This document contains calculations related to steam usage at a sugar mill. It provides details on the steam requirements for various processes and equipment including the powerhouse, milling station, boiler station, and central and field stations. Steam conditions such as pressure, temperature and enthalpy are specified for different steam types. The total steam demand is calculated as 67.15 tons/hour for new steam and 59.52 tons/hour for exhaust steam. A steam balance is presented showing the production and usage of new and exhaust steam.
This document contains calculations related to steam usage at a sugar mill. It provides details on the steam requirements for various processes and equipment including the powerhouse, milling station, boiler station, and central and field stations. Steam conditions such as pressure, temperature and enthalpy are specified for different steam types. The total steam demand is calculated as 67.15 tons/hour for new steam and 59.52 tons/hour for exhaust steam. A steam balance is presented showing the production and usage of new and exhaust steam.
This document contains calculations related to steam usage at a sugar mill. It provides details on the steam requirements for various processes and equipment including the powerhouse, milling station, boiler station, and central and field stations. Steam conditions such as pressure, temperature and enthalpy are specified for different steam types. The total steam demand is calculated as 67.15 tons/hour for new steam and 59.52 tons/hour for exhaust steam. A steam balance is presented showing the production and usage of new and exhaust steam.
Sabut % tebu = % = Dalam proses pengumpulan data Uap tekanan 18 kg/cm2 = Hasil perhitungan kebutuhan uap Pressure = 18 kg/cm2 Temperatur = 340 'C Enthalpy = 745 kcal/kg Uap tekanan 17 kg/cm2 Pressure = 17 kg/cm2 Temperatur = 325 'C Enthalpy = 738 kcal/kg Uap bekas 0.5 kg/cm2 Pressure = 0,5 kg/cm2 Temperatur = 150 'C Enthalpy = 664 kcal/kg # KEBUTUHAN UAP BARU POWER HOUSE 1. T/A Shinko Power maksimal = kW Power terpakai = kW ( 71 % ) 2900 12,5 3500 2500 Power terpakai = kW ( 71 % ) Steam consumption = 12 kg/kWh G = N x Steam Consmpt = x 12 = kg/h = ton/h 2. TA Kanis (OFF) Power maksimal = kW Power terpakai = kW N x x = kg/jam = ton/jam Jika TA Allen I dan II operasional, maka kebutuhan uap : G = 2 x = STASIUN GILINGAN 1. Turbin CC II (EBARA) Power = 298 kW Power terpakai = 238 kW Inlet steam = 17 kg/cm2 Steam chest = 12 kg/cm2 Power needed ( N' ) : 12 x 2500 0 0 0,00 2500 30000 30 2500 G = 860 kg/jam h = 0 860 81,00 0,00 0,00 N' = 238 = kW Steam consumption = 14,0 kg/kWh G = N x Steam Consmpt = x 14,0 = kg/h = ton/h 2 Turbin Unigrator (DRESER REND) Power = 820 kW Power terpakai = 660 kW Inlet steam = 17 kg/cm2 Steam chest = 7 kg/cm2 Power needed ( N' ) : 7 x = kW Steam consumption = 25,0 kg/kWh G = N x Steam Consmpt = x 25,0 N' = 660 17 272 272 6794,1 N' = 17 168 168 2356,0 2,36 = x 25,0 = kg/h = ton/h 3 Turbin Penggerak Gilingan I (DRESER REND) Power = 328 kW Power terpakai = 286 kW Inlet steam = 17 kg/cm2 Steam chest = 7 kg/cm2 Power needed ( N' ) : 7 x = kW Steam consumption = 25,0 kg/kWh G = N x Steam Consmpt = x 25,0 = kg/h = ton/h 4 Turbin Penggerak Gilingan II (DRESER REND) Power = 328 kW Power terpakai = 198 kW Inlet steam = 17 kg/cm2 Steam chest = 7 kg/cm2 