This document provides a checklist for installing and commissioning a Power and Water Solutions (PWS) system. The checklist includes earthing PCBs and boxes, checking the DC power supply, sensor thresholds and terminations, signal phasing and communication to the SCADA system, protective relay connections, pilot sensor calibration, and documenting measurements for a station, box, panel and load. The final items are checking the PW relay with a removed pilot connector and signing off that the work was checked.
This document provides a checklist for installing and commissioning a Power and Water Solutions (PWS) system. The checklist includes earthing PCBs and boxes, checking the DC power supply, sensor thresholds and terminations, signal phasing and communication to the SCADA system, protective relay connections, pilot sensor calibration, and documenting measurements for a station, box, panel and load. The final items are checking the PW relay with a removed pilot connector and signing off that the work was checked.
This document provides a checklist for installing and commissioning a Power and Water Solutions (PWS) system. The checklist includes earthing PCBs and boxes, checking the DC power supply, sensor thresholds and terminations, signal phasing and communication to the SCADA system, protective relay connections, pilot sensor calibration, and documenting measurements for a station, box, panel and load. The final items are checking the PW relay with a removed pilot connector and signing off that the work was checked.
DC power supply check +/- setting threshold check all green connectors and sensor termination phasing of sensors check signal to Scada check C connection on P! relay check nos" of turns on pilot sensor take measurement and tabulate below Station : Box No. Panel No. Load (sec A) Pilot (mA) Vop (mV) Vop (mV) ith !C PW" # Pilot $C % remo&e pilot connector Checked B# : $ate :