This document provides a basic maintenance program for a cement mill fan including inspection and maintenance tasks to be performed on a daily, weekly, monthly, yearly, and other scheduled frequencies. The tasks include cleaning, checking for leaks, vibration levels, temperatures, lubrication levels, wear of parts, tightness of fasteners, and other routine inspections. Standards are provided for measurement checks such as bearing clearance where actual values are to be recorded.
This document provides a basic maintenance program for a cement mill fan including inspection and maintenance tasks to be performed on a daily, weekly, monthly, yearly, and other scheduled frequencies. The tasks include cleaning, checking for leaks, vibration levels, temperatures, lubrication levels, wear of parts, tightness of fasteners, and other routine inspections. Standards are provided for measurement checks such as bearing clearance where actual values are to be recorded.
This document provides a basic maintenance program for a cement mill fan including inspection and maintenance tasks to be performed on a daily, weekly, monthly, yearly, and other scheduled frequencies. The tasks include cleaning, checking for leaks, vibration levels, temperatures, lubrication levels, wear of parts, tightness of fasteners, and other routine inspections. Standards are provided for measurement checks such as bearing clearance where actual values are to be recorded.
Basic Maintenance programme Form No:Main /ML/4/000 Issue: 1 Page: 1of1 Cement Mill Mech Eqpt. No. & Name / Description of activities S t a t u s L u b . / m a i n Frequency O t h e r s Instruction Remark B F Fan,
R/S L/M D W F M 3M 6M Y O 1. Clean the machine & its surrounding S M O 2. Check the bearing housing for leaks R M O 3. Check the temp. of both bearings R M O ma!" 12# o c Dri$e side%%%%&on D.S%%%% '. Check the $ibration le$el is normal R M O (ma!" )mm*s Dri$e side%%%%&on D.S%%%% +. Check oil le$el R , O Oil t-pe. Mobil gear )2/ Dri$e side%%%%&on D.S%%%% ). 0rease the bearing seals R , O 0rease t-pe. 12324 till it protrudes from the shaft 5#2 pts on each side6 Dri$e side%%%%&on D.S%%%% /. 7nspect the casing of the fan R M O 8. 7nspect the blades for 9ear4 cracks and material caking S M O During o$erhaul period :. Check the condition of the shaft4 bolts & other mechanical parts S M O ,oose4 bend structure4 etc 5During o$erhaul period6 1#. Change lubrication oil S , O Oil t-pe. Mobil gear )2/4;t-. '2. 2, 11. 7nspect the suction & deli$er- e!pansion <oints R M O 12. Check cooling discs for loose bolts S M O 13.Check cooling disc guard for clogging* air flo9 R M O Clean if clogged 1'. Check manholes* bolts* leakages R M O 1+. Check condition of bearings S M O * Coupling (Type 1.Check the clearance*gap bet9een the coupling hal$es R M O Std " )=12mm >ctual"%%%%%%%%%%% 2.Check the plastic fle!ibles for 9ear 5Circumferential backlash6 S M O Std " 1/.+mm >ctual"%%%%%%%%%%% 3.Check all fasteners 5for tightness6 S M O Legend: R = Running S = Stop Planning cell Entered in Record Sign. D = Daily W = Weekly F = Fortnightly Sign. Name M = Monthly Y = Yearly Name Prepared by Checked by