PERHITUNGAN QUANTITY

PEKERJAAN
LOKASI

No.

:
:

PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

Uraian Pekerjaan

BANGUNAN MESJID

PEKERJAAN PERSIAPAN

Stn

Volume

Mobilisasi dan Demobilisasi

ls

1.00

Papan Nama Proyek

bh

1.00

Direksi Keet

ls

1.00

Pembersihan
UKURAN BANGUNAN : P1
P1
P1

=
=
=

18
2.5
2

m
m
m

L1 =
L1 =
L1 =

15.000 m
2.625 m
2.750 m

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

=
=
=

Pengukuran Lapangan
UKURAN BANGUNAN : P1
P1
P1

=
=
=

18
2.5
2

m
m
m

L1 =
L1 =
L1 =

15.000 m
2.625 m
2.750 m

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

=
=
=

6
II

HASIL
270
13.125
5.5
288.625
HASIL
270
13.125
5.5
288.625

m2

288.63

m2

288.63

m2
m2
m2
m2
m2
m2
m2
m2

Foto Dokumentasi

ls

1.00

PEKERJAAN TANAH
1

Pembersihan Site
UKURAN BANGUNAN : P1
P2
P3

=
=
=

18
2.5
2

m
m
m

L1 =
L2 =
L3 =

15.000 m
2.625 m
2.750 m

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

=
=
=

Pembuatan Bouplank
UKURAN BANGUNAN : P1
P2
P3

=
=
=

18
2.5
2

m
m
m

L1 =
L2 =
L3 =

15.000 m
2.625 m
2.750 m

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

=
=
=

Galian Tanah Pondasi dan Selasar/Teras


a Pondasi Menerus
P1 =
Uk. Pondasi
lebar =
P2
P3

=
=

HASIL
270
13.125
5.5
288.625
HASIL
66
6
0.000
72

m
m

L1 =
H=

13.000 m
1.050 m

2.5
2

m
m

L2 =
L3 =

2.625 m
2.750 m

JLH
+lebar

=
=

1 Unit
0.8 m

JLH
JLH

=
=

2 Unit
1 Unit

=
=

60

15.25
2.750
18

288.63

m'

72.00

m3

192.52

m'
m'
m'
m'
HASIL

17
1

m2
m2
m2
m2
m2

m'
=
m'
m'
m'

113.4

m3

Uk. Pondasi
a Pondasi Pas.Batu kali

d Pas. Batu Bata Teras

lebar =
La

L1

L1

L1

0.8

H=

1.050 m

+lebar

0.8 m

30.24

m3

0.25

Lb =
H=

0.700 m
0.750

Ltot
+lebar

=
=

52.00 M
0.4 m

42.9

m3

L2 =
H=

2.480 m
0.400

jlh
+lebar

=
=

2.00 unit
0.2 m

2.412

m3

L2 =
H=

5.800 m
0.400

jlh
+lebar

=
=

1.00 unit
0.2 m

2.64

m3

L2 =
H=

0.850 m
0.400

jlh
+lebar

=
=

2.00 unit
0.2 m

0.925

0.900

0.900

TOTAL
4

Timbunan Kembali Tanah Pondasi

Timbunan Tanah dalam Bangunan

=
P1
P1
P1

=
=
=

0.25x

7
8
9

III

Timbunan Tanah Teras

P1
P1
P1

=
=
=

L1
L1
L1

=
=
=

Timbunan Pasir Urug dalam BangunanT


=
Timbunan Pasir Urug Teras
T
=
Timbunan Pasir Urug Pondasi Pas.batuTkali =

0.924

m3

192.516

m3

Vol.galian

17
2.5
2

m
m
m

L1 =
L1 =
L1 =

13.000 m
2.625 m
2.750 m

0.600 m

L1 =
L1 =
L1 =

1.000 m
1.000 m
2.750 m

JLH
JLH
JLH

=
=
=

2 Unit
2 Unit
1 Unit

=
=
=

Tinggi Timbunan
0.925
m
0.900
m
0.900
m

=
L2 =
L2 =
L2 =

0.600
2.480
5.800
0.850

m
m
m
m

jlh
jlh
jlh

=
=
=

2 unit
1 unit
2 unit

=
=
=

Tinggi Timbunan

0.200 m

s/d

Tinggi Timbunan

=
=

19
13
2

m
m
m

0.07 m
0.07 m
0.05 m

hasil =
hasil =
hasil =

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

0.6 m

=
=
=

221
13.125
5.5
239.625
HASIL

m2
m2
m2
m2
=

38
26
5.5
69.5
HASIL
4.588
5.22
1.53
11.338
HASIL
TOTAL

m2
m2
m2
m2
=
m2
m2
m2
m2
=
=

143.78

m3

48.13

m3

143.78

m3

46.24

m3
m3
m3

16.77
5.66
2.08

m3

4.14

m3

41.70

m3

4.54
46.24

m3
m3

16.774 m3
5.659 m3
2.080 m3
Sub Total II

PEKERJAAN PONDASI
1

Lantai Kerja Pondasi Menerus Beton Cor 1 : 3 : 5


a Pondasi Menerus
P1 =
Ukuran Pondasi
p
=
b Pondasi Menerus
P1 =

17
1
17

m
m
m

L1 =
t=
L1 =

13.000 m
0.050 m
13.000 m

Ltot
+p
Ltot

=
=
=

60
0.1
60

m'
m'
m'

HASIL

3.30

m3

Ukuran Pondasi

P1
P1

=
=

2.5
2

m
m

L1 =
L1 =

2.625 m
2.750 m

JLH
JLH

=
=

0.8

t=

0.050 m

+p

Pondasi Menerus Beton Bertulang 1 : 2 : 3


a Pondasi Menerus P1
P1
Ukuran Pondasi
p
b Pondasi Menerus P2
P1
P1
Ukuran Pondasi

c Pembesian

2 Unit
1 Unit
tot
0.1
m'

=
=

17
1

m
m

L1 =
t=

13.000 m
0.250 m

Ltot
+p

=
=

=
=

2.5
2

m
m

L1 =
L1 =

2.625 m
2.750 m

JLH
JLH

=
=

t=

0.200 m

+p

Lbesi =
Lbesi =

1.2
60

m
m

jarak =
jarak =

0.150 m
0.150 m

Jlh
Jlh

=
=

9 bh
401 bh

Lbesi =
Lbesi =

1
18.625

m
m

jarak =
jarak =

0.150 m
0.150 m

Jlh
Jlh

=
=

7 bh
125 bh

60
0

m'
m'

2 Unit
1 Unit
tot
m'

Tot. Berat
3

Pondasi Pasangan Batu kali 1 : 4


a Pondasi Batu Kali

Cerucuk Kayu Laut dia 4"


a Pondasi Menerus

a Pondasi Pas.batu kali

Sloof Beton Bertulang 1 : 2 : 3


a Sloof
b Pembesian

IV.

La

0.25

Lb =

0.700 m
Panjang Total

Ltot =
Baris =

78.625 m
2 bh

Jarak =
0.600 m
Panjang Kayu Cerocok

JLH

Ltot =
Baris =

52.00 m
2 bh

Jarak =
0.600 m
Panjang Kayu Cerocok

JLH

4
Beugel=

0.2 M
12

l=

0.300 M

0.15

Ls =
Jumlah sengkang

Ltot

=
=

0.7
52.00

m'
m'

133 bh
4M

=
=

88 bh
4M

0.9 m
=

13.125
5.5
18.625
HASIL
TOTAL

m2
m2
m2
=
=

0.84
4.14

m3
m3

HASIL

15.00

m3

13.125
5.5
18.625
HASIL
TOTAL

m2
m2
m2
=
=

3.73
18.73

m3
m3

=
=

540
481.2

M'
M'

=
=

130.375
125
1276.575
1133.2922
HASIL

M'
M'
M'
Kg
=

70.00

Kg

=
=

=
=

=
=

HASIL

17.29

HASIL

1,064.00

m'

HASIL
TOTAL

=
=

704.00
1,768.00

m'
m'

HASIL

7.84

m3

522.5 M

Berat

463.8546

Kg

Berat
Tot. Berat
HASIL

=
=
=

18.73

m3

17.29

m'

