PETROVIETNAM CONSTRUCTION JOINT STOCK CORPORATION

THAI BINH 2 THERMAL POWER PLANT PROJECT EXECUTION BOARD (PEB)


Add: My Loc Commune, Thai Thuy District, Thai Binh Province
Tel: (84) 036 3721 446 - Fax: (84) 036 3776 274 - Email:


TB2-PEB-00001-PM-G1-PRO-0004 COORDINATION PROCEDURE 1/1
Rev B (26-J une-2011)

8 copies
and 02
CDs

Document/Drawing Review and Approval Flow Chart in Seoul

SubContractors PEB Seoul TB2PP/PMC Seoul PEB Site TB2PP/PMC Si te



































































Note:
- The quantities of Copy above are for the case of FOR APPROVAL, FOR REFERENCE. In the case of FOR
CONSTRUCTION, the number shall be complied with the Coordination Procedure.
- Cut-off dated will be counted based on distance between point A and B
- The cut-off date shall be counted from the date of receiving the hardcopies in Seoul on the same day of issuing the soft
copies. Any document and comment sheets shall be submitted before 2PM.




INCOMMING
DOCS/DRAWINGS
Review and Comment,
Combine with Owners
comments
Review PEBs
Comments
7 Sets of hard
copies
Review and
Comment
Review and
Comment
Review and check
if approvable
Check and submit to
TB2PP/PMC Seoul
If No, Issue
comment sheet to
PEB Seoul
SDC will send to PVC the response on
PVN/PVC comment sheet if the design review
meeting is required
Incorporate
comment resolutions
into document
revision
Issue Next revision
Two (2) set of
hardcopies
Send trasnmittal
to PEB Seoul

If Yes
Check and submit
approved
document to SDC
One (1) set of
hardcopies
4 Sets of hard
copies
Document/Drawing review meeting to resolve
outstanding items or clarification (if necessary)
A
B
SDC to identify
if meeting is
needed
Yes
No
Approved