STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-

NTPC REF NO: SIM/1/TS/ /


SHEET 1 OF 3
PLANT AREA : ELECTRICAL SYSTEM
TESTING SCHEDULE : 500 MW STEAM TURBINE GENERATOR
1. PLANT DETAILS
GENERATOR SYSTEM CONSISTS OF TURBOGENERTOR, EXCITER,
GENERATOR PROTECTION, EXCITATION CONTROL SYSTEM.
NAME PLATE DETAILS
RATED DATA & O/P TURBO GEN. MAIN EXCITER PILOT EXCITER
APPARENT POWER 588 MVA ------ 65 VA
ACTIVE POWER 5!! MW "#8! W ------
CURRENT 16166 A 6"!! A 1$5 A
VOLTAGE %1 & 1.!5 V 6!! V %%! & %% V
FRE'UENCY 5! () ------ *!! ()
PF !.85+LAG, ------ ------
STATOR WDG CONN YY ------ ----
(YDROGEN PRESS ".5 BAR ----- -----
CONT PERM UNBAL
LOAD
8 - ------ ------
RATED FIELD
VOLTAGE
CURRENT
"*! V
*!*! A
------ -------
%. TESTING OB.ECTIVE
TO TEST T(E C(ARACTERISTICS OF GENERATOR AND REACTIVE
CAPABILITY RESPONSES OF GENERATOR.
/, MEASUREMENT OF WINDING , INSULATION RESISTANCE
//, OPEN & S(ORT CIRCUIT C(ARACTERISTICS
///, REACTIVE CAPABILITY CURVE RESPONSE C(ECING
".PROPOSAL
I S(ORT CIRCUIT C(ARACTERISTIC
GENERATOR P(ASE TERMINALS ARE S(ORTED TOGET(ER.
MAC(INE IS EXCITED AT T(E FULL SPEED OF PRIME MOVER+STEAM
TURBINE,. A C(ARACTERISTIC CURVE IS PLOTTED BETWEEN
EXCITATION CURRENT AND GENERATOR CURRENT
II OPEN CIRCUIT C(ARACTERISTIC
GENERATOR P(ASE TERMINALS ARE OPENED AS USUAL.
MAC(INE IS EXCITED AT T(E FULL SPEED OF PRIME MOVER+STEAM
TURBINE,. A C(ARACTERISTIC CURVE IS PLOTTED BETWEEN
EXCITATION CURRENT AND GENERATOR TERMINAL VOLTAGE.
GENERATOR PROTECTIONS ARE ONE-BY-ONE T(ROUG(LY
C(ECED. GENERATOR PT0 ARE P(ASE IN-P(ASE OUT WIT( GRID
/v!/"""/##$/%&'v(!$)&'/*+#/$%!*%,-1/./.5//03012&%
STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-
NTPC REF NO: SIM/1/TS/ /
SHEET . OF 3
PLANT AREA : ELECTRICAL SYSTEM
TESTING SCHEDULE : 500 MW STEAM TURBINE GENERATOR
PT0. WIT(IN PERMISSIBLE LIMITS OF VOLTAGE DIFFERENCE +*-, &
FRE'UENCY +!.1 (1, ,GENERATOR IS SYNC(RONISED WIT( GRID.
*.SERVICES RE'UIRED
GENERATOR CIRCUIT BREAER,EXCITATION SYSTEM,FIRE
PROTECTION SYSTEM,%%! V DC SUPPLY,DM CW SYSTEM, LUBE OIL
SYSTEM,AUX COOLING WATER SYSTEM,(YDROGEN COOLING SYSTEM,
GENERATOR PROTECTION SYSTEM
5.! SAFETY PRECAUTIONS
I, FIRE EXTINGUIS(ER SYSTEM2S READINESS
II, GENERATOR CABIN IS TO BE LOCED AND INSPECTION WINDOW
MUST BE GLASS COVERED.
III, 3GENERATOR ONLINE/DANGER %1 V2 CAUTION BOARD TO BE FIT
IV, MEN & MATERIALS TO BE EPT AWAY FROM GENRATOR
6. EMERGENCY PROCEDURE
GENERATOR TO BE TRIPPED. EXCITATION & GENERATOR TRANSFORMER
BACC(ARGING TO BE PUT OFF. CO
%
WILL BE RELEASED ON FIRE
DETECTION.
#. STATE OF T(E PLANT
AFTER T(E ERECTION OF GENERATOR,(% GAS TO BE FILLED IN
T(E ROTOR AFTER PASSING T(E (YDROGEN LEAAGE SYSTEM.COOLING
SYSTEM TO BE IN CIRCULATWED MODE. BEARING COOLINGS TO BE
ENSURED.POWER & CONTROL CIRCUIT OF GENERATOR & EXCITATION
SYSTEM TO BE VERIFIED. FIRE PROTECTION SYSTEM EPT READY.
8. COMMISSIONING PROCEDURE
C(EC T(E POLARISATION INDEX & WINDING RESISTANCE
VALUES OF GENERATOR ARE WIT(IN T(E PERMISSIBLE LIMITS AS PER
STANDARD. NO PROTECTION OPERATED .EXCITATION SYSTEM IS READY
FOR GIVING FULL EXCITATION. T(EN DO T(E PROCEDURES AS IN SEC
".!
$. COMPLETION CRETERIA
GENERATOR IS WIT(STANDING FULL LOAD WIT( PERMISSIBLE
VARIATION OF ITS PARAMETERS LIE WINDING TEMP,FRAME TEMP
ETC. TRIAL RUN OF GENERATOR IS SUCESSFULLY COMPLETED
/v!/"""/##$/%&'v(!$)&'/*+#/$%!*%,-1/./.5//03012&%
STATION: NTPC SIMHADRI BHEL REF NO : PS-DC-186-500-
NTPC REF NO: SIM/1/TS/ /
SHEET 3 OF 3
PLANT AREA : ELECTRICAL SYSTEM
TESTING SCHEDULE : 500 MW STEAM TURBINE GENERATOR
1!. APPENDICES
DRAWINGS4 O & M MANUAL OF GENERATOR,EXCITATION SYSTEM
SC(EMATIC DRAWINGS OF STATOR COOLING,(%
FILLING SYSTEM
LOG S(EETS 4 I, IR VALUES,WR VALUES OF GENERATOR
II, OCC,SCC TEST REPORTS
III, LIST OF PROTECTIONS INCLUED
IV, READINESS OF AUX SYSTEMS
---------------------------- 5 --------------------5
-----------------