1,768.00

m3

7.84

m3

22.43

m3

130.63 M

871 Bh

m3

173.978766 Kg
637.83
Kg
97.00
Kg

PEKERJAAN LANTAI KERAMIK


1

Lantai Kerja Beton Cor 1 : 3 : 5

UKURAN BANGUNAN : P1
P1
P1

=
=
=

17
2.5
2

m
m
m

Tebal lt.kerja

0.070 m

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

=
=
=

=
=
=

19
13
2

m
m
m

L1 =
L1 =
L1 =

1.000 m
1.000 m
2.750 m

JLH
JLH
JLH

=
=
=

2 Unit
2 Unit
1 Unit

=
=
=

L1
L1
L1

=
=
=

Tebal lt.kerja
0.925
m
0.900
m
0.900
m

=
L2 =
L2 =
L2 =

0.070
2.480
5.800
0.850

jlh
jlh
jlh

=
=
=

2 unit
1 unit
2 unit

=
=
=

Keramik Lantai Dalam Bangunan 30 x 30 cm


UKURAN BANGUNAN : P1 =
P1 =
P1 =

Keramik Lantai Teras 30 x 30 cm


UKURAN TERAS

13.000 m
2.625 m
2.750 m

P1
P1
P1

Tebal lt.kerja

L1 =
L1 =
L1 =

m
m
m
m

0.070 m

221
13.125
5.5
239.625
HASIL

m2
m2
m2
m2
=

38
26
5.5
69.5
HASIL
4.588
5.22
1.53
11.338
HASIL
TOTAL

m2
m2
m2
m2
=
m2
m2
m2
m2
=
=

16.77

m3

4.87

m3

0.79
22.43

m3
m3

m2
17
2.5
2

m
m
m

L1 =
L1 =
L1 =

13.000 m
2.625 m
2.750 m

JLH
JLH
JLH

=
=
=

1 Unit
2 Unit
1 Unit

=
=
=

221
13.125
5.5
239.625

m
P1
P1
P1

UKURAN LT. TANGGA L1


L1
L1

UKURAN KAKI TANGGAL1


L1
L1

=
=
=

=
=
=

=
=
=

19
13
2

0.925
0.900
0.900

0.925
0.900
0.900

m
m
m

m
m
m

m
m
m

Tebal Kaki tangga


L1
L1
L1

=
=
=

0.625
0.600
0.600

m
m
m

Tebal Kaki tangga


L1
L1

=
=

0.325
0.300

m
m

L1 =
L1 =
L1 =

L2 =
L2 =
L2 =

1.000 m
1.000 m
2.750 m

2.480 m
5.800 m
0.850 m

L2 =
L2 =
L2 =

2.480 m
5.800 m
0.850 m

0.150 m

L2 =
L2 =
L2 =

2.480 m
5.200 m
0.850 m

0.200 m

L2 =
L2 =

2.480 m
4.600 m

JLH
JLH
JLH

jlh
jlh
jlh

jlh
jlh
jlh

jlh
jlh
jlh

jlh
jlh

=
=
=

=
=
=

=
=
=

=
=
=

=
=

2 Unit
2 Unit
1 Unit

2 unit
1 unit
2 unit

2 unit
1 unit
2 unit

2 unit
1 unit
2 unit

2 unit
1 unit

=
=
=

=
=
=

=
=
=

=
=
=

=
=

239.63

m2
m2
m2
m2

38
26
5.5
69.5

m2
m2
m2
m2

69.50

m2

4.588
5.22
1.53
11.338

m2
m2
m2
m2

11.34

m2

4.33
7.6
2.65
14.58
HASIL

M'
M'
M'
M'
=

2.19

m2

3.73
6.4
2.05
12.18
HASIL

M'
M'
M'
M'
=

2.44

m2

3.13
5.2

M'
M'

88.34

L1
L1

=
=

0.300

m
m

L2 =
L2 =

0.850 m
4.600 m

0.200 m

Tebal Kaki tangga

Plin dinding keramik10 x 30 cm

Dinding dalam
Dinding luar
Pengurangan
hasil

=
=
=
=

63.7
49.1
-4.4
108.4

jlh
jlh

=
=

m'
m'
m'
m'

2 unit
2 unit

=
=

1.45
4.6
14.38
HASIL
TOTAL

M'
M'
M'
=
=

2.88
88.34

m2
m2

m'

108.40

m3

26.97

m3

62.89

Sub Total IV
V.

PEKERJAAN PASANGAN DAN PLESTERAN


1

Pasangan Bata 1: 2
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang
Panjang

####
####
7.6
6.4
5.2
####
7.46
6.26
5.3
4.1
2.9
####

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

Pasangan Bata 1: 4
Panjang
#### m'
Panjang
7.9 m'
Panjang
8.1 m'
Pengurangan Pintu
2.83 m'
Pengurangan Pintu
0.9 m'
Pengurangan Jendela 2.08 m'
Pengurangan Jendela 2.08 m'
Pengurangan Jendela
0.3 m'
Pengurangan Jendela 1.38 m'
Pengurangan Jendela
0.3 m'
Pengurangan Jendela
1.6 m'
Pengurangan Jendela 0.22 m'

H=
H=
H=
H=
H=
H=
H=
H=
H=
H=
H=

H=
H=
H=
H=
H=
H=
H=
H=
H=
H=
H=
H=

1.37
0.65
0.25
0.45
0.65
0.25
0.2
0.2
0.25
0.2
0.2
Hasil

4.25
2.58
3.082
2
2.1
1.9
0.7
0.3
0.6
0.15
0.15
0.22
Hasil

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas

1
1
1
-3
-2
-4
-12
-40
-2
-15
-20
-96

=
=
=
=
=
=
=
=
=
=
=
=

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

175.189
33.800
1.900
2.880
3.380
2.165
1.492
1.252
1.325
0.820
0.580
224.783

Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas
Luas

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

=
=
=
=
=
=
=
=
=
=
=
=
=

Plesteran Trasram 1 : 2

=2 x Luasan Pasangan Batu Bata

Luas =

449.566 M2

Plesteran 1 : 4

=2 x Luasan Pasangan Batu Bata

Luas =

1,082.123 M2

Pasangan Ventilasi block 1: 4

543.469
20.382
24.964
-16.980
-3.780
-15.770
-17.430
-3.600
-1.656
-0.675
-4.800
-4.646
524.124

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
m2
2

m2

449.57
1,082.12
0.68

Sponengan/tali air lebar = 10 cm,tebal 1.5 cm

Plesteran/Acian Kolom 1 : 4

Panjang =

123.360 M2

m2

Luas =

61.700 M2

2
2

12.34
61.70

Plesteran/Acian Balok

Luas =

76.050 M2

76.05

Plesteran/Acian Dak 1 : 4

Luas =

27.450 M2
Sub Total V

m2

27.45

m3

9.04

m3

2.16

m3

1.47

m3

4.56

m3

6.40

VI.

PEKERJAAN KOLOM, BALOK, PELAT DAN LEUVEL


1

Kolom 20 x 40 cm Beton Bertulang 1 : 2 : 3 l


Tinggi
H=

0.2 m'
5.65 m'

b=
20 ttk

0.400 m
Vol
=

Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3 l


Tinggi
H=

0.2 m'
3.6 m'

b=
20 ttk

0.150 m
Vol
=

Kolom Praktis 15 x 15 cm Beton Bertulang 1l: 2 : 3


Dinding
H=
Pintu
H=
Pintu
H=

0.15
3.97
3.8
5.62

Balok 15 x 60 cm Beton Bertulang 1 : 2 : 3 l


Panjang
L=

0.15 m'
50.7 m'

b=

Balok Praktis 15 x 20 cm Beton Bertulang 1 l: 2 : 3 0.15 m'


Panjang
L=
213.24 m'

b=

Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3 l


Panjang
L=

b=

Pelat Dak Lantai Beton Bertulang 1 : 2 : 3


Luasan

T
L=

m'
m'
m'
m'

0.15 m'
18 m'
=

0.12
27.45 m2

b
6
8
2

=
ttk
ttk
ttk

9.04

2.16

0.150 m
Vol
=
Vol
=
Vol
=
TOTAL
=

0.53595
0.684
0.2529
1.47285

0.600 m
Vol
=

4.563

0.200 m
Vol
=

6.3972

m3

m3

m3
m3
m3
m3

m3

m3
3

0.300 m
Vol
=

0.54

3.294

0.54

m3

3.29

m3

7.91

m2

420.90

m3

m
Vol

m3

Sub Total VI
VII.

PEKERJAAN KUDA - KUDA DAN ATAP


1

Kuda-kuda

Kuda-kuda
0.08
Kuda-kuda
0.05
Gapit 0.2
Gapit 0.15
Gapit 0.1
sekur 0.08
Gording0.08

x
x
x
x
x
x
x

0.1
0.075
0.0375
0.0375
0.05
0.125
0.05

L=
L=
L=
L=
L=
L=
L=

122.6
38.7
245.88
186
69
152.4
580.875

Rangka Atap Genteng Metal

0.87 A
0.91 A
total

=
=
=

350.26 m2
70.64 m2
420.9 m2

323

Vol
Vol
Vol
Vol
Vol
Vol
Vol
total

=
=
=
=
=
=
=

6.483

0.9195
0.145125
1.8441
1.04625
0.345
1.42875
2.17828125
7.90700625

1.1033
0.90637179

3
4
5

Atap Genteng Metal


Rabung Genteng
Lisplank Kayu Dowble

420.9
63.271
159.47

m2
m'
m'

420.90
63.27
159.47

m3

0.08

unit
m2
Unit
Unit
Unit
Unit
Unit

3.00

Sub Total VII


VIII.
1

PEKERJAAN PINTU DAN JENDELA


Kusen Pintu Uk. 215 x 80 cm
Dimensi Kayu
Panjang Kayu

Uk
2.15 x
0.05 m
x
5.3 m

0.8
0.15 m
2 unit

Vol =

0.080

Pintu Sliding Bingkai kaca rangka Aluminium uk.200 x 260 cm Komplit Kunci dan alat penggantung ( 2 daun Ventilasi lengkung )

3
4
5
6
7
8

Pintu Panel P1 Uk. 210 x 80 cm (1 daun)


Jendela Kaca Rangka Aluminium uk.196 x 2230 cm Komplit Kunci dan alat penggantung ( 3 daun dengan Ventilasi lengkung )
Jendela Kaca Rangka Aluminium uk.70 x 2230 cm Komplit Kunci dan alat penggantung ( 1 daun dengan Ventilasi lengkung )
Jendela Kaca Rangka Aluminium uk.60 x 138 cm Komplit Kunci dan alat penggantung ( 1 Daun )
Ventilasi Kaca mati Rangka Aluminium uk 30 x 30 cm
Ventilasi V2 Kayu Uk. 22 x 22 cm (1 daun)
Sub Total VIII
PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

1
2
3
4
5
6

Kunci & Hendel Pintu


Engsel Pintu 4"
Engsel Jendela & Ventilasi 3"
Hak Angin Lipat Besar
Grendel Pintu 10 "
Grendel Kodok Jendela

IX

3.44
6.00
12.00
2.00
40.00
96.00

bh
bh
bh
bh
bh
bh

2.00
6.00

m2

416.64

Ttk
Bh
Bh
Bh
Set

36.00
30.00
15.00
6.00
1.00

4.00
-

Sub Total IX
IX

PEKERJAAN PLAFOND
1

Plafond Gypsum 9 mm + rangka


Sub Total IX

PEKERJAAN LISTRIK
1
2
3
4
5

Instalasi Listrik
Lampu Down Light
Saklar Ganda Tanam
Stop Kontak Tanam
Sekering Box Dua Group
Sub Total XII

XIII

PEKERJAAN CAT
1

Cat Tembok

m2

1,082.12

Cat Plafond

m2

416.64

Cat Ventilasi Block

m2

3.38

Cat Dak Lantai

m2

27.45

Cat Lisplank

m2

71.76

Pengecatan Kolom

m2

137.75

Pengecatan Ventilasi Kayu

m2

Pengecatan Pintu Kayu

Sub Total XIII


TOTAL

DEPARTEMEN KELAUTAN DAN PERIKANAN

181.63
6.88

REKAPITULASI RENCANA ANGGARAN BIAYA


SATUAN KERJA
KEGIATAN
PEKERJAAN
LOKASI

:
:
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
:

Uraian Pekerjaan

No.

