Deductions From Builder

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Sl.No. Description of Work Qty.

Rate Per Amount


I DEDUCTIONS
A PAINTING WORK
Deduction of Painting ( Living / Dining , M.Bed , Bed 1
, Bed 2 ,Common Toilet ,Bed 1 Toilet & M.Bed Toilet )
2178.00 10.00 L.S 21780.00
B CARPENTRY WORK
Country wood door shutter - rate inclusive of door
shutter, with hardware and painting etc.( Kitchen )
21.00 82.50 Sq.ft 1732.50
C PLUMBING WORK
Toilet EWC, Washbasinmaterial , Labour charges for
fixing etc., ( M.Bed & Bed 1 )
L.S 4912.00 L.S 4912.00
Toilet CP tap fittings material , Labour charges for
fixing etc., ( M.Bed & Bed 1 )
L.S 6008.00 L.S 6008.00
34432.50
-34433.00
1
2
Prepared by Approval by ED - Projects
Note :
Estimate for Additional Alteration works to be Carried out in - Jade block - 1st Floor "E"
Apartment for Mrs.Radhika
Revision - 02 Date : 11.05.12
Total Value of Deductions ( I )
2% Handling Charges (VAT) - extra
Service Tax if any will be extra
Rounded off to
Rupees Thirty Four Thousand Four Hundred Thirty Three Only
1

You might also like