Pt. Tata Prima Energi: Pit Nett Ob (BCM) SR Model Recovery (Mton) Model Recovery (BCM) (Mton) 85%

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

PT.

TATA PRIMA ENERGI


Jl. MT. Haryono Komp. Balikpapan Baru Block B3 No.01
Balikpapan - kalimantan Timur, Phone (0542) 875746, Fax (0542) 875745
Volume
Model
(Bcm)

(MTon)

Recovery (
MTon)
85%

139,212.500

180,976.250

153,829.813

1,781,255.700

9.842

117,942.530

153,325.289

130,326.496

1,857,885.070

12.117

100,209.200

142,792.650

121,373.753

1,793,775.300

12.562

68,768.400

89,398.920

75,989.082

1,325,904.600

14.831

256,101.500

332,931.950

282,992.158

4,257,217.930

12.787

163,995.376

213,193.989

181,214.891

3,245,877.844

15.225 17.912

945,726.191

14,261,916.444 12.818

Pit
Pit 90 / Pit A
(RL -40.0)
Pit 110 / Pit B
(RL - 40.0)
Pit 190 / Pit C
(RL -50.0)
Pit 200 / PIT
D (RL -25.0)
Pit 300 / Pit E
( RL - 50.0 )
PIT F
( RL - 30.0 )
TOTAL

SR

846,229.506 1,112,619.048

Nett OB (Bcm)

Model

Recovery
11.579

14.256
14.779
17.449
15.044

15.080

You might also like