Jumlah
Harga
(Rp.)

BANGUNAN MESJID
I PEKERJAAN PERSIAPAN

6,264,346.88

II PEKERJAAN TANAH

29,944,508.26

III PEKERJAAN PONDASI


IV PEKERJAAN LANTAI KERAMIK

151,105,676.39
61,055,974.68

V PEKERJAAN PASANGAN DAN PLESTERAN

137,551,899.08

VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

124,464,836.63

VII PEKERJAAN KUDA - KUDA DAN ATAP

152,949,009.46

VIII PEKERJAAN PINTU DAN JENDELA

70,633,775.20

IX PEKERJAAN KUNCI DAN ALAT PENGGANTUNG

358,100.00

X PEKERJAAN PLAFOND
XI PEKERJAAN LISTRIK

30,944,287.74
5,840,950.00

XII PEKERJAAN CAT

46,031,267.52
TOTAL - A

BANGUNAN TEMPAT WUDHU PRIA


I PEKERJAAN PERSIAPAN

18,562.50

II PEKERJAAN TANAH

576,253.38

III PEKERJAAN PONDASI


IV PEKERJAAN LANTAI KERAMIK

7,044,190.47
4,899,844.89

V PEKERJAAN PASANGAN DAN PLESTERAN

8,899,907.12

VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI


VII PEKERJAAN VENTILASI

312,150.00

IX PEKERJAAN INSTALASI AIR

1,574,850.00

X PEKERJAAN CAT

2,420,397.90
TOTAL - B

36,124,294.47

BANGUNAN TEMPAT WUDHU WANITA


I PEKERJAAN PERSIAPAN

18,562.50

II PEKERJAAN TANAH

576,253.38

III PEKERJAAN PONDASI


IV PEKERJAAN LANTAI KERAMIK

7,044,190.47
4,899,844.89

V PEKERJAAN PASANGAN DAN PLESTERAN

8,899,907.12

VI PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI

10,078,138.21

VII PEKERJAAN VENTILASI

300,000.00

VIII PEKERJAAN LISTRIK

312,150.00

IX PEKERJAAN INSTALASI AIR

1,574,850.00

X PEKERJAAN CAT

2,420,397.90
TOTAL - C

10,078,138.21
300,000.00

VIII PEKERJAAN LISTRIK

817,144,631.84

BANGUNAN PAGAR DEPAN

36,124,294.47

I PEKERJAAN PERSIAPAN

142,500.00

II PEKERJAAN TANAH

741,712.50

III PEKERJAAN PONDASI


IV PEKERJAAN PASANGAN DAN PLESTERAN

10,655,145.57
3,218,461.54

V PEKERJAAN KOLOM

41,472.00

VI PEKERJAAN PAGAR PIPA BESI DAN PINTU GERBANG

19,920,000.00

VII PEKERJAAN CAT

918,331.93
TOTAL - D

35,637,623.54

BANGUNAN PAGAR KIRI DAN KANAN


I PEKERJAAN PERSIAPAN

330,000.00

II PEKERJAAN TANAH

1,717,650.00

III PEKERJAAN PONDASI


IV PEKERJAAN PASANGAN DAN PLESTERAN

24,581,389.73
4,175,879.56

V PEKERJAAN KOLOM

4,736,016.00

VI PEKERJAAN PAGAR PIPA BESI

39,600,000.00

VII PEKERJAAN CAT

2,625,461.48
TOTAL - E

77,766,396.76

BANGUNAN PAGAR KIRI DAN KANAN


I PEKERJAAN PERSIAPAN

88,875.00

II PEKERJAAN TANAH

462,594.38

III PEKERJAAN PONDASI


IV PEKERJAAN PASANGAN DAN PLESTERAN

6,672,239.74
4,042,153.28

V PEKERJAAN KOLOM

1,184,004.00

VI PEKERJAAN CAT

1,235,720.53
TOTAL - F

13,685,586.92

HALAMAN
I PEKERJAAN PERSIAPAN

256,558.50

II PEKERJAAN PAVING BLOCK

16,642,613.00
TOTAL - G

16,899,171.50

SALURAN TERBUKA PASANGAN BATU BATA


I PEKERJAAN PERSIAPAN

196,600.00

II PEKERJAAN TANAH

591,297.54

III PEKERJAAN SALURAN

7,116,344.80
TOTAL - G

7,904,242.34

JUMLAH
PPN 10 %
TOTAL
DIBULATKAN
Terbilang

1,041,286,241.82
104,128,624.18
1,145,414,866.01
1,145,414,000.00
Tiga ratus empat puluh juta enam ratus tiga puluh enam ribu rupiah

Medan ,

Agustus 2006

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : SALURAN

No.

Uraian Pekerjaan

SALURAN TERBUKA PASANGAN BATU BATA

PEKERJAAN PERSIAPAN

1
2

m'
m'

49.15
49.15

2,500.00
1,500.00

122,875.00
73,725.00
196,600.00

m'
m'
m3
m3

49.15
49.15
10.32
2.58

2,500.00
2,000.00
33,750.00
8,437.50

122,875.00
98,300.00
348,350.63
21,771.91
591,297.54

m3
m3
m3

1.77
20.74
4.36

948,055.00
37,712.50
1,069,100.00

1,677,488.52
782,206.28
4,656,650.00
7,116,344.80
7,904,242.34

Total I
II

Jumlah
Harga
(Rp).

Stn

Pembersihan
Pengukuran Lapangan

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4

Pembersihan Site
Pembuatan Bouplank
Galian tanah
Timbunan kembali tanah bekas galian

A.1.
1/4A.1.

Sub Total II
III
1
2
3

PEKERJAAN SALURAN
Pasangan Batu Bata 1 : 2
Plesteran 1 : 2
Cor Lantai Bawah 1 : 2 : 3

G.32.M.
G.50.H.a
Supl. V.

Sub Total III


TOTAL BIAYA -SALURAN TERBUKA PASANGAN BATU BATA
DEPARTEMEN KELAUTAN DAN PERIKANAN

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : HALAMAN

No.

Uraian Pekerjaan

HALAMAN

PEKERJAAN PERSIAPAN

1
2

Pembersihan
Pengukuran Lapangan

m2
m2

103.66
103.66

1,425.00
1,050.00

147,715.50
108,843.00
256,558.50

m2
m2
m3
m3
m3

103.66
103.66
18.66
5.18
103.66

1,500.00
1,000.00
165,000.00
195,000.00
118,600.00

155,490.00
103,660.00
3,078,702.00
1,010,685.00
12,294,076.00
16,642,613.00
16,899,171.50

Total I
II

Jumlah
Harga
(Rp).

Stn

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN PAVING BLOCK

1
2
3
4
5

Pembersihan Site
Pembuatan Bouplank
Timbunan sirtu t = 18 cm
Timbunan Pasir urug t = 5cm
Paving Block

A.18
A.17.
Tamb .1

Sub Total II
TOTAL BIAYA - HALAMAN
DEPARTEMEN KELAUTAN DAN PERIKANAN

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : PAGAR BELAKANG

No.

Uraian Pekerjaan

BANGUNAN PAGAR KIRI DAN KANAN

PEKERJAAN PERSIAPAN

1
2

m'
m'

11.85
11.85

2,500.00
5,000.00

29,625.00
59,250.00
88,875.00

m'
m'
m3
m3
m3

11.85
11.85
5.69
1.42
0.41

5,000.00
10,000.00
33,750.00
8,437.50
195,000.00

59,250.00
118,500.00
191,970.00
11,998.13
80,876.25
462,594.38

m3
m'
m3

3.20
83.00
0.71

654,730.00
17,800.00
4,360,100.00

2,094,808.64
1,477,400.00
3,100,031.10
6,672,239.74

m3
m2
m2

2.70
48.38
4.80

819,309.50
34,415.00
34,415.00

2,212,135.65
1,664,825.63
165,192.00
4,042,153.28

m3

0.24

4,933,350.00

1,184,004.00
1,184,004.00

m2
m2

48.38
4.80

23,238.75
23,238.75

1,124,174.53
111,546.00
1,235,720.53
13,685,586.92

Total I
II

Jumlah
Harga
(Rp).

Stn

Pembersihan
Pengukuran Lapangan

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4
5

Pembersihan Site
Pembuatan Bouplank
Galian Tanah Pondasi
Timbunan Kembali Tanah Pondasi
Timbunan Pasir Urug Pondasi Pas.batu kali

A.1.
A.1.
A.17.

Sub Total II
III
1
2
3

PEKERJAAN PONDASI
Pondasi Pasangan Batu kali 1 : 4
Cerucuk Kayu Laut dia 4"
Sloof Beton Bertulang 1 : 2 : 3

G.32.
E.13
Supl. V.

Sub Total III


IV
1
2
3

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Bata 1: 4
Plesteran 1 : 4
Plesteran Kolom

G.32.H.
G.50.H.
G.50.H.

Sub Total IV
V

PEKERJAAN KOLOM

Kolom 20 x 20 cm Beton Bertulang 1 : 2 : 3

Supl. V.

Sub Total V
VI
1
2

PEKERJAAN CAT
Cat Tembok
Cat Kolom

K23
K23

Sub Total VI
TOTAL BIAYA PAGAR DEPAN
DEPARTEMEN KELAUTAN DAN PERIKANAN

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : PAGAR KIRI DAN KANAN

No.

Uraian Pekerjaan

BANGUNAN PAGAR KIRI DAN KANAN

PEKERJAAN PERSIAPAN

1
2

m'
m'

44.00
44.00

2,500.00
5,000.00

110,000.00
220,000.00
330,000.00

m'
m'
m3
m3
m3

44.00
44.00
21.12
5.28
1.54

5,000.00
10,000.00
33,750.00
8,437.50
195,000.00

220,000.00
440,000.00
712,800.00
44,550.00
300,300.00
1,717,650.00

m3
m'
m3

11.88
297.33
2.64

654,730.00
17,800.00
4,360,100.00

7,778,192.40
5,292,533.33
11,510,664.00
24,581,389.73

m3
m2
m2

2.45
43.86
19.20

819,309.50
34,415.00
34,415.00

2,005,669.66
1,509,441.90
660,768.00
4,175,879.56

m3

0.96

4,933,350.00

4,736,016.00
4,736,016.00

132.00

300,000.00

39,600,000.00
39,600,000.00

43.86
19.20
41.45

23,238.75
23,238.75
27,987.50

1,019,251.58
446,184.00
1,160,025.90
2,625,461.48
77,766,396.76

Total I
II

Jumlah
Harga
(Rp).

