Professional Documents
Culture Documents
LV Mcc-Phase (Star TCC)
LV Mcc-Phase (Star TCC)
kV=10)
.5
10
30
50
100
300
500
1K
3K
5K
10K
10K
10K
5K
Gen1
2.4 MW
5K
2.25kA @ 10kV
3K
3K
Cable17
1-3/C 185
CB2
ABB SACE PR123
Frame = 4000 Plug = 4000 Amps
I1 = 0.95 (3800 Amps)
t1 = 3 LT Band = k/I^2
I2 = 3.8 (15200 Amps)
t2 = 0.25 (I^x)t = OUT
1K
500
300
CB170
1K
500
10KV EDG
300
2SW111
Fuse2
100
ABB
NH3
Other 0.5 kV
630A
50
10kV_Bus1
50
OC1
30
30
10
10kV_Bus2
10
OC2
2SW1
T10-1-C
1-3/C 185
D280+T10.1
1
Fuse1
Bussmann
170M (Size 3)
High 0.69 kV
900A
.5
.3
2 MVA (Secondary) 8 %Z
Delta-Wye Solid Grd
Curve Shift = 1
D280+T10.1
.5
2 MVA (Secondary) 8 %Z
Delta-Wye Solid Grd
Curve Shift = 0.58
.3
CB193
.05
.03
.1
D280+T10.1
Inrush
.05
10kV TRF FDR - 3P
.03
22.6kA @ 10kV
CB192 - 3P
CB2 - 3P
40kA @ 0.4kV
.01
.5
10
30
50
100
300
500
1K
Date:
SN:
Rev:
Fault:
08-01-2014
JACOBSENG
Base
Phase
3K
5K
D280+T10.1
2 MVA
CB192
ME-MCC-1
CB192
.1
10KV EDG - P
OC1
Seconds
Seconds
100
Siemens
7SJ64
CT Ratio 200:1
.01
10K
Fuse1
CB2
ME-MCC-2
Fuse2