This document contains an animation that summarizes the planning of installing a central heating system. It includes an activity table that lists the tasks needed to complete the project with their durations and dependencies. A network diagram, critical chain, and Gantt chart are drawn to analyze the schedule and critical path. The total estimated duration to complete the project is 14 days.
This document contains an animation that summarizes the planning of installing a central heating system. It includes an activity table that lists the tasks needed to complete the project with their durations and dependencies. A network diagram, critical chain, and Gantt chart are drawn to analyze the schedule and critical path. The total estimated duration to complete the project is 14 days.
This document contains an animation that summarizes the planning of installing a central heating system. It includes an activity table that lists the tasks needed to complete the project with their durations and dependencies. A network diagram, critical chain, and Gantt chart are drawn to analyze the schedule and critical path. The total estimated duration to complete the project is 14 days.
The following slides contain an animation of the planning of a
list of activities.
Click to go to the next step of the schedule.
This example is about the installation of a central heating system that uses a boiler and hot water to distribute the heat. Durations are in days. Activities provided str beyond discussion. Estimate the total duration first.
This animation is part of the book Project Management written by Roel Grit. 2 Schedule Example Installation of heating system Assignment: Estimate the total duration before analyzing! Activity Predecesso rs Duratio n A Order and deliver pipes - 2 days B Install pipes A 6 days C Order and deliver boiler - 5 days D Order and deliver radiators - 2 days E Install radiators D 2 days F Install boiler C, B 2 days G Connect pipes to radiators B, E 4 days H Fine-tune system F, G 2 days Draw: First network diagram, then critical chain, then Gantt chart Schedule - Solution Activity table After Days A Deliver pipes - 2 B Install pipes A 6 C Deliver boiler - 5 D Deliver radiators - 2 E Install radiators D 2 F Install boiler C, B 2 G Connect pipes to radiators B, E 4 H Fine-tune system F, G 2 A=2 B=6 C=5 D=2 E=2 F*=2 F*=2 G*=4 G*=4 H*=2 H*=2 Network diagram = Pert chart Critical path = 14 Bar chart B=6 G*=4 H*=2 A=2 C=5 D=2 E=2 F*=2 5 10 8 14 2 12 slack slack slack D, E = Gantt chart Important terms Critical path Slack time ASAP (activity C) ALAP (activity C, critical) Must start on Milestones Resources