The document outlines a 20 day pilot project schedule that includes installing an automation system, connecting junction boxes and cables, setting bulb on/off times, monitoring available chokes and replacing them with ballasts, monitoring ballast readings, addressing any post-installation technical issues, and removing cables and handing over chokes upon completion.
The document outlines a 20 day pilot project schedule that includes installing an automation system, connecting junction boxes and cables, setting bulb on/off times, monitoring available chokes and replacing them with ballasts, monitoring ballast readings, addressing any post-installation technical issues, and removing cables and handing over chokes upon completion.
The document outlines a 20 day pilot project schedule that includes installing an automation system, connecting junction boxes and cables, setting bulb on/off times, monitoring available chokes and replacing them with ballasts, monitoring ballast readings, addressing any post-installation technical issues, and removing cables and handing over chokes upon completion.
Duration (days) Number of lamps connected Wattage of lamps Type of Lamps(MH/HPSV) Load Cpacity & Phase(1-Ph,3-Ph) To Fix Junction Box To give Incoming and Outgoing cable connections To Set bulbs ON & OFF time Observation To Monitor readings of available chokes 5 To Replace available choke with Ballast To give cable connections Observation To Monitor readings of ballasts 5 4 If any Technical problems occure after installation Like cable burn & any Leakages 3 5 To recollect chokes with Department approval To remove all the cable connections & handovering chokes with approval 3 20 Total Days required to complete pilot project 1 2 3 Pilot Project Completion Schedule Installation of Automation System 1 2 Installation of Ballast 1 Site inspection