Stn

Pembersihan
Pengukuran Lapangan

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4
5

Pembersihan Site
Pembuatan Bouplank
Galian Tanah Pondasi
Timbunan Kembali Tanah Pondasi
Timbunan Pasir Urug Pondasi Pas.batu kali

A.1.
A.1.
A.17.

Sub Total II
III
1
2
3

PEKERJAAN PONDASI
Pondasi Pasangan Batu kali 1 : 4
Cerucuk Kayu Laut dia 4"
Sloof Beton Bertulang 1 : 2 : 3

G.32.
E.13
Supl. V.

Sub Total III


IV
1
2
3

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Bata 1: 4
Plesteran 1 : 4
Plesteran Kolom

G.32.H.
G.50.H.
G.50.H.

Sub Total IV
V

PEKERJAAN KOLOM

Kolom 20 x 20 cm Beton Bertulang 1 : 2 : 3

Supl. V.

Sub Total V
VI
1

PEKERJAAN PAGAR PIPA BESI


Pipa Besi Hitam dia. 4", tebal = 2.4 mm

Upah+bahan

M'

Sub Total VI
VII
1
2
3

PEKERJAAN CAT
Cat Tembok
Cat Kolom
Pengecatan Pagar Pipa

K23
K23
K23

m2
m2
m2

Sub Total VII


TOTAL BIAYA PAGAR DEPAN
DEPARTEMEN KELAUTAN DAN PERIKANAN

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : PAGAR DEPAN

No.

Uraian Pekerjaan

BANGUNAN PAGAR DEPAN

PEKERJAAN PERSIAPAN

1
2

m'
m'

19.00
19.00

2,500.00
5,000.00

47,500.00
95,000.00
142,500.00

m'
m'
m3
m3
m3

19.00
19.00
9.12
2.28
0.67

5,000.00
10,000.00
33,750.00
8,437.50
195,000.00

95,000.00
190,000.00
307,800.00
19,237.50
129,675.00
741,712.50

m3
m'
m3

5.13
130.67
1.14

654,730.00
17,800.00
4,360,100.00

3,358,764.90
2,325,866.67
4,970,514.00
10,655,145.57

m3
m2
m2
bh

0.73
13.06
10.80
6.00

819,309.50
34,415.00
34,415.00
300,000.00

597,276.63
449,502.92
371,682.00
1,800,000.00
3,218,461.54

m3

0.81

51,200.00

41,472.00
41,472.00

300,000.00
7,500,000.00

12,420,000.00
7,500,000.00
19,920,000.00

23,238.75
23,238.75
27,987.50

303,527.12
250,978.50
363,826.31
918,331.93
35,637,623.54

Total I
II

Jumlah
Harga
(Rp).

Stn

Pembersihan
Pengukuran Lapangan

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4
5

Pembersihan Site
Pembuatan Bouplank
Galian Tanah Pondasi
Timbunan Kembali Tanah Pondasi
Timbunan Pasir Urug Pondasi Pas.batu kali

A.1.
A.1.
A.17.

Sub Total II
III
1
2
3

PEKERJAAN PONDASI
Pondasi Pasangan Batu kali 1 : 4
Cerucuk Kayu Laut dia 4"
Sloof Beton Bertulang 1 : 2 : 3

G.32.
E.13
Supl. V.

Sub Total III


IV
1
2
3
4

PEKERJAAN PASANGAN DAN PLESTERAN


Pasangan Bata 1: 4
Plesteran 1 : 4
Plesteran Kolom
Pembuatan Kepala Kolom ( Bola )

G.32.H.
G.50.H.
G.50.H.
Upah+bahan

Sub Total IV
V

PEKERJAAN KOLOM

Kolom 30 x 30 cm Beton Bertulang 1 : 2 : 3

Supl. V.

Sub Total V
VI
1
2

PEKERJAAN PAGAR PIPA BESI DAN PINTU GERBANG


Pipa Besi Hitam dia. 4", tebal = 2.4 mm
Pintu Gerbang Lebar = 5.2 M

Upah+bahan
Upah+bahan

M'
unit

41.40
1.00

Sub Total VI
VII
1
2
3

PEKERJAAN CAT
Cat Tembok
Cat Kolom
Pengecatan Pagar Pipa

K23
K23
K23

m2
m2
m2

Sub Total XII


TOTAL BIAYA PAGAR DEPAN
DEPARTEMEN KELAUTAN DAN PERIKANAN

13.06
10.80
13.00

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : TEMPAT WUDHU WANITA

No.

Uraian Pekerjaan

BANGUNAN TEMPAT WUDHU WANITA

PEKERJAAN PERSIAPAN

1
2

m2
m2

7.50
7.50

1,425.00
1,050.00

10,687.50
7,875.00
18,562.50

m2
m'
m3
m3
m3
m3
m3

7.50
11.09
6.58
1.65
1.11
0.60
0.42

1,500.00
2,500.00
33,750.00
8,437.50
92,880.00
195,000.00
195,000.00

11,250.00
27,720.00
222,235.65
13,889.73
102,632.40
116,025.00
82,500.60
576,253.38

m3
m'
m3

3.08
104.70
0.73

654,730.00
17,800.00
4,360,100.00

2,018,165.94
1,863,731.20
3,162,293.33
7,044,190.47

m3
m2
m2

0.58
8.93
20.70

781,500.00
137,849.40
155,349.40

453,299.31
1,231,512.08
3,215,033.51
4,899,844.89

m3
m3
m2
m2
m2
m2
m2

2.48
3.61
20.70
59.82
7.91
8.99
4.95

948,055.00
819,309.50
37,712.50
34,415.00
34,415.00
34,415.00
34,415.00

2,354,786.59
2,953,756.58
780,697.78
2,058,784.45
272,179.63
309,261.79
170,440.29
8,899,907.12

m3
m3
m3
m3
m3

0.31
0.18
0.53
1.18
0.21

4,933,350.00
5,506,600.00
4,360,100.00
3,786,850.00
3,786,850.00

1,539,205.20
966,408.30
2,298,862.73
4,469,903.07
803,758.91
10,078,138.21

300,000.00

300,000.00
300,000.00

Total I
II

Jumlah
Harga
(Rp).

Stn

Pembersihan
Pengukuran Lapangan

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4
5
6
7

Pembersihan Site
Pembuatan Bouplank
Galian Tanah Pondasi
Timbunan Kembali Tanah Pondasi
Timbunan Tanah dalam Bangunan t = 0.13 m
Timbunan Pasir Urug dalam Bangunan T = 0.07 m
Timbunan Pasir Urug Pondasi Pas.batu kali

A.1.
A.1.
A.20.
A.17.
A.17.

Sub Total II
III
1
2
3

PEKERJAAN PONDASI
Pondasi Pasangan Batu kali 1 : 4
Cerucuk Kayu Laut dia 4"
Sloof Beton Bertulang 1 : 2 : 3

G.32.
E.13
Supl. V.

Sub Total III


IV
1
2
3

PEKERJAAN LANTAI KERAMIK


Lantai Kerja Beton Cor 1 : 3 : 5
Keramik Lantai 20 x 20 cm
Keramik Dinding 20 x 25 cm ( H = 1.75 m )

G.43.
G.72.D
Supl. IV

Sub Total IV
V

PEKERJAAN PASANGAN DAN PLESTERAN

1
2
3
4
5
6
7

Pasangan Bata 1: 2
Pasangan Bata 1: 4
Plesteran Trasram 1 : 2
Plesteran 1 : 4
Plesteran/Acian Balok
Plesteran/Acian Dak 1 : 4
Plesteran/Acian Dak 1 : 4

G.32.M.
G.32.H.
G.50.H.a
G.50.H.
G.50.H.
G.50.H.
G.50.H.

Sub Total V
VI
1
2
3
4
5

PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI


Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3
Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3
Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3
Pelat Dak Lantai Beton Bertulang 1 : 2 : 3
Listplank (10/30) Beton Bertulang 1 : 2 : 3

Supl. V.
Supl. V.
Supl. V.
Supl. V.
Supl. V.

Sub Total VI
VII
1

PEKERJAAN VENTILASI
Ventilasi V2 Kayu Uk. 22 x 110 cm

Upah+bahan

Sub Total VII

Unit

1.00

VIII
1
2
3
4

PEKERJAAN LISTRIK
Instalasi Listrik
Lampu Pijar 20 Watt
Saklar Ganda Tanam
Stop Kontak Tanam

Ttk
Bh
Bh
Bh

3.00
2.00
1.00
1.00

75,000.00
20,000.00
21,950.00
25,200.00

225,000.00
40,000.00
21,950.00
25,200.00
312,150.00

Bh
Bh
Bh
Bh

6.00
30.00
4.00
2.00

74,316.67
31,641.67
29,550.00
30,750.00

445,900.00
949,250.00
118,200.00
61,500.00
1,574,850.00

m2
m2
m2

80.52
21.85
1.48

23,238.75
23,238.75
27,987.50

Sub Total X

1,871,267.81
507,708.59
41,421.50
2,420,397.90

TOTAL BIAYA TEMPAT WUDHU WANITA

36,124,294.47

Upah+bahan
Upah+bahan
Upah+bahan
Upah+bahan

Sub Total XIII


IX
1
2
3
4

PEKERJAAN INSTALASI AIR


Instalasi Air Buangan Pipa PVC 4"
Instalasi Air Bersih Pipa PVC 1" ( sampai ke meteran air)

Upah+bahan

Kran Air
Floor drain

Upah+bahan

Upah+bahan

Upah+bahan

Sub Total IX
X

PEKERJAAN CAT

1
2
3

Cat Tembok
Cat Dak Lantai ,Balok dan Balok
Pengecatan Ventilasi Kayu

K23
K23
K23

DEPARTEMEN KELAUTAN DAN PERIKANAN

RENCANA ANGGARAN BIAYA


PEKERJAAN
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
SUB PEKERJAAN : TEMPAT WUDHU PRIA

No.

