainage system running between manholes CM7 and a building. The pipes are made of PVC and are 100mm in diameter. The report notes that the system requires cleaning as it has deposits inside.
SC EUROSOLAR SRL Seite 3 von 19 RO 21433147 J 32/ 544/ 2007 Raiffeisenbank Agnita RO41RZBR0000060009002904 RON Protocol inspectie video / Kanalfernsehprotokoll Datum Nr. Protocol Timpul Operator Curatat Camera 1 senin Sorin Barsan NU MinCam Strada: Plan Nr 1. 700 De la : CP 52 Orasul: Plan Nr 2. Pana la : CP 51 Pos. Parcare magazin Plan Nr 3. Lungimea: 21 m Motivul inspectiei: Conform HAHO Profil: DN 200 Tipil canalizarii: Pluvial Material: PVC KG DIN 19534 Observatii: Sistemul nu prezinta deficiente.
1: Pos. Constatare Poze
Tronsonul nu prezinta depuneri.
CP52 Cp51
SC EUROSOLAR SRL Str. Abatorului Nr. 18 555100 Agnita Tel/Fax: 00 40 (0) 269 510497 Mail: office@eurosolar.ro
SC EUROSOLAR SRL Seite 56 von 82 RO 21433147 J 32/ 544/ 2007 Raiffeisenbank Agnita RO41RZBR0000060009002904 RON Protocol inspectie video / Kanalfernsehprotokoll Datum Nr. Protocol Timpul Operator Curatat Camera 07.11.2007 1 ploios Sorin Barsan NU MinCam Strada: Plan Nr 1. S5L003c De la : CM7 Orasul: Plan Nr 2. Pana la : cladire Pos. Parcare magazin Plan Nr 3. Lungimea: 36 m Motivul inspectiei: conform HAHO Profil: DN 100 Tipil canalizarii: Menajer Material: PVC KG DIN 19534 Observatii: Sistemul necesita curatire.