CONSTRUCTION OF RAILWAY OVER BRIDGE IN LIEU OF LC NO 8 & LC NO 25

1. TOTAL LENGTH OF BRIDGE

1232.742 M.

2. OVERALL WIDTH OF BRIDGE

12.000 M.

3. CLEAR CARRIAGE WAY

7.500 M.

4. FOOTHPAHT

2.250 M. ON EITHER SIDE

5. LENGTH OF RAILWAY PORTION

30x1+30x1=60.000 M

6. FORMATION LEVEL

125.236 M. AT RAILWAY SPAN


& VARIES IN APPROCH PORTION IN GR 1:30

7. LENGTH OF VAIDUCT PORTION

638.000 M.

A. UJJAIN SIDE

242.000 M. (11 SPAN @ 22.000 M.)

B. BADHNAGAR SIDE

220.000 M. (10 SPAN @ 22.000 M.)

C.CHINTAMAN SIDE

198.000 M. (9 SPAN @ 22.000 M.)

8. LENGTH OF RETURN. WALL

370.000 M.

A. UJJAIN SIDE

100.000 M.

B. BADHNAGAR SIDE

160.000 M.

C. CHINTAMAN SIDE

110.000 M.

9. LEVELED PORTION

142.742 M. (5 SPAN @ 24.000 M. & 1 SPAN @ 22.742 M.)

A. CHINTAMAN SIDE

22.000 M.

10. AMOUNT OF ESTIMATED IN LACS

RS 2637.43 LAKHS

11. AMOUNT OF TS WITH REFRENCE

RS 1622.34 LAKHS

RE WALL 160.000 M.

220.000 M.

GR 1:30

A1

P1

P2

P3

P4

P5

P6

P7

P8

P9

RP1

BRIDGE ELEVATION AT BADHNAGAR SIDE


220.000 M. (10 SPAN @ 22.000 M.)

LEVEL PORTION 202.742 M.


RLY 30.000 M.

142.742 M.

RLY 30.000 M.

B.G. LINE

242.000 M.

RE WALL 100.000 M.

M.G. LINE
FORMATION LVL.
R.L. 125.236 M.
GR 1:30

RP1

RP2

P10

P11

P12

P13

P14

RP3

RP4

P15

P16

P17

P18

P19

P20

P21

P22

P23

BRIDGE ELEVATION BETWEEN RAILWAYS 142.742 M. (5 SPAN @ 24.000 M. & 1 SPAN @


22.742 M)
& UJJAIN SIDE 242.000 M. (11 SPAN @ 22.000 M.)
RE WALL 110.000 M.

198.000 M.
LEVELED SPAN

FORMATION LVL.
R.L. 125.236 M.

GR 1:30

A3

P33

P32

P31

P30

P29

P28

P27

P26

P25

BRIDGE ELEVATION AT CHINTAMAN SIDE


SIDE 198.000 M. (9 SPAN @ 22.000 M.)

P24

A2