The document discusses coal pipe leaks at the Jeffrey Energy Center power plant and the plant's response. The plant has three 800MW coal units that use PRB coal. Coal pipes running from the coal mills to burners are over 2,500 feet long and have started leaking, causing dust, fires and maintenance issues. To address this, the plant developed a leak response plan that includes inspections, temporary repairs, wash downs and a 5-year capital plan to replace sections of aging coal pipe on each unit to prevent future leaks.
The document discusses coal pipe leaks at the Jeffrey Energy Center power plant and the plant's response. The plant has three 800MW coal units that use PRB coal. Coal pipes running from the coal mills to burners are over 2,500 feet long and have started leaking, causing dust, fires and maintenance issues. To address this, the plant developed a leak response plan that includes inspections, temporary repairs, wash downs and a 5-year capital plan to replace sections of aging coal pipe on each unit to prevent future leaks.
The document discusses coal pipe leaks at the Jeffrey Energy Center power plant and the plant's response. The plant has three 800MW coal units that use PRB coal. Coal pipes running from the coal mills to burners are over 2,500 feet long and have started leaking, causing dust, fires and maintenance issues. To address this, the plant developed a leak response plan that includes inspections, temporary repairs, wash downs and a 5-year capital plan to replace sections of aging coal pipe on each unit to prevent future leaks.
Coal Pipe Leak Repairs Presented By: Dave Stubby www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center (3) 800MW Units 8 Corner T-Fired CE Boilers Siemens Turbine- Generators (7) CE RP1003 Bowl Mills 100% PRB Coal www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center Coal Pipe (riffle to burners) 18 diameter thick 2,577 feet per unit 250,000,000 tons of PRB coal burned to- date. Original Installation 1978-Unit 1 1980-Unit 2 1983-Unit 3 www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center Coal Pipe Leaks Created: Unacceptable Housekeeping Combustible Dust Compliance Issues Root Cause of Cable Tray Fires $50k/year in emergent parts & labor www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center Response Plan Quickly remove coal mills from service when leaks are identified. Develop a leak repair procedure. Develop a wash down / cleaning response. Develop a 5-year Capital plan to replace coal pipe www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center Inspectforleaksevery8hours Continueoperatorinspections No Istherealeak? Yes Isablastpaneldirectedinthe areaoftheleak Yes No Makeatemporaryrepair. WriteaP4WOforpermanent Repair Cantheleakbestoppedbythe operatorwithin30minutes? Yes No Washdowntheareawithin1 day CROremovesmillfromservice Makeweldrepair Returnmilltoservice Maintenanceaccessestherepair CROwritesaP5WO Washdownthearea(HotWork) Washdowntheareawithin1 day Orderscaffold Yes Isscaffoldneeded? OperationsSupervisorverbally notifiesMaintenance Weld Whattypeofrepairisneeded? Wrap Wrapcoalpipe Scheduleddispatcherderate Yes Canatemporarypatchbe applied? No Isscaffoldneeded? Yes Orderscaffold Makeweldrepair Weld Whattypeofrepairisneeded? Wrap Wrapcoalpipe Returnmilltoservice www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center 106 coal mill coal pipe leak Temporary patch of welding blanket and RTV. Permanent patch of fiberglass wrap. Labor costs for 10-hours = $526.58. Parts & materials cost = $444.88. www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center Response Plan Develop a 5-year Capital plan to replace coal pipe CoalPipingMultiYearReplacementPlan 2010 2011 2012 2013 2014 PerUnitCost Unit1 AboveRiffles $1,481,276.00 $3,822,856.00 $5,304,132.00 Unit2 AboveRiffles $2,414,925.00 $800,000.00 $1,800,000.00 $5,014,925.00 Unit3 AboveRiffles $2,212,627.00 $2,500,000.00 $4,712,627.00 $2,212,627.00 $3,896,201.00 $3,822,856.00 $3,300,000.00 $1,800,000.00 $15,031,684.00 www.PRBCoals.com I www.PRBCoalsForum.com I 2011 Conference J effrey Energy Center Questions Unit 2 & 3 Coal Pipe Replacements
Ceramic Materials for Energy Applications IV: A Collection of Papers Presented at the 38th International Conference on Advanced Ceramics and Composites, January 27-31, 2014, Daytona Beach, FL