Uraian Pekerjaan

BANGUNAN TEMPAT WUDHU PRIA

PEKERJAAN PERSIAPAN

1
2

m2
m2

7.50
7.50

1,425.00
1,050.00

10,687.50
7,875.00
18,562.50

m2
m'
m3
m3
m3
m3
m3

7.50
11.09
6.58
1.65
1.11
0.60
0.42

1,500.00
2,500.00
33,750.00
8,437.50
92,880.00
195,000.00
195,000.00

11,250.00
27,720.00
222,235.65
13,889.73
102,632.40
116,025.00
82,500.60
576,253.38

m3
m'
m3

3.08
104.70
0.73

654,730.00
17,800.00
4,360,100.00

2,018,165.94
1,863,731.20
3,162,293.33
7,044,190.47

m3
m2
m2

0.58
8.93
20.70

781,500.00
137,849.40
155,349.40

453,299.31
1,231,512.08
3,215,033.51
4,899,844.89

m3
m3
m2
m2
m2
m2
m2

2.48
3.61
20.70
59.82
7.91
8.99
4.95

948,055.00
819,309.50
37,712.50
34,415.00
34,415.00
34,415.00
34,415.00

2,354,786.59
2,953,756.58
780,697.78
2,058,784.45
272,179.63
309,261.79
170,440.29
8,899,907.12

m3
m3
m3
m3
m3

0.31
0.18
0.53
1.18
0.21

4,933,350.00
5,506,600.00
4,360,100.00
3,786,850.00
3,786,850.00

1,539,205.20
966,408.30
2,298,862.73
4,469,903.07
803,758.91
10,078,138.21

300,000.00

300,000.00
300,000.00

Total I
II

Jumlah
Harga
(Rp).

Stn

Pembersihan
Pengukuran Lapangan

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4
5
6
7

Pembersihan Site
Pembuatan Bouplank
Galian Tanah Pondasi
Timbunan Kembali Tanah Pondasi
Timbunan Tanah dalam Bangunan t = 0.13 m
Timbunan Pasir Urug dalam Bangunan T = 0.07 m
Timbunan Pasir Urug Pondasi Pas.batu kali

A.1.
A.1.
A.20.
A.17.
A.17.

Sub Total II
III
1
2
3

PEKERJAAN PONDASI
Pondasi Pasangan Batu kali 1 : 4
Cerucuk Kayu Laut dia 4"
Sloof Beton Bertulang 1 : 2 : 3

G.32.
E.13
Supl. V.

Sub Total III


IV
1
2
3

PEKERJAAN LANTAI KERAMIK


Lantai Kerja Beton Cor 1 : 3 : 5
Keramik Lantai 20 x 20 cm
Keramik Dinding 20 x 25 cm ( H = 1.75 m )

G.43.
G.72.D
Supl. IV

Sub Total IV
V

PEKERJAAN PASANGAN DAN PLESTERAN

1
2
3
4
5
6
7

Pasangan Bata 1: 2
Pasangan Bata 1: 4
Plesteran Trasram 1 : 2
Plesteran 1 : 4
Plesteran/Acian Balok
Plesteran/Acian Dak 1 : 4
Plesteran/Acian Dak 1 : 4

G.32.M.
G.32.H.
G.50.H.a
G.50.H.
G.50.H.
G.50.H.
G.50.H.

Sub Total V
VI
1
2
3
4
5

PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI


Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3
Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3
Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3
Pelat Dak Lantai Beton Bertulang 1 : 2 : 3
Listplank (10/30) Beton Bertulang 1 : 2 : 3

Supl. V.
Supl. V.
Supl. V.
Supl. V.
Supl. V.

Sub Total VI
VII
1

PEKERJAAN VENTILASI
Ventilasi V2 Kayu Uk. 22 x 110 cm

Upah+bahan

Sub Total VII

Unit

1.00

VIII
1
2
3
4

PEKERJAAN LISTRIK
Instalasi Listrik
Lampu Pijar 20 Watt
Saklar Ganda Tanam
Stop Kontak Tanam

Ttk
Bh
Bh
Bh

3.00
2.00
1.00
1.00

75,000.00
20,000.00
21,950.00
25,200.00

225,000.00
40,000.00
21,950.00
25,200.00
312,150.00

Bh
Bh
Bh
Bh

6.00
30.00
4.00
2.00

74,316.67
31,641.67
29,550.00
30,750.00

445,900.00
949,250.00
118,200.00
61,500.00
1,574,850.00

m2
m2
m2

80.52
21.85
1.48

23,238.75
23,238.75
27,987.50

Sub Total X

1,871,267.81
507,708.59
41,421.50
2,420,397.90

TOTAL BIAYA TEMPAT PRIA

36,124,294.47

Upah+bahan
Upah+bahan
Upah+bahan
Upah+bahan

Sub Total XIII


IX
1
2
3
4

PEKERJAAN INSTALASI AIR


Instalasi Air Buangan Pipa PVC 4" klas D setara Vinilex
Instalasi Air Bersih Pipa PVC 1" ( sampai ke meteran air)

Upah+bahan

Kran Air
Floor drain

Upah+bahan

Upah+bahan

Upah+bahan

Sub Total IX
X

PEKERJAAN CAT

1
2
3

Cat Tembok
Cat Dak Lantai ,Balok dan Balok
Pengecatan Ventilasi Kayu

K23
K23
K23

DEPARTEMEN KELAUTAN DAN PERIKANAN

RENCANA ANGGARAN BIAYA


PEKERJAAN
LOKASI

No.

: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG


:

Uraian Pekerjaan

BANGUNAN MESJID

PEKERJAAN PERSIAPAN

1
2
3
4
5
6

ls
bh
ls
m2
m2
ls

1.00
1.00
1.00
288.63
288.63
1.00

1,500,000.00
200,000.00
3,500,000.00
1,425.00
1,050.00
350,000.00

1,500,000.00
200,000.00
3,500,000.00
411,290.63
303,056.25
350,000.00
6,264,346.88

m2
m'
m3
m3
m3
m3
m3
m3
m3

288.63
72.00
192.52
48.13
143.78
46.24
16.77
5.66
2.08

1,500.00
2,500.00
33,750.00
8,437.50
92,880.00
92,880.00
195,000.00
195,000.00
195,000.00

432,937.50
180,000.00
6,497,415.00
406,088.44
13,353,822.00
4,294,325.38
3,270,881.25
1,103,438.70
405,600.00
29,944,508.26

m3
m3
m3
m'
m3

4.14
18.73
17.29
1,768.00
7.84

781,500.00
3,786,850.00
654,730.00
17,800.00
4,360,100.00

3,233,944.69
70,908,766.25
11,320,281.70
31,470,400.00
34,172,283.75
151,105,676.39

m3
m2
m2
m'

22.43
239.63
88.34
108.40

781,500.00
120,422.00
120,422.00
37,188.25

17,530,928.42
28,856,121.75
10,637,718.21
4,031,206.30
61,055,974.68

m3
m3
m2
m2
m2
m2
m2
m2
m2

26.97
62.89
449.57
1,082.12
0.68
12.34
61.70
76.05
27.45

948,055.00
819,309.50
37,712.50
34,415.00
212,362.87
34,415.00
34,415.00
34,415.00
34,415.00

25,572,769.21
51,530,367.77
16,954,238.92
37,241,276.81
143,344.93
424,543.44
2,123,405.50
2,617,260.75
944,691.75
137,551,899.08

m3

9.04

4,360,100.00

39,415,304.00

Total I
II

Jumlah
Harga
(Rp).

Stn

Mobilisasi dan Demobilisasi


Papan Nama Proyek
Direksi Keet
Pembersihan
Pengukuran Lapangan
Foto Dokumentasi

Volume

Harga
Satuan
(Rp.)

ANL

PEKERJAAN TANAH

1
2
3
4
5
6
7
8
9

Pembersihan Site
Pembuatan Bouplank
Galian Tanah Pondasi dan Selasar/Teras
Timbunan Kembali Tanah Pondasi
Timbunan Tanah dalam Bangunan
Timbunan Tanah Teras
Timbunan Pasir Urug dalam Bangunan
Timbunan Pasir Urug Teras
Timbunan Pasir Urug Pondasi Pas.batu kali

A.1.
1/4A.1.
A.20.
A.20.
A.17.
A.17.
A.17.

Sub Total II
III
1
2
3
4
5

PEKERJAAN PONDASI
Lantai Kerja Pondasi Menerus Beton Cor 1 : 3 : 5
Pondasi Menerus Beton Bertulang 1 : 2 : 3
Pondasi Pasangan Batu kali 1 : 4
Cerucuk Kayu Laut dia 4"
Sloof Beton Bertulang 1 : 2 : 3

G.43.
G.32.
Supl. V.
E.13
Supl. V.

Sub Total III


IV
1
2
3
4

PEKERJAAN LANTAI KERAMIK


Lantai Kerja Beton Cor 1 : 3 : 5
Keramik Lantai Dalam Bangunan 30 x 30 cm
Keramik Lantai Teras 30 x 30 cm
Plin dinding keramik10 x 30 cm

G.43.
G.72.C
G.72.C
G.72.D

Sub Total IV
V

PEKERJAAN PASANGAN DAN PLESTERAN

1
2
3
4
5
5
6
7
8

Pasangan Bata 1: 2
Pasangan Bata 1: 4
Plesteran Trasram 1 : 2
Plesteran 1 : 4
Pasangan Ventilasi block 1: 4
Sponengan/tali air lebar = 10 cm,tebal 1.5 cm
Plesteran/Acian Kolom 1 : 4
Plesteran/Acian Balok
Plesteran/Acian Dak 1 : 4

G.32.M.
G.32.H.
G.50.H.a
G.50.H.
G.50.H.
G.50.H.
G.50.H.
G.50.H.
G.50.H.

Sub Total V
VI
1

PEKERJAAN KOLOM, BALOK DAN PELAT LANTAI


Kolom 20 x 40 cm Beton Bertulang 1 : 2 : 3

Supl. V.

