This document is a bill of quantities (BQ) for a construction project to build concrete roads and stairs in three villages in Lubuk Batang subdistrict. It details the work items, quantities, units, and costs for site preparation, road and stair construction across five locations, and miscellaneous work. The total cost of the project is not included as all cost fields are blank, likely because this BQ was prepared before construction to estimate costs. It provides a breakdown of materials and activities needed to complete the road and stair infrastructure project across the multiple villages.
This document is a bill of quantities (BQ) for a construction project to build concrete roads and stairs in three villages in Lubuk Batang subdistrict. It details the work items, quantities, units, and costs for site preparation, road and stair construction across five locations, and miscellaneous work. The total cost of the project is not included as all cost fields are blank, likely because this BQ was prepared before construction to estimate costs. It provides a breakdown of materials and activities needed to complete the road and stair infrastructure project across the multiple villages.
This document is a bill of quantities (BQ) for a construction project to build concrete roads and stairs in three villages in Lubuk Batang subdistrict. It details the work items, quantities, units, and costs for site preparation, road and stair construction across five locations, and miscellaneous work. The total cost of the project is not included as all cost fields are blank, likely because this BQ was prepared before construction to estimate costs. It provides a breakdown of materials and activities needed to complete the road and stair infrastructure project across the multiple villages.
This document is a bill of quantities (BQ) for a construction project to build concrete roads and stairs in three villages in Lubuk Batang subdistrict. It details the work items, quantities, units, and costs for site preparation, road and stair construction across five locations, and miscellaneous work. The total cost of the project is not included as all cost fields are blank, likely because this BQ was prepared before construction to estimate costs. It provides a breakdown of materials and activities needed to complete the road and stair infrastructure project across the multiple villages.
PEKERJAAN : PEMBANGUNAN JALAN COR BETON DAN TANGGA LINGKUNGAN
LOKASI : DUSUN I, II, III DESA KURUP KECAMATAN LUBUK BATANG TAHUN ANGGARAN : 2014 NO URAIAN PEKERJAAN VOLUME H. SATUAN JUMLAH HARGA ( Rp ) ( Rp ) 01 02 03 04 05 A. PEKERJAAN PERSIAPAN : 1 Pek. Pengukuran 1.00 Ls 0.00 0.00 2 Pek. Pemasangan Bouwpalnk 1.00 Ls 0.00 0.00 3 Sewa Barak Kerja untuk Direksi Keet 1.00 Ls 0.00 0.00 4 Pembuatan Papan Nama Proyek 1.00 Unit 0.00 0.00 0.00 B. PEKERJAAN KONSTRUKSI : 1 Pek. Pembuatan Jalan Cor Beton Lokasi ( 1 ) Type 3.00 M a Pek. Cor beton ad 1:2:3 33.00 M3 0.00 0.00 b Pek. Aspal Laburan 107.25 Liter 0.00 0.00 c Pek. Agregat Penutup Burtu 165.00 M2 0.00 0.00 d Pek. Cor Plat Bertulang ad 1:2:3 0.45 M3 0.00 0.00 Type. 1.50 M a Pek. Cor beton ad 1:2:3 18.60 M3 0.00 0.00 b Pek. Aspal Laburan 120.90 Liter 0.00 0.00 c Pek. Agregat Penutup Burtu 186.00 M2 0.00 0.00 d Pek. Cor Plat Bertulang ad 1:2:3 0.225 M3 0.00 0.00 Type. 1.20 M a Pek. Cor beton ad 1:2:3 2.88 M3 0.00 0.00 b Pek. Aspal Laburan 18.72 Liter 0.00 0.00 c Pek. Agregat Penutup Burtu 28.80 M2 0.00 0.00 d Pek. Cor Plat Bertulang ad 1:2:3 0.18 M3 0.00 0.00 Type. 2.00 M a Pek. Cor beton ad 1:2:3 80.40 M3 