Saudi Kayan Petrochemical Company intends to install an additional air compressor and air dryer package to meet increased instrument air and plant air demands. Citec will provide detailed engineering and design work for the instrumentation and control system, including preparing wiring diagrams, loop diagrams, and participating in hazard and operability reviews. The project scope is for an additional air compressor and air dryer package for Saudi Kayan Petrochemical Company, with Citec's customer being KENTZ Engineering International Co. Ltd.
Original Description:
abc
Original Title
REFCard_Additional Air Compressor and Air Dryer Package_EN-2012 (4) (1)
Saudi Kayan Petrochemical Company intends to install an additional air compressor and air dryer package to meet increased instrument air and plant air demands. Citec will provide detailed engineering and design work for the instrumentation and control system, including preparing wiring diagrams, loop diagrams, and participating in hazard and operability reviews. The project scope is for an additional air compressor and air dryer package for Saudi Kayan Petrochemical Company, with Citec's customer being KENTZ Engineering International Co. Ltd.
Saudi Kayan Petrochemical Company intends to install an additional air compressor and air dryer package to meet increased instrument air and plant air demands. Citec will provide detailed engineering and design work for the instrumentation and control system, including preparing wiring diagrams, loop diagrams, and participating in hazard and operability reviews. The project scope is for an additional air compressor and air dryer package for Saudi Kayan Petrochemical Company, with Citec's customer being KENTZ Engineering International Co. Ltd.
Head office: P.O. Box 109, FI-65101 Vaasa, Finland
Tel. +358 6 3240 700 www.citec.com Project description n Saudi Kayan Petrochemical Company intends to install an additional motor driven air compressor and air dryer package to meet increased instrument air and plant air demands. Citec scope of work Review and mark-up of P&ID for I&C Preparation of instrument index Site survey, doc./dwg. retrieval Study of existing control system (DCS, PESS, MMS, antisurge controller, analysers) Preparation of control system architecture incorporating modification required for the project Preparation of I/O list for respective control system Finalising spare in respective control system to accommodate additional I/Os required for the project Preparation of cable routing layout between package vendor skid and control room Preparation of cable routing layout between electrical substation and control room Preparation of signal termination database of respective cabinets as per spare available Preparation of UPS load schedule Review and approval of air compressor vendors dwgs. & docs Review and approval of air dryer vendors dwgs. & docs Review and approval of MMS vendors dwgs. & docs Preparation of interfacing wiring diagrams between marshalling cabinet and respective vendors skid mounted junction boxes/local panels Preparation of interfacing wiring diagrams between marshalling cabinet and interposing relay cabinet for MCC in electrical substation Preparation of instrument data sheets HART compatible for OSBL instruments Preparation of JB wiring diagrams for OSBL instruments Preparation of instrument loop diagrams for OSBL instruments Preparation of cable block diagram for complete project Preparation of MTO for bulk items Participation in HAZOP and incorporating of HAZOP recommendations Preparation of RFQ for DCS, PESS and MMS modification scope of work and supply CASE IN BRIEF PROJECT SCOPE Case Additional Air Compressor and Air Dryer Package Citec Customer KENTZ Engineering International Co. Ltd. (KEIL) End Customer Saudi Kayan Petrochemical Company Detailed engineering and design of instrumentation & control system (I&C) work for additional air compressor and air dryer package. 0 6 / 2 0 1 2
PROCESS INDUSTRY / Citec - Additional Air Compressor and Air Dryer Package R E F C a r d CITEC CUSTOMER REFERENCE