Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

SAT*{JAYA MEGANTARA SENTOSA

GENERAL CONTRACTOR. DEVELOPER & SUPPLTER


Kmtor Pusat : Jl. Gatot Subroto No. 12 Sidorjo Tlp. O3l-5349567
Kmtor Cab. I(diri : JI. Pmglima Sudirmm ds. Tiron IGc. Bmyakan - Ifudiri

PERINICTAN PENAWARAN
r PT.IIURINDA IRON SrEEL

PROYEK

':

PEIGRJAAN

to(Ast

BOX CIJLVERT

: 66 UNIT D(, TEbIRI


HAPGA PFNAWARAN

Dimention
No

Description

I
1,U

Area
m2

Nos

159,54

2,m

169.54

1.00

169,s4

2,fi

volume
m3

Ket

I-[ARGA
QAT IAN

JUMI..AI{

m1

ffi

m2
m1

@ry

60.000
85 000
e5.000
't1.500

12.410.142
24.421 460
13.444.363
2.949.486

169,s4

1,00

159.s4

1.00

L,O2

159,s4

1,00

m2
m3
m2

169,54

1,00

lnz

1'1.500
11 500

1_988.681

t.o2

169.54

LM

m1

50.000

8.476.900

L,O2

11,00

tt.z

z,@

lLm

tuk

65 000
30.000

743-886
660.000

m2

250 000

3.557.400

kr

15 000

r 842 3e8

kr

't5.000

56.700

OB'

m3

2 5()0 000

tB20

m1

1.22

5
6
7
8

t,22

1.74

1.988.581

9
iobok box cutvert
itek besi

I,O2

11,,t{

ztu

,eklstins
Frame Box control

o,o7

t.o2

44.0C

3.14

o,72
0,72
o.72

44,0C

2,22

TutuD box control

o,07
0.10

44,0C

3,17

0,72

11.fi

,embesian

5.7C

$a

Tutuo box contrcl 6 15

o.67

10,o[

11.0C

Berat (kp)
L.57Ai

Pecansan o 1o

o,la

2.m

11.0C

0.6165

iiku50x50x5

o-72

o_72

88.0C

o,o7

1,02

22,U.

0,07

o.72
o.72

22,U.

(lcl
3.74

:oncrete
Frame Box contml

10

6.51

t22fi
Berat

LL6.32

0,15
0.15
o.72

Tutuo box control

0.10

'j2,{
0,24
o,L7
0.57

11.0(

2.43O./*5O

Area Pintu

Cutter asml

7.m

2.m
1,m

7,fi

2,00

7,il

7.@

Bobok aspal t = 10 cm

1,22

Cutter beton
- Bobok beton t = 15 cm
Galian tanah

t.22

l-22

1.G'

7.60

1,m
1.m

Urufan sirtu

1,22

1,09

7,fi

1,00

- Pioa salvanis 66'

0,02

7,il

1,00

7-6f,

1.m

m2

9,27

15,20

m1

10.11

m2
m3

927
10,1r
(0,13

9,gt
Bekistim

Pembesian6l6

o.20
oL6
6,.0

0,97
?.75

152,00

10,0(

t,3782
0.616!

n3
m2

1.52
Berat (kc)
232,74
47.78

NA7

kr

1,55

m3

11

21s"80

ln2

t2

213^80

62

13

215,80

ma

14

21gL

m2

Concrete

1,02

o,20

7,il

1,00

12.250
325-500
15.000
315-250

2.643.550
70,212.900
3.237.000

Jumhi
Dibul.tlEr

z,,l-521.!fi7

68_030.950
?;23.621.

IERBTIANG : DltA RATUS DUA PULUH T,6A tltTA UMA nAruS UtA PULUH EMPAI NBU RUHAH

Kediri, t2 September 2Ot4

ffiN:m;rr*,
fulonoger

You might also like