0.00 0.00 b Pek. Aspal Laburan 348.40 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 536.00 M2 0.00 0.00 d Pek. Cor Plat Bertulang ad 1:2:3 0.30 M3 0.00 0.00 0.00 Pek. Tangga Lingkungan Lokasi ( 1 ) a Pekerjaan Galian Tanah u/ Pondasi tangga 5.00 M3 0.00 0.00 b Pek. Batu Karang U/ Pondasi Tangga dan Anak Tangga, Bordes 24.72 M3 0.00 0.00 c Pek. Cor ad 1:2:3 Untuk Tapaan Tangga 30.00 M3 0.00 0.00 d Pek. Plesteran ad 1:4 U/ dinding tangga 90.00 M2 0.00 0.00 0.00 2 Pek. Pembuatan Jalan Cor Beton Lokasi ( 2 ) Js. Type 2 .00 M a Pek. Cor beton ad 1:2:3 10.50 M3 0.00 0.00 b Pek. Aspal Laburan 45.500 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 70.00 M2 0.00 0.00 0.00 Pek. Tangga Lingkungan Lokasi ( 2 ). 2 Lokasi a Pekerjaan Galian Tanah u/ Pondasi tangga 24.00 M3 0.00 0.00 b Pek. Batu Karang U/ Pondasi Tangga dan Anak Tangga, Bordes 25.66 M3 0.00 0.00 c Pek. Cor ad 1:2:3 Untuk Tapaan Tangga 24.00 M3 0.00 0.00 d Pek. Plesteran ad 1:4 U/ dinding tangga 72.00 M2 0.00 0.00 0.00 3 Pek. Pembuatan Jalan Cor Beton Lokasi ( 3 ) Js. Type 2 .00 M a Pek. Cor beton ad 1:2:3 60.90 M3 0.00 0.00 b Pek. Aspal Laburan 263.90 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 406.00 M2 0.00 0.00 d Pek. Cor Plat Bertulang ad 1:2:3 0.30 M3 0.00 0.00 0.00 4 Pek. Pembuatan Jalan Cor Beton Lokasi ( 4 ) Js. Type 1 .00 M a Pek. Cor beton ad 1:2:3 4.10 M3 0.00 0.00 b Pek. Aspal Laburan 26.65 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 41.00 M2 0.00 0.00 Js. Type 1 .20 M a Pek. Cor beton ad 1:2:3 8.76 M3 0.00 0.00 b Pek. Aspal Laburan 56.94 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 87.60 M2 0.00 0.00 Js. Type 2.00 M a Pek. Cor beton ad 1:2:3 201.00 M3 0.00 0.00 b Pek. Aspal Laburan 871.00 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 1,340.00 M2 0.00 0.00 d Pek. Cor Plat Bertulang ad 1:2:3 0.30 M3 0.00 0.00 Js. Type 4. 00 M ( JALAN KE SD NEGERI KURUP ) a Pek. Cor beton ad 1:2:3 40.00 0.00 0.00 b Pek. Aspal Laburan 130.00 0.00 0.00 c Pek. Agregat Penutup Burtu 200.00 0.00 0.00 0.00 JUMLAH. JUMLAH. JUMLAH. JUMLAH. JUMLAH. JUMLAH. 1 Pek. Tangga Lingkungan Lokasi ( 4 ) a Pekerjaan Galian Tanah u/ Pondasi tangga 4.80 M3 0.00 0.00 b Pek. Batu Karang U/ Pondasi Tangga dan Anak Tangga, Bordes 5.63 M3 0.00 0.00 c Pek. Cor ad 1:2:3 Untuk Tapaan Tangga 4.80 M3 0.00 0.00 d Pek. Plesteran ad 1:4 U/ dinding tangga 14.40 M2 0.00 0.00 0.00 5 Pek. Pembuatan Jalan Cor Beton Lokasi ( 5 ) Js. Type 2 .00 M a Pek. Cor beton ad 1:2:3 138.90 M3 0.00 0.00 b Pek. Aspal Laburan 601.90 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 926.00 M2 0.00 0.00 Js. Type 3.00 M a Pek. Cor beton ad 1:2:3 258.00 M3 0.00 0.00 b Pek. Aspal Laburan 838.50 Ltr 0.00 0.00 c Pek. Agregat Penutup Burtu 1,290.00 M2 0.00 0.00 0.00 C PEKERJAAN LAIN - LAIN 1 Perataan Tanah dan Pembersihan 1.00 Ls 0.00 0.00 2 Dokumentasi, Pelaporan dan Back Up Data 1.00 Ls 0.00 0.00 3 Biaya Air Kerja 1.00 Ls 0.00 0.00 0.00 A PEKERJAAN PENDAHULUAN 0.00 B PEKERJAAN KONSTRUKSI LOKASI 1 PEKERJAAN JALAN COR BETON AD. 1:2:3 0.00 PEKERJAAN PEMBUATAN TANGGA 0.00 PEKERJAAN KONSTRUKSI LOKASI 2 PEKERJAAN JALAN COR BETON AD. 1:2:3 0.00 PEKERJAAN PEMBUATAN TANGGA 0.00 PEKERJAAN KONSTRUKSI LOKASI 3 PEKERJAAN JALAN COR BETON AD. 1:2:3 0.00 PEKERJAAN KONSTRUKSI LOKASI 4 PEKERJAAN JALAN COR BETON AD. 1:2:3 0.00 PEKERJAAN PEMBUATAN TANGGA 0.00 PEKERJAAN KONSTRUKSI LOKASI 5 PEKERJAAN JALAN COR BETON AD. 1:2:3 0.00 C PEKERJAAN LAIN-LAIN 0.00 SUB JUMLAH - - 0.00 PPN 10 % - - 0.00 JUMLAH - - 0.00 DIBULATKAN - - 0.00 Terbilang : NOL REKAPITULASI JUMLAH. JUMLAH. BATURAJA, 2014