The document provides a work rate schedule for supply and installation of MS pipes and structures. It includes 3 parts - supply portion, work portion, and expenses. The supply portion totals Rs. 439260. The work portion such as erection, fabrication, and painting totals Rs. 650005. With overhead costs, the total is Rs. 1361581. Expenses for manpower, consumables, and transportation totals Rs. 278400 with overhead costs. In total, the work rate schedule amounts to Rs. 1361581 for supply and installation and Rs. 278400 for expenses.
The document provides a work rate schedule for supply and installation of MS pipes and structures. It includes 3 parts - supply portion, work portion, and expenses. The supply portion totals Rs. 439260. The work portion such as erection, fabrication, and painting totals Rs. 650005. With overhead costs, the total is Rs. 1361581. Expenses for manpower, consumables, and transportation totals Rs. 278400 with overhead costs. In total, the work rate schedule amounts to Rs. 1361581 for supply and installation and Rs. 278400 for expenses.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The document provides a work rate schedule for supply and installation of MS pipes and structures. It includes 3 parts - supply portion, work portion, and expenses. The supply portion totals Rs. 439260. The work portion such as erection, fabrication, and painting totals Rs. 650005. With overhead costs, the total is Rs. 1361581. Expenses for manpower, consumables, and transportation totals Rs. 278400 with overhead costs. In total, the work rate schedule amounts to Rs. 1361581 for supply and installation and Rs. 278400 for expenses.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
No. Supply portion 1. Supply of M.S. Pipe Ø 100 Nb. X 4.5 mm. RMT 540 755/- 407700.00 Thickness. work of turbine roof water drain lines Unit no. 5. 2. Supply of Structure of steel channels 75 mm. X 50 RMT 100 264/- 26400.00 mm. as per specification 3. Supply of Red oxide paint Ltrs 20 98/- 1960.00 4. Supply of Anti corrosive paint Ltrs 20 160/- 3200.00 TOTAL (A) 439260.00 Work portion 1. Erection of M.S. Pipe Ø100 Nb. X 4.5 mm. turbine RMT 540 332/- 179280.00 roof to ground level at turbine roof water drain lines Unit no. 5. ( upto 0 mtr. To 45 mtr. Height) 2. Fabrication of Ø 100 Nb. X 4.5 mm. of 90 0 & 450 NO. 50 2065/- 103250.00 bends Unit no.5 3. Welding of MSERW pipe line of 100 Nb. X 4.5 No. 240 455/- 109200.00 mm. 4. Removing of Old M.S. Pipe turbine roof to ground RMT 540 315/- 170100.00 level Unit no. 5. (UP to 45 meter elevation) 5. Hanger support as per requirement No. 85 275/- 23375.00 (Fabrication&Erection) 6. Applying one coat of red oxide paint to the M. S pipe RMT 540 60/- 32400.00 & structure upto 0 to 45 mtrs of elevation 7. Applying Two coat of Anti corrosive paint paint to RMT 540 60/- 32400.00 the M. S pipe & structure upto 0 to 45 mtrs of elevation TOTAL (B) 650005.00 TOTAL (A + B) = 1089265.00 Overhead Cost & Profit 25% 272316.00 GRAND TOTAL 1361581.00
Sr. No. Particulars Qty OT/Hr No of Days Rate Amount