2
3
4
5
6
7

Kolom 15 x 20 cm Beton Bertulang 1 : 2 : 3


Kolom Praktis 15 x 15 cm Beton Bertulang 1 : 2 : 3
Balok 15 x 60 cm Beton Bertulang 1 : 2 : 3
Balok Praktis 15 x 20 cm Beton Bertulang 1 : 2 : 3
Balok 15 x 30 cm Beton Bertulang 1 : 2 : 3
Pelat Dak Lantai Beton Bertulang 1 : 2 : 3

Supl. V.
Supl. V.
Supl. V.
Supl. V.
Supl. V.
Supl. V.

m3
m3
m3
m3
m3
m3

2.16
1.47
4.56
6.40
0.54
3.29

4,933,350.00
5,506,600.00
4,360,100.00
4,933,350.00
4,360,100.00
3,786,850.00

10,656,036.00
8,110,395.81
19,895,136.30
31,559,626.62
2,354,454.00
12,473,883.90
124,464,836.63

m3
m2
m2
m2
m'

7.91
420.90
420.90
63.27
159.47

7,015,884.89
41,000.00
159,350.00
93,579.55
45,311.15

55,474,645.67
17,257,000.41
67,070,805.27
5,920,879.64
7,225,678.47
152,949,009.46

Sub Total VI
VII
1
2
3
4
5

PEKERJAAN KUDA - KUDA DAN ATAP


Kuda-kuda
Rangka Atap Genteng Metal
Atap Genteng Metal
Rabung Genteng
Lisplank Kayu Dowble

F.22
F.19
H.8b
H.10.A
F 21

Sub Total VII


VIII
1
2
3
4
5
6
7
8

PEKERJAAN PINTU DAN JENDELA


Kusen Pintu Uk. 215 x 80 cm
Pintu Sliding Bingkai kaca rangka Aluminium uk.200 x 260 cm Komplit
Kunci dan alat penggantung ( 2 daun Ventilasi lengkung )

F.27

m3

0.08

8,263,884.89

656,978.85

Upah+bahan

unit

3.00

6,240,000.00

18,720,000.00

Jendela Kaca Rangka Aluminium uk.196 x 2230 cm Komplit Kunci dan


alat penggantung ( 3 daun dengan Ventilasi lengkung )

Pintu Panel P1 Uk. 210 x 80 cm (1 daun)

Upah+bahan

m2
Unit

3.44
6.00

450,940.80
4,152,260.00

1,551,236.35
24,913,560.00

Jendela Kaca Rangka Aluminium uk.70 x 2230 cm Komplit Kunci dan


alat penggantung ( 1 daun dengan Ventilasi lengkung )

Upah+bahan

Unit

2.00

1,561,000.00

3,122,000.00

Jendela Kaca Rangka Aluminium uk.60 x 138 cm Komplit Kunci dan alat
penggantung ( 1 Daun )

Upah+bahan

Unit

2.00

1,035,000.00

2,070,000.00

Ventilasi Kaca mati Rangka Aluminium uk 30 x 30 cm


Ventilasi V2 Kayu Uk. 22 x 22 cm (1 daun)

Upah+bahan

Unit
Unit

40.00
96.00

250,000.00
100,000.00

10,000,000.00
9,600,000.00
70,633,775.20

bh
bh
bh

2.00
6.00
4.00

113,650.00
15,500.00
9,450.00

227,300.00
93,000.00
37,800.00
358,100.00

m2

416.64

74,270.83

30,944,287.74
30,944,287.74

Ttk
Bh
Bh
Bh
Set

36.00
30.00
15.00
6.00
1.00

75,000.00
85,000.00
21,950.00
25,200.00
110,500.00

2,700,000.00
2,550,000.00
329,250.00
151,200.00
110,500.00
5,840,950.00

m2
m2
m2
m2
m2
m2
m2
m2

1,082.12
416.64
3.38
27.45
71.76
137.75
181.63
6.88

23,238.75
23,238.75
23,238.75
23,238.75
27,987.50
23,238.75
27,987.50
27,987.50

Sub Total XII

25,147,195.16
9,682,220.69
78,430.78
637,903.69
2,008,399.79
3,201,137.81
5,083,425.60
192,554.00
46,031,267.52

TOTAL BIAYA BANGUNAN MESJID

817,144,631.84

F.33

Upah+bahan

Sub Total VIII


IX
1
2
3

PEKERJAAN KUNCI DAN ALAT PENGGANTUNG


Kunci & Hendel Pintu
Engsel Pintu 4"
Grendel Pintu 10 "

Upah+bahan
Upah+bahan
Upah+bahan

Sub Total IX
X

PEKERJAAN PLAFOND

Plafond Gypsum 9 mm + rangka

F.37 A

Sub Total X
XI
1
2
3
4
5

PEKERJAAN LISTRIK
Instalasi Listrik
Lampu Down Light
Saklar Ganda Tanam
Stop Kontak Tanam
Sekering Box Dua Group

Upah+bahan
Upah+bahan
Upah+bahan
Upah+bahan
Upah+bahan

Sub Total XI
XII
1
2
3
4
5
6
7
8

PEKERJAAN CAT
(Cat setara Vinilex )
Cat Tembok
Cat Plafond
Cat Ventilasi Block
Cat Dak Lantai
Cat Lisplank
Pengecatan Kolom
Pengecatan Ventilasi Kayu
Pengecatan Pintu Kayu

K23
K23
K23
K23
K23
K23
K23
K23

DEPARTEMEN KELAUTAN DAN PERIKANAN

DAFTAR SATUAN UPAH DAN BAHAN


PEKERJAAN : 0
SATKER
: PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG
#REF!
: 0

No.

Jenis Tenaga Kerja dan Bahan

I.

Satuan

Harga Satuan
(Rp.)

DAFTAR SATUAN UPAH


1
2
3
4

II.

Pekerja
Mandor
Tukang
Kepala Tukang

Hari
Hari
Hari
Hari

50,000.00

m3
m3
m3
m3
bh
bh
m3
m3
m3
bh
bh
Zak
Zak
m3
m3
m3
m3
m3
m3

64,900.00
150,000.00
150,000.00
125,000.00
6,000.00
550.00
80,000.00
80,000.00
80,000.00
1,600.00
19,950.00
65,000.00
84,700.00
1,500,000.00
4,676,258.99
4,485,800.00
3,203,200.00
4,676,258.99
4,869,700.00
44,000.00
6,650.00
85,800.00
11,000.00
75,000.00
121,000.00
85,250.00
200,000.00
250,000.00
12,000.00
350.00
17,000.00
15,000.00
400.00
1,250.00
9,000.00

70,000.00

DAFTAR SATUAN BAHAN


1
2
3
4
5
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
23
24
25
26
27
28
29
30
31
32
33

Tanah Timbun
Pasir Timbun/Urug
Pasir Pasang
Sirtu
Ventilasi Block
Batu Bata Mesin
Batu Kerikil (A) Cor
Batu Koral 15 - 20 cm
Batu Koral 10 - 12.5 cm
Paving Block K 175 Holand Disk Warna Merah t = 6 cm
Kanstin K 175 Uk. 15 x 30 x 40 cm
Semen PC @ 50 kg
Semen Putih @ 40 kg
Broti/Papan Kayu Sembarang
Broti Kayu Meranti
Broti Kayu Damar Laut
Papan Kayu Meranti
Papan Kayu Meranti Batu
Papan Kayu Damar Laut
Kayu Laut 4"
Kayu Lat Asbest
Gypsum Board tebal 9 mm
Asbes Lokal 1 x 1 m
Magnesium Board 4mm Uk. 120x240 cm
Triplex Jati # 3 mm Uk. 120 x 240 cm
Triplex # 6 mm Uk. 120 x 240 cm
Triplex # 9 mm Uk. 120 x 240 cm
Triplex # 12 mm Uk. 120 x 240 cm
Paku Biasa
Paku Seng
Besi Beton
Besi Propil
Paku/Sekrup
Baut dia 12 mm
Kawat Beton

Btg
Btg
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Kg
Bh
Kg
Kg
Bh
Bh
Kg

upahbahan - 22

No.
34
35
37
38
36
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
70
70
71
72
73
74
75
76
77
78
79
80
81
82

Jenis Tenaga Kerja dan Bahan


Atap Galvalum
Rabung Asbes Gelombang
Seng Plat BJLS 35
Atap Genteng Metal
Rabung Genteng
Cat Minyak/Perak (Setara Kuda Terbang)
Minyak Cat
Cat Tembok Setara Vinilex
Cat Vernis Jadi
Cat Meni
Residu (Colter)
Kaca Bening # 5 mm
Kaca Rybent # 5 mm
Kaca Blok # 5 mm
Kaca Nako Bening # 5 mm
Kaca Nako Rybent # 5 mm
Plint Keamik 15 x 30 cm
Keramik 10 x 20 cm Roman
Keramik 20 x 20 cm Roman
Keramik 20 x 25 cm Roman
Keramik 30 x 30 cm Roman
Keramik 40 x 40 cm Roman
Granito 40 x 40 cm
Pipa PVC (Paralon) Kwalited D dia 1/2"
Pipa PVC (Paralon) Kwalited AW dia 3/4"
Pipa PVC (Paralon) Kwalited AW dia 1"
Pipa PVC (Paralon) Kwalited AW dia 3"
Pipa PVC (Paralon) Kwalited AW dia 4"
Pipa Besi GIP dia 3/4"
Pipa Besi GIP dia 1/2"
Pipa Besi GIP dia 1"
Keran Air dia 1/2 "
Floor Drain 3"
Closed Duduk
Closed Jongkok
Bak Cuci Stainless Steel 1 Lobang
Bak Air Fibre
Shoapholder
Riol Beton dia 15 cm
Riol Beton dia 20 cm
Riol Beton dia 30 cm
Kunci Tanam Besar Union (Sejenis)
Kunci Tanam Kecil Union (Sejenis)
Engsel Pintu Cabut Uk 5"
Engsel Pintu Nilon Uk 4"
Engsel Jendela Cabut Uk 3"
Engsel Jendela Nilon Uk 3"
Ensel Millano 18 "
Ensel Millano 16 "
Engsel Pintu Lipat (Gudang)
Grendel Pintu

Satuan
m2
m'
Lbr
m2
Bh
Kg
Kg
Kg
Kg
Kg
Kg
m2
m2
m2
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Set
Set
Set
Set
Set
Bh

