1. A project review meeting was held between Sthapati Architects, the client KLR Factory, and various vendors to discuss the construction of KLR's new factory in Gurgaon.
2. Key discussion points included the locations of electrical, data/voice cabling, and security installations. Samples of gypsum false ceilings and partitions were presented, and air conditioning options using cassette or high wall mounted units were presented.
3. Action items were assigned, including Trinitron providing electrical shop drawings by December 30th, and the client arranging further meetings with data/voice and security vendors. The client was also tasked with deciding on false ceiling, partition, and air conditioning options.
1. A project review meeting was held between Sthapati Architects, the client KLR Factory, and various vendors to discuss the construction of KLR's new factory in Gurgaon.
2. Key discussion points included the locations of electrical, data/voice cabling, and security installations. Samples of gypsum false ceilings and partitions were presented, and air conditioning options using cassette or high wall mounted units were presented.
3. Action items were assigned, including Trinitron providing electrical shop drawings by December 30th, and the client arranging further meetings with data/voice and security vendors. The client was also tasked with deciding on false ceiling, partition, and air conditioning options.
1. A project review meeting was held between Sthapati Architects, the client KLR Factory, and various vendors to discuss the construction of KLR's new factory in Gurgaon.
2. Key discussion points included the locations of electrical, data/voice cabling, and security installations. Samples of gypsum false ceilings and partitions were presented, and air conditioning options using cassette or high wall mounted units were presented.
3. Action items were assigned, including Trinitron providing electrical shop drawings by December 30th, and the client arranging further meetings with data/voice and security vendors. The client was also tasked with deciding on false ceiling, partition, and air conditioning options.
OFFICE: 15 ABUL FAZAL ROAD, BENGALI MARKET, NEW DELHI 110 001 TEL : 43105233, 2335 8400 email : sthapati@hotmail.com
MINUTES OF MEETING Project Review Meeting for Construction of KLR Factory, Plot #34, Sector 33, Gurgaon
Venue: Sthapati Office Date: 27 th Dec 2013 Attendees: Client Mr. Anup Pal (KLR) Architects Manish Jain Vipul Gupta Vendors Mr. Manish (Trinitron) Mr. Ashish (Sopan) Mr. Vashisth (Sopan)
The following were decided: 1. ELECTRICAL (TRINITRON): Location of various installations was discussed and clarified, based on the discussion; Trinitron will provide shop drawings by 30 th Dec 2013. 2. DATA / VOICE CABLES: Issue discussed, client to arrange meeting with vendor (HP). 3. SECURITY: Issue discussed, client to arrange meeting with vendor (HP). 4. FIRE: Issue discussed, client desires provision of fire detection as per norms, smoke detectors to be provided. Sthapati to do the needful along with the vendor. 5. PIPELINES (SOPAN): Location of various installations was discussed and clarified, based on the discussion; the route of the pipelines was decided, however whether the pipelines are to be provided above false ceiling or below is yet to be confirmed by the client. Sthapati to coordinate and facilitate fixing of saddles for the pipes. 6. FALSE CEILING: Samples of gypsum false ceiling were shown and handed over; the pros and cons were discussed. Client to decide. 7. PARTITIONS: Samples of gypsum partition were shown and handed over, the pros and cons vis--vis aluminum partition were discussed. The glass in partitions could be toughened. Client to decide. 8. AIR CONDITION: Client was informed about the availability of 3.0 TR split AC machines. Which could be: a. Cassette units, approx price 1.10 lacs; b. High wall mounted units, approx. price 0.75 lacs, these are three phase industrial units with a higher airflow. Both are available by Carrier, Panasonic, and Blue Star. Client to decide.