Dependent demand on 34-720

Month

Units of
BV [34PVB [34BV [34850]
720]
850]
per unit of
Demand
demand
PVB [34720]

September

5000

10000

October

5000

10000

November
5000
2
December
4000
2
January
4000
2
Monthly Average in demand for BV [34Sample Standard Deviation in demand
PVB = Pressure Vaccum Breaker
BV = Ball Valve

10000
8000
8000
9200
1095.45

Lead time
CSL
Safety Stock

Demand for Ball Valve [34-850]

Independent

Dependant on PVB

Mean

Standard Deviation

Mean

Standard
Deviation

50

10

9200

1095.45

Standard deviation
Lead Time
SD (DDLT)

1095.491 239.0557
54
9.01211197 2154.397

Days
Lead time
CSL
Safety Stock

Z*Stand(DDLT)

Z
54 NA
0.99

2.32
4998.2

Periodic
Review

TIME

FOR 22 DAYS
1.237189 27.21816

4896
FOR 22 DAYS

Ball Valve
34-720

722-1
Body, 3/4 " 720
finished
(1)

722-1-000, Body ,
3/4" -1" 720 Raw (1)

721A-12 Plastic
Washer , 1/2 " (1)

34-850 Ball valve, 3/4


" (2)

0 Ball valve, 3/4

IS 720 Instruction
Sheet , 720, (1)

RK1-720 Repair
Kit, 1/2"-1" 720

721A-12 Plastic
Washer , 1/2"-1"
720 (1)

IS720, Instruction
Sheet, 1/2"-2"
720 (1)

Level 0
Gross Requirements
Scheduled Receipts
Projected On-Hand
Net Requirements
Planned Order

Level 0
Gross Requirements
Scheduled Receipts
Projected On-Hand
Net Requirements
Planned Order

Item: PVB 34-720, 3/4" 720 w/BV


Month 1
Month 2
5000
5000
9600

9600
0
0

4600
400
400

Item: RK1-720 Repair Kit, 1/2" - 1" 720, SS=400


Month 1
Month 2
517
662
482

482
435
435

Month 3
5000

5000

Month 3
578

400

400

662

578

Item: 722-1 Body, 3/4" 720 Finished, Lead Time = 0 months, Lot Size = 55800, SS=0
Level 1
Month 1
Month 2
Month 3
0
400
5000
Gross Requirements
Scheduled Receipts
16650
16650
16650
16250
Projected On-Hand
0
0
0
Net Requirements
0
0
0
Planned Order
Item: 721A-12 Plastic Washer, 1/2" Lead Time = 36/22 ~ 2 months, Lot Size = 55000, SS=9000
Level 1
Month 1
Month 2 Month 3
11564
11152
13798
Gross Requirements
55000
Scheduled Receipts
18533
73533
61969
50817
Projected On-Hand
0
0
0
Net Requirements
0
0
0
Planned Order
Item: 34-850 Ball Valve, 3/4", Lead Time = 54/22 ~ 2 months, Lot Size = 11444, SS=4898
Level 1
Month 1
Month 2
Month 3
50
850
10050
Gross Requirements
11444
Scheduled Receipts
10430
10430
10380
9530
Projected On-Hand
0
0
5418
Net Requirements
11444
11444
0
Planned Order
Item: IS720 Instruction Sheet 720, Lead Time = 9/22 ~ 0 months, Lot Size = 54000, SS=27
Level 1
Month 1
Month 2
Month 3
13235
13102
14078
Gross Requirements
49500
49500
54900
Scheduled Receipts

Projected On-Hand
Net Requirements
Planned Order

64372

113872
0
0

150137
0
0

191935
0
0

Item: 722-1-000 Body, 3/4" 720 Raw, Lead Time = 14/22 ~ 1 month, Lot Size = 56413, SS=0
Level 2
Month 1
Month 2
Month 3
0
0
4021
Gross Requirements
56413
Scheduled Receipts
612
612
612
612
Projected On-Hand
3409
Net Requirements
56413
0
Planned Order

Month 4 Month 5
4000
4000

4000

4000

Month 4 Month 5
650
858
400

400

650

858

55800, SS=0
Month 4 Month 5
4000
4000
11250
0
0

7250
0
0

= 55000, SS=9000
Month 4 Month 5
10788
10364
37019
0
0

26231
0
0

11444, SS=4898
Month 4 Month 5
8040
8040
11444
10924
14328
2014
0

= 54000, SS=27
Month 4 Month 5
11180
11358
9000
12600

No other Use except in PVB

Independent Use

PVB Use

186857
0
0

188277
0
0

Independent Use +PVB and Repair Kit

ze = 56413, SS=0
Month 4 Month 5
5409
4928
53004
0
0

47595
0

Independent Use + Use for Body Part level 1