Power needed ( N' ) : 7 x 272 6794,1 6,79 N' = 286 17 118 118 2944,1 2,94 N' = 198 17 = kW Steam consumption = 25,0 kg/kWh G = N x Steam Consmpt = x 25,0 = kg/h = ton/h Total kebutuhan uap stasiun gilingan : G = ton/jam STASIUN KETEL 1. TU penggerak FWP KU. Stork I Daya turbin = 75 HP = 56,0 kW Asumsi tenaga terpakai = 95 % Tekanan uap masuk = 17 kg/cm2 Kebutuhan uap : N x 1 x 56,0 x 860 82 82 2038,2 14,13 2,04 G = 860 kg/jam h = 73,66 620,57 = kg/jam = ton/jam 2 TU penggerak FWP KU. Stork II Daya turbin = 75 HP = 56,0 kW Asumsi tenaga terpakai = 95 % Tekanan uap masuk = 17 kg/cm2 Kebutuhan uap : N x 1 x 56,0 x 860 = kg/jam = ton/jam 3 Turbin penggerak IDF JTA Power = 191 kW Power terpakai = 191 kW Inlet steam = 18 kg/cm2 Steam chest = 12 kg/cm2 Power needed ( N' ) : 12 x = kW Steam consumption = 14,0 kg/kWh G = N x Steam Consmpt = x 14,0 = 73,66 620,57 0,62 G = 860 kg/jam h = 73,66 620,57 0,62 N' = 191 18 127 127 = kg/h = ton/h 4 Turbin penggerak FDF JTA Power = 59 kW Power terpakai = 59 kW Inlet steam = 18 kg/cm2 Steam chest = 7 kg/cm2 Power needed ( N' ) : 7 x = kW Steam consumption = 25,0 kg/kWh G = N x Steam Consmpt = x 25,0 = kg/h = ton/h 5 Turbin Penggerak FWP JTA Power = 59 kW Power terpakai = 59 kW 23 23 573,6 0,57 1782,7 1,78 N' = 59 18 Power terpakai = 59 kW Inlet steam = 18 kg/cm2 Steam chest = 7 kg/cm2 Power needed ( N' ) : 7 x = kW Steam consumption = 25,0 kg/kWh G = N x Steam Consmpt = x 25,0 = kg/h = ton/h 6 Uap Pemanas Deaerator Kondisi uap pemanas : Tekanan uap = kg/cm2 Temperatur uap = 'C Enthalpy = kJ/kg Air pengisi ketel : m ( JTA ) = 40 + 0.1 x 40 ton/jam = 12 kg/dtk m ( Stork I ) = 20 + 0.1 x 20 ton/jam = 6,1 kg/dtk m ( Stork II ) = 20 + 0.2 x 20 ton/jam = 6,1 kg/dtk T in = 'C T out = 'C Cp = kJ/kg'C Kebutuhan uap pemanas deaerator : Q (CC) = m x Cp x T = 12 x x ( 100 - 60 ) N' = 59 18 23 23 573,6 0,57 17 325 738 60 100 1,007 1,007 = kJ/dtk G (CC) = Q / h x 3600 x 1000 = ton/jam Q (St I) = m x Cp x T = 6 x x ( 100 - 60 ) = kJ/dtk G (St I) = Q / h x 3600 x 1000 = ton/jam Q (St II) = m x Cp x T = 6 x x ( 100 - 60 ) = kJ/dtk G (St II) = Q / h x 3600 x 1000 = ton/jam = 492,31 738 1,007 246,16 = 246,16 738 2,40 1,20 1,20 492,31 1,007 246,16 = 246,16 738 Total kebutuhan uap ST. Ketel G = ton/jam MESIN UAP DI STASIUN TENGAH DAN PUTERAN Tenaga yang diperlukan ( T ), Hugot 1972, p.825 : T = x V x n (HP) V = volume silinder dalam ft 3 = S x L = D 2 L = panjang langkah dalam ft n = Rpm mesin uap Kebutuhan uap : 632 x T h x Eff.th x 1000 Eff.th = 0,6 (slide valve engine,Tromp) Data perhitungan Uap baru tekanan rendah: Pressure = 7 kg/cm2 Temperatur = 180 'C Enthalpy = 668 kcal/kg Uap bekas : Pressure = 0,5 kg/cm2 Temperatur = 115 'C Enthalpy = 647 kcal/kg MU pompa vakum BP 8,98 0,0736 0.785 x G = ton/jam Mesin Uap L D n V T G 2,62 1,64 60 11,06 48,86 2,45 MU pompa vakum KP UAP BARU UNTUK SERVICE STEAM (TEK. 3 kg/cm 2 ) 1. Puteran SHS Pemakaian uap = 20% x produksi SHS (Hugot 1972, p.745) Produksi SHS = 250 ton/hari = 10 ton/jam Kebutuhan uap = 2,1 ton/jam Total kebutuhan uap untuk service steam : G = 2,1 ton/jam # KEBUTUHAN UAP BEKAS Dasar Perhitungan : Kapasitas = 2900 TCD Nira Mentah % Tebu = 100 % Brix Nira Mentah = 12,5 % Nira Encer % Tebu = 105 % Brix Nira Encer = 11,5 % Brix Nira Kental = 64 % Panas laten ( r ) Ube 0.5 kg/cm2 = 531 kcal/kg Total 4,90 