Professional Documents
Culture Documents
Form Eps 19A Confirmation For Handing Over by Consultant (To Be Filled by Consultant)
Form Eps 19A Confirmation For Handing Over by Consultant (To Be Filled by Consultant)
Consultant
_____________________________________________________
Name of Development
_____________________________________________________
File No
_____________________________________________________
Date
_____________________________________________________
c)
completed all outstanding works and rectified all defects as per final joint inspection
report.
prepared three (3) set of master keys to be handed over for main gates of service
reservoir/ pump house/suction tank/manhole covers/ chambers)
Paid all outstanding TNB bills, a copy of which is enclosed.
d)
Others _______________________________________________________
b)
: _________________________________
Name
: _________________________________
PE No
: _________________________________
Designation
: _________________________________
Date
: _________________________________