Professional Documents
Culture Documents
Water Dams - Cover Letter
Water Dams - Cover Letter
From
Dr. G. Rajesh Kumar
Prof and Head, Structures Division
To
The General Manager RG-II Area
GDK-9 Incline,
Singareni Colleries Company Limited
Ramagundam
Sir,
Sub: Report on Third Party Quality Control Check for Construction of Water
Dams at Gdk 9 Incline–Ramagundam Area–II, Singareni Collieries Company
Limited—Reg
With reference to the letter cited above please find enclosed herewith a report
on the Third Party Quality Control Check for Construction of Water Dams at Gdk 9
Incline–Ramagundam Area–II, Singareni Collieries Company Limited.
Thanking you
Yours truly,
Encl: As above
REPORT ON
Structures Division