2,62 1,64 60 11,06 48,86 2,45 Panas laten ( r ) Ube 0.5 kg/cm2 = 531 kcal/kg Panas laten ( r ) Uni 0.25 kg/cm2 = 535 kcal/kg 1. Pemanas Pendahuluan ( Juice Heater ) J = berat NM%T = ton/jam C = panas jenis NM = ( 1 - 0.006 bnm ) = kcal/kg'C p = faktor kehilangan panas pada heater = ( Hugot p.449 ) Pemanas Pendahuluan I : x x ( 75 - 30 ) 531 x 0,95 = ton/jam Ube Pemanas Pendahuluan II : x x ( 105 - 75 ) 531 x 0,95 = ton/jam Ube Total kebutuhan Uap untuk Pemanas Pendahuluan : G = ton/jam 2. Badan Penguapan ( Evaporator ) Data Luas Pemanas ( LP ) : Jadwal sekrap BP : = 1000 m 2 4 - 5 - (3+1B) - 2 G = J x C x ( t2 - t1 ) r x p 120,83 0,9993 0,95 G = 120,83 0,9993 10,771 G = 120,83 0,9993 7,1807 17,952 BP 1 = 1000 m 2 4 - 5 - (3+1B) - 1A = 750 m 2 = 750 m 2 = 525 m 2 = 525 m 2 LP terbesar = m 2 LP terkecil = m 2 bne bnk E = jumlah air yang diuapkan ( ton/jam ) J = berat NE%T = ton/jam 11,5 64 = ton/jam Jika BP 1 + 2 sebagai badan pertama : = ton/jam Skema BP operasional? Jika BP 1B+2 sebagai badan pertama : BP 2 BP 3 BP 4 BP 5A BP 5B 4025 3550 E = J x ( 1 - ) 127 E = 127 x ( 1 - ) 104,08 G = 2000 x 104,08 4025 51,7154 G = 1750 x 104,08 Skema BP operasional? Jika BP 1B+2 sebagai badan pertama : = ton/jam 3. Pan Masakan Dari perhitungan material balance didapatkan data sbb : % Brix Strop /Klare Masakan A Masakan C Masakan D Kebutuhan uap pemanas Masakan A : = ton/jam Kebutuhan uap pemanas Masakan C : = ton/jam Kebutuhan uap pemanas Masakan D : G = 1750 x 104,08 3550 51,3056 Masakan % Tebu % Brix Faktor cuci 20,17 93 81 1,27 98 80,0 1,38 G = KG x Mas.A%T x ( %BrixMas.A - %BrixMas.A G = KG x Mas.C%T x ( %BrixMas.C ) %BrixNK = 120,83 x 0,2017 x ( 0,93 - 0,93 ) 0,64 = 120,83 x 0,0501 x ( 0,95 - 0,95 0,81 1,7807 G = KG x Mas.D%T x ( %BrixMas.D %BrixMas.D - 1,32 faktor cuci 1,27 faktor cuci - %BrixMas.C ) x %BrixStropA ) x 16,192 x x 5,01 95 86,5 1,32 9,55 = ton/jam Total kebutuhan uap pemanas Pan Masakan : G = ton/jam NERACA UAP BARU Produksi Uap Baru ton/jam Pemakaian Uap Baru ton/jam KU JTA 35 ST. Listrik KU Stork I 16 ST. Gilingan KU Stork II 16 ST. Ketel ST. Tengah dan Puteran Service steam Losses 5% Surplus/(minus) Total Produksi Total Pemakaian G = KG x Mas.D%T x ( (%BrixStropC+%BrixKlareD)/2 = 120,83 x 0,0955 x ( 0,98 - 0,98 0,8325 %BrixMas.D 14,13 8,98 4,90 2,1 3,00 4,05 - 3,14 21,113 67,15 67,15 30,00 Perbandingan jumlah uap sebelum dan sesudah desuperheater : h1 ( 0.5 ; 150 ) = 664 kcal/kg h2 ( 0.5 ; 120 ) = 650 kcal/kg r sprayer = 538 kcal/kg G1 x ( h1 - h2 ) r G1 x ( 664 - 650 ) 538 G2 = G1 x ( 1 + ) G1 : G2 = 1 : NERACA UAP BEKAS Produksi Uap Bekas ton/jam Pemakaian Uap Bekas ton/jam ST. Listrik Pemanas Pendahuluan Bleeding untuk JH dan VP belum diperhitungkan ST. Gilingan Badan Penguapan ST. Ketel Pan Masakan ST. Tengah dan Puteran Losses 5% Surplus/(minus) Total Produksi Total Pemakaian G2 = G1 + G2 = G1 + -35,8 59,52 59,52 0,026 1,026 30,78 17,95 14,50 51,72 9,21 21,11 5,03 4,54 Dalam proses pengumpulan data Hasil perhitungan kebutuhan uap N x = 2500 G = 860 h x = kg/jam = ton/jam = 2500 81,00 26543 26,54 G = h Kebutuhan uap turbin : G = N' x 860 h h = 0 x 860 ### faktor cuci %BrixMas.D ) x 1,32 faktor cuci 1,27 faktor cuci faktor cuci 0,98 ) x 1,38 %BrixMas.D ) x Bleeding untuk JH dan VP belum diperhitungkan 860 860 kg/jam h kg/jam ton/jam 860 81,00 kg/jam h kg/jam