Harga Satuan
(Rp.)
53,289.47
19,950.00
40,000.00
90,000.00
25,000.00
38,500.00
11,850.00
13,650.00
33,600.00
33,000.00
3,300.00
119,800.00
146,450.00
19,950.00
8,800.00
9,950.00
2,750.00
1,500.00
3,300.00
4,125.00
5,909.09
10,450.00
35,400.00
34,950.00
36,850.00
40,920.00
148,500.00
355,900.00
99,850.00
73,250.00
146,400.00
14,550.00
15,750.00
1,270,500.00
159,750.00
408,375.00
300,000.00
60,000.00
20,600.00
27,500.00
33,000.00
78,650.00
48,400.00
10,300.00
11,500.00
7,900.00
10,300.00
75,050.00
66,550.00
38,750.00
5,450.00

upahbahan - 23

No.
83
84
85
77
78
79
80
81
82
83
84
85
86
87
88
89
90

Jenis Tenaga Kerja dan Bahan


Grendel Jendela
Hak Angin
Hak Angin lipat besar
Lampu TL 2 x 20 Watt (Komplit) Tanam Double
Lampu TL 1 x 20 Watt (Komplit)
Lampu Down Light
Lampu Neon Tabung
Stop Kontak Timbul
Stop Kontak Tanam
Saklar Tunggal Tanam
Saklar Seri Tanam
Saklar Triple Tanam
Saklar Triple Timbul
Saklar Seri Timbul
Saklar Enkle Timbul
Box Sekering 1 Group
Box Sekering 2 Group

Satuan
Bh
Set
Set
Set
set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set

Harga Satuan
(Rp.)
4,850.00
4,250.00
7,250.00
205,000.00
75,000.00
45,000.00
40,000.00
7,250.00
15,200.00
9,000.00
16,950.00
21,200.00
13,050.00
10,300.00
7,250.00
48,500.00
60,500.00

upahbahan - 24

DAFTAR ANALISA HARGA SATUAN

PEKERJAAN
LOKASI

:
:

PEMBANGUNAN MESJID DAN FASILITAS PENDUKUNG

Analisa

A.1.

Uraian

Harga
Satuan
(Rp.)

Volume

Orang
Orang

0.7500
0.0250

50,000.00
0.00
Jumlah

37,500.00
0.00
37,500.00
33,750.00

1 m3 Galian Tanah Berbatu / Lumpur


Pekerja
Mandor

Orang
Orang

1.5000
0.0500

50,000.00
0.00
Jumlah

75,000.00
0.00
75,000.00

1 m3 Pasir Urug
Pasir urug
Pekerja
Mandor

m3
Orang
Orang

1.2000
0.3000
0.0100

150,000.00
50,000.00
0.00
Jumlah

180,000.00
15,000.00
0.00
195,000.00

1 m3 Urugan Tanah
Tanah
Pekerja
Mandor

m3
Orang
Orang

1.2000
0.3000
0.0100

64,900.00
50,000.00
0.00
Jumlah

77,880.00
15,000.00
0.00
92,880.00

1 m3 Timbunan Sirtu
Sirtu
Pekerja
Mandor

m3
Orang
Orang

1.2000
0.3000
0.0100

125,000.00
50,000.00
0.00
Jumlah

150,000.00
15,000.00
0.00
165,000.00

1 m3 Pas. Batu Kali 1 : 4


Batu Kali
Pasir Pasang
Semen
Pekerja
Mandor
Tukang Batu
Kepala Tukang

m3
m3
Zak
Orang
Orang
Orang
Orang

1.2000
0.5522
3.2600
3.6000
0.1800
1.2000
0.1200

80,000.00
150,000.00
65,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

96,000.00
82,830.00
211,900.00
180,000.00
0.00
84,000.00
0.00
654,730.00

bh
m3
Zak
Orang
Orang
Orang
Orang

185.0000
2.1160
0.1891
4.5000
0.2550
1.5000
0.1500

6,000.00
150,000.00
65,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

1,110,000.00
317,398.33
12,292.22
225,000.00
0.00
105,000.00
0.00
1,769,690.55
212,362.87

1 m3 Galian Tanah Biasa


Pekerja
Mandor
Upah diambil Galian 90 %

A3/A4.

A.17.

A.20.

A.18

G.32.

G.32.H. a 1 m2 Pas. Ventilasi Block 1 : 4


Ventilasi Block
Pasir Pasang
Semen
Pekerja
Mandor
Tukang Batu
Kepala Tukang

Harga / m2
G.32.M.

Jumlah
Harga
(Rp.)

Satuan

1 m3 Pas. Batu Bata 1 : 2

Batu Bata
Semen
Pasir Pasang
Jumlah Bahan
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah Upah
Upah diambil 90 %

bh
zak
m3
Orang
Orang
Orang
Orang

450.0000
5.1470
0.4600

550.00
65,000.00
150,000.00

4.5000
0.2550
1.5000
0.1500

50,000.00
0.00
70,000.00
0.00

Jumlah
G.32.H.

1 m3 Pas. Batu Bata 1 : 4


Batu Bata
Semen
Pasir Pasang
Jumlah Bahan
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah Upah
Upah diambil 90 %

bh
zak
m3
Orang
Orang
Orang
Orang

450.0000
3.1663
0.4600

550.00
65,000.00
150,000.00

4.5000
0.2550
1.5000
0.1500

50,000.00
0.00
70,000.00
0.00

Jumlah
G.43.

1 m3 Beton Campuran 1 : 3 : 5
Kerikil
Semen
Pasir Pasang
Jumlah Bahan
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah Upah
Upah diambil 90 %

m3
zak
m3

1.0000
5.0000
0.5000

80,000.00
65,000.00
150,000.00

Orang
Orang
Orang
Orang

6.0000
0.3000
0.5000
0.0500

50,000.00
0.00
70,000.00
0.00

Jumlah
Supl. V.

1 M3 Beton Campuran 1 : 2 : 3
Pasir Pasang
Batu. Kerikil
Semen
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Bahan Besi Beton
Untuk 100 kg besi diperlukan 110 kg besi
Besi
Kawat ikat
Jumlah Bahan
Pekerja
Tukang Besi
Kepala Tukang
Jumlah Upah
Upah diambil 50 %

m3
m3
zak
Orang
Orang
Orang
Orang

kg
kg

Orang
Orang
Orang

247,500.00
205,809.50
69,000.00
522,309.50
225,000.00
0.00
105,000.00
0.00
330,000.00
297,000.00
819,309.50

80,000.00
325,000.00
75,000.00
480,000.00
300,000.00
0.00
35,000.00
0.00
335,000.00
301,500.00
781,500.00

0.5400
0.8200
8.5000
6.0000
0.3000
1.0000
0.1000

150,000.00
80,000.00
65,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah = A

81,000.00
65,600.00
552,500.00
300,000.00
0.00
70,000.00
0.00
1,069,100.00

110.0000
2.0000

17,000.00
9,000.00

1,870,000.00
18,000.00
1,888,000.00

6.7500
6.7500
2.2500

50,000.00
70,000.00
0.00

337,500.00
472,500.00
0.00
810,000.00
405,000.00
2,293,000.00
1,719,750.00
2,293,000.00
2,866,250.00
3,439,500.00
4,012,750.00

Jumlah = B
Untuk besi 75 kg = 0.75 x B
Untuk besi 75 kg =1.0 x B
Untuk besi 125 kg = 1.25 x B
Untuk besi 150 kg = 1.50 x B
Untuk besi 175 kg = 1.75 x B

247,500.00
334,555.00
69,000.00
651,055.00
225,000.00
0.00
105,000.00
0.00
330,000.00
297,000.00
948,055.00

Untuk besi 200 kg = 2.00 x B


Bahan Begesting (Cetakan)
Kayu Bekesting (dipakai 2 kali)
Paku
Jumlah Bahan
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Pekerja (bongkar bekesting)
Jumlah Upah
Upah
Bekesting dipakai 2 kali

4,586,000.00

m3
kg

0.4000
4.0000

750,000.00
12,000.00

Orang
Orang
Orang
Orang
Orang

2.0000
0.1000
5.0000
0.5000
4.0000

50,000.00
0.00
70,000.00
0.00
50,000.00

Jumlah = C

Untuk 1 m3 beton bertulang besi 75 kg


Untuk 1 m3 beton bertulang besi 100 kg
Untuk 1 m3 beton bertulang besi 125 kg
Untuk 1 m3 beton bertulang besi 150 kg
Untuk 1 m3 beton bertulang besi 175 kg
Untuk 1 m3 beton bertulang besi 200 kg
G.50.H.

1 M2 Plesteran 1 : 4 tebal 10
Semen
Pasir Pasang
Jumlah Bahan
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah Upah
Upah diambil 80 %

3,786,850.00
4,360,100.00
4,933,350.00
5,506,600.00
6,079,850.00
6,653,100.00

zak
m3

0.1220
0.0139

65,000.00
150,000.00

Orang
Orang
Orang
Orang

0.4000
0.0200
0.1500
0.0150

50,000.00
0.00
70,000.00
0.00

Jumlah
G.50.H.a

1 M2 Plesteran 1 : 2 tebal 10
Semen
Pasir Pasang
Jumlah Bahan
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah Upah
Upah diambil 80 %

zak
m3

0.1785
0.0114

65,000.00
150,000.00

Orang
Orang
Orang
Orang

0.4000
0.0200
0.1500
0.0150

50,000.00
0.00
70,000.00
0.00

Jumlah
E.13

1 M' Cerucuk dia 4 " cm


Upah
Pekerja
Mandor
Tukang Kayu
Kepala Tukang
Jumlah Upah
Upah diambil 50 %
Bahan
Kayu dia 4"
Jumlah Bahan

1 m' Plint Keramik 10 x 30 cm


Plint Keramik 15 x 30 cm
Semen
Pasir

7,930.00
2,085.00
10,015.00
20,000.00
0.00
10,500.00
0.00
30,500.00
24,400.00
34,415.00

11,602.50
1,710.00
13,312.50
20,000.00
0.00
10,500.00
0.00
30,500.00
24,400.00
37,712.50

