This document is an accident/incident report for the Trans Anatolian Natural Gas Pipeline Project. It collects information about an accident such as the date, location, type of incident, details of any injured individual, potential causes of the incident, a description of events, witness information, and a remedial action plan. The report is used to document work-related incidents for the natural gas pipeline project and investigate the cause to prevent future occurrences.
This document is an accident/incident report for the Trans Anatolian Natural Gas Pipeline Project. It collects information about an accident such as the date, location, type of incident, details of any injured individual, potential causes of the incident, a description of events, witness information, and a remedial action plan. The report is used to document work-related incidents for the natural gas pipeline project and investigate the cause to prevent future occurrences.
This document is an accident/incident report for the Trans Anatolian Natural Gas Pipeline Project. It collects information about an accident such as the date, location, type of incident, details of any injured individual, potential causes of the incident, a description of events, witness information, and a remedial action plan. The report is used to document work-related incidents for the natural gas pipeline project and investigate the cause to prevent future occurrences.
Report No: Company Involved: Date of Occurrence: Time of Occurrence: Location of Occurrence: Work Related Not Work Related Type of Accident/Injury Property Damage Injury Illness Environmental Security Fatal Injury Identifying Information Injured s Name: Nationality Marital Status: Nationality: Employers Company: Gender: Occupation: Age: Experience in Current Job: Object/Equip/Subst. Inflicting Harm: Cause Checklist Substandard Actions Substandard Conditions
Operating equipment without authority
Inadequate PPE
Failure to warn
Inadequate guards or barriers Failure to secure Defective material, tool, equipment
Operating at improper speed
Restricted action Removing safety devices Fire and explosive hazards
Using defective equipment/tool
Poor housekeeping
Failure to use equipment/tool properly
Noise exposure Failure to use PPE properly Hazardous environment conditions e.g. gases, dusts, fumes etc.
Improper loading
Inadequate ventilation Improper lifting Inadequate or excess illumination
Horseplay
High temperature exposure
Stress
Inadequate work area standards
Lack of capability, knowledge, skill, motivation
Mis-positioned scaffolding
Abuse or misuse
Inadequate supervision Violation of rules, procedures Others
Others
Investigation Describe the operation in progress at the time the incident occurred (use separate sheet if necessary)
Describe how the incident occurred (use separate sheet if necessary and attach photos & sketch)
TRANS ANATOLIAN NATURAL GAS PIPELINE PROJECT ACCIDENT/INCIDENT REPORT
Record No: - Page 2 of 2
Witnesses: YES NO 1. 3. 2. 4. Approved by Safety Engineer, SE/Name: Date/Time: Signature: Signatur Prepared by Supervisor/Name: Date/Time: Signature: Signatur Remedial Action Plan Immediate actions to prevent reoccurrence or escalation Responsibility Deadline Closure Date
Report closure Closed by Supervisor/Name: Date/Time closed: Signature: Signatur