Screw Calculaction: Object

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Ineniring in proizvodnja montanih objektov

Prijatljeva 12, 8210 Trebnje, Slovenija


Phone: +386 7 34 60-339, Fax: +386 7 34 60 337
Object: Boufarik SCGT 750 MW power plant
Location: Algeria, Boufarik
DN: P-011209
POS: GT Batterie facade FTV