01) Scope of Work Description: Contractore Name: Site Id

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Kingdom of Saudi Arabia

Ministry of Interior

Security planning and development Agency
KAP4 Project



CONTRACTORE NAME: SITE ID:
SUBJ ECT: Geotechnical/soil investigation report Rev.


DOC TITLE: MINIMUM GEOTECHNICAL CHECKLIST ROCEDURE
REQUIREMENT
Date:
ITEM Chk Note

Legend: A (approved) AR (approved with remarks) - NA (not approved)


01) Scope of work description


Description of scope of work: client name,
main job, site location, morphology
description of the site, environmental
condition, boundaries, site coordinates,
and dimension, etc


02) ) List of the applicable Saudi
Building code 2007 (SBC2007) and
referenced links, where required.

It is mandatory to apply SBC 303 code 2007, whereby is
not sufficient other references code can be applied,
quoting it in the report.
03) List of personnel


Their names, curriculum, qualification and
duty


04) List of equipment.


Machineries/vehicles , tag no, revision
certificate from authorized company,
software applied

05) Types/method of investigations
applied:


06) Final report:

The report shall be accompanied with detailed map and
Google earth, coloured photographs,
Input and output results
















Kingdom of Saudi Arabia
Ministry of Interior

Security planning and development Agency
KAP4 Project



CONTRACTORE NAME: SITE ID:
SUBJ ECT: Geotechnical/soil investigation report Rev.


DOC TITLE: MINIMUM GEOTECHNICAL CHECKLIST ROCEDURE
REQUIREMENT
Date:
ITEM Chk Note

Legend: A (approved) AR (approved with remarks) - NA (not approved)


General note:
Analyze any other information, necessary for engineering standard and designing.
It is mandatory that the Contractor should submit the report in hardcopy and soft copies, including all the
daily field work reports.


Date Review Prepared by Checked by Approved by

You might also like