Orang
Orang
Orang
Orang

0.2000
0.0215
0.0200
0.0020

50,000.00
0.00
70,000.00
0.00

10,000.00
0.00
1,400.00
0.00
11,400.00
5,700.00

1.1000

11,000.00

12,100.00
12,100.00

Jumlah
G.68.A

300,000.00
48,000.00
348,000.00
100,000.00
0.00
350,000.00
0.00
200,000.00
650,000.00
650,000.00
998,000.00

bh
zak
m3

3.3330
0.0765
0.0070

2,750.00
65,000.00
150,000.00

17,800.00

9,165.75
4,972.50
1,050.00

G.72.B

G.72.C

G.72.D

Supl. IV

F.22

Pekerja
Mandor
Tukang
Kepala Tukang

Orang
Orang
Orang
Orang

0.3000
0.0150
0.1000
0.0100

50,000.00
0.00
70,000.00
0.00
Jumlah

15,000.00
0.00
7,000.00
0.00
37,188.25

1 m2 Lantai Keramik 40 x 40 cm
Keramik (Roman)
Semen
Semen Putih
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

bh
zak
zak
m3
Orang
Orang
Orang
Orang

6.2500
0.1420
0.0020
0.0230
0.5000
0.0250
0.2500
0.0250

10,450.00
65,000.00
84,700.00
150,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

65,312.50
9,230.00
169.40
3,450.00
25,000.00
0.00
17,500.00
0.00
120,661.90

1 m2 Lantai Keramik 30 x 30 cm
Keramik (Roman)
Semen
Semen Putih
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

bh
zak
zak
m3
Orang
Orang
Orang
Orang

11.0000
0.1420
0.0020
0.0230
0.5000
0.0250
0.2500
0.0250

5,909.09
65,000.00
121,000.00
150,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

65,000.00
9,230.00
242.00
3,450.00
25,000.00
0.00
17,500.00
0.00
120,422.00

1 m2 Lantai Keramik 20 x 20 cm
Keramik (Roman)
Semen
Semen Putih
Pasir
Pekerja
Mandor
Tukang
Kepala Tukang

bh
zak
m3
m3
Orang
Orang
Orang
Orang

25.0000
0.1420
0.0020
0.0230
0.5000
0.0250
0.2500
0.0250

3,300.00
65,000.00
84,700.00
150,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

82,500.00
9,230.00
169.40
3,450.00
25,000.00
0.00
17,500.00
0.00
137,849.40

1 m2 Dinding Keramik 20 x 25 cm
Keramik (Roman)
Semen
Semen Putih
Pasir
Pekerja
Mandor
Tukang
Kepala Tukang

bh
zak
m3
m3
Orang
Orang
Orang
Orang

20.0000
0.1420
0.0020
0.0230
0.5000
0.0500
0.5000
0.0500

4,125.00
65,000.00
84,700.00
150,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

82,500.00
9,230.00
169.40
3,450.00
25,000.00
0.00
35,000.00
0.00
155,349.40

m3

1.1000

4,676,258.99

Orang
Orang
Orang
Orang

8.0000
0.4000
24.0000
2.4000

50,000.00
0.00
70,000.00
0.00

5,143,884.89
5,143,884.89
400,000.00
0.00
1,680,000.00
0.00
2,080,000.00
1,872,000.00
7,015,884.89

1 M3 Kuda-Kuda Kayu
Kayu Meranti
Jumlah Bahan
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah Upah
Upah diambil 90 %

Jumlah
F.19

1 m2 Pasang Rangka Atap Genteng Metal


Rangka :
Kayu Meranti

m3

0.0110

4,676,258.99

51,438.84

Paku Biasa
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah bahan /Upah
Dibulatkan
H.8b

1 m2 Atap Genteng Metal


Atap Genteng metal
Paku Seng
Jumalah Bahan
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah Upah
Upah diambil 65 %

Kg
Orang
Orang
Orang
Orang

0.1000
0.0150
0.0075
0.1000
0.0100

12,000.00
50,000.00
0.00
70,000.00
0.00

1,200.00
750.00
0.00
7,000.00
0.00
60,388.84
41,000.00

m2
bh

1.1000
4.0000

90,000.00
12,000.00

Orang
Orang
Orang
Orang

0.1000
0.0050
0.2000
0.0200

50,000.00
0.00
70,000.00
0.00

99,000.00
48,000.00
147,000.00
5,000.00
0.00
14,000.00
0.00
19,000.00
12,350.00
159,350.00

Jumlah
H.10.A

F.27

F.33

F.36. A

F.36. B

1 m' Rabung Genteng


Rabung Genteng
Semen
Pasir Pasang
Pekerja
Mandor
Tukang
Kepala Tukang

Bh
Zak
m3
Orang
Orang
Orang
Orang

3.5000
0.033747
0.00324
0.0400
0.0020
0.0200
0.0020

25,000.00
65,000.00
150,000.00
50,000.00
0.00
70,000.00
0.00
Jumlah

87,500.00
2,193.55
486.00
2,000.00
0.00
1,400.00
0.00
93,579.55

1 M3 Kosen Kayu
Kayu Meranti
Pekerja
Mandor
Tukang
Kepala Tukang

m3
Orang
Orang
Orang
Orang

1.1000
12.0000
0.6000
36.0000
3.6000

4,676,258.99
50,000.00
0.00
70,000.00
0.00
Jumlah

5,143,884.89
600,000.00
0.00
2,520,000.00
0.00
8,263,884.89

1 M2 Pintu Panel
Papan Meranti
Pekerja
Mandor
Tukang
Kepala Tukang

m'
Orang
Orang
Orang
Orang

0.0440
2.0000
0.0200
3.0000
0.0300

3,203,200.00
50,000.00
0.00
70,000.00
0.00
Jumlah

140,940.80
100,000.00
0.00
210,000.00
0.00
450,940.80

1 M2 Pintu Kaca
Kaca tebal 5 mm
Pekerja
Mandor
Tukang
Kepala Tukang

m'
Orang
Orang
Orang
Orang

1.0000
0.2000
0.1000
0.6000
0.0600

119,800.00
50,000.00
0.00
70,000.00
0.00
Jumlah

119,800.00
10,000.00
0.00
42,000.00
0.00
171,800.00

m2

1.0000

119,800.00

Orang
Orang
Orang
Orang

0.2000
0.0100
0.6000
0.0600

50,000.00
0.00
70,000.00
0.00

119,800.00
119,800.00
10,000.00
0.00
42,000.00
0.00
52,000.00
31,200.00
151,000.00

1 M2 Jendela Kaca
Kaca tebal 5 mm
Jumlah Bahan
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah Upah
Upah diambil 60 %

Jumlah

F.36. C

1 M2 Jendela Kaca
Kaca tebal 5 mm
Kayu Meranti
Jumlah Bahan
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah Upah
Upah diambil 60 %

m2
m3

1.0000
0.0350

119,800.00
4,676,258.99

Orang
Orang
Orang
Orang

0.2000
0.0100
0.6000
0.0600

50,000.00
0.00
70,000.00
0.00

Jumlah

F.19

K23

1 m2 Pasang Rangka Atap Genteng Metal


Rangka :
Kayu Meranti
Paku Biasa
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah bahan /Upah
Dibulatkan

m3
Kg
Orang
Orang
Orang
Orang

0.0110
0.1000
0.0150
0.0075
0.1000
0.0100

4,676,258.99
12,000.00
50,000.00
0.00
70,000.00
0.00

51,438.84
1,200.00
750.00
0.00
7,000.00
0.00
60,388.84
41,000.00

Orang
Orang
Orang
Orang

5.0000
0.2500
7.5000
0.7500

50,000.00
0.00
70,000.00
0.00
Jumlah

250,000.00
0.00
525,000.00
0.00
775,000.00
7,750.00
5,812.50

Cat Tembok
Upah
Cat Tembok Setara Vinilex

kali
kg

3.0000
0.4250

5,812.50
13,650.00
Jumlah

17,437.50
5,801.25
23,238.75

Cat Minyak
Upah
Cat

kali
kg

2.0000
0.4250

5,812.50
38,500.00
Jumlah

11,625.00
16,362.50
27,987.50

Cat Menie
Upah
Cat

kali
kg

1.0000
0.2833

5,812.50
33,000.00
Jumlah

5,812.50
9,348.90
15,161.40

Cat Residu (Colter)


Upah
Cat

kali
kg

1.0000
0.2833

5,812.50
3,300.00
Jumlah

5,812.50
934.89
6,747.39

m2
Ls

1.1000
1.0000

29,791.67
22,500.00

Orang
Orang
Orang
Orang

0.1000
0.0100
0.2000
0.0800

50,000.00
0.00
70,000.00
0.00

100 m2 Mengecat
Pekerja
Mandor
Tukang
Kepala Tukang
Untuk 1 m2
Upah diambil 75 %

F.37 A

119,800.00
163,669.06
283,469.06
10,000.00
0.00
42,000.00
0.00
52,000.00
31,200.00
314,669.06

1 m2 Rangka dan Plafon Gymsum


Gypsum boar
Rangka alunium, Besi Siku, dan lain -lain
Jumlah bahan
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah Upah

Jumlah

32,770.83
22,500.00
55,270.83
5,000.00
0.00
14,000.00
0.00
19,000.00
74,270.83

F 21

1 m' Lisplank
Papan Damat Laut
Paku
Jumlah Bahan
Pekerja
Mandor
Tukang
Kepala Tukang
Jumlah Upah
Upah diambil 80 %

Tamb .1

1 M2 Pemasangan Paving Block


Paving Block K 175
Pasir Urug
Jumlah Bahan
Pekerja
Mandor
Tukang Batu
Kepala Tukang
Jumlah Upah

m3
kg

0.0045
0.0500

4,869,700.00
19,950.00

Orang
Orang
Orang
Orang

0.1120
0.0560
0.3200
0.0320

50,000.00
0.00
70,000.00
0.00
Jumlah

bh
m3

46.0000
0.1200

1,600.00
150,000.00

Orang
Orang
Orang
Orang

0.4000
0.0200
0.1000
0.0100

50,000.00
0.00
70,000.00
0.00
Jumlah

21,913.65
997.50
22,911.15
5,600.00
0.00
22,400.00
0.00
28,000.00
22,400.00
45,311.15

73,600.00
18,000.00
91,600.00
20,000.00
0.00
7,000.00
0.00
27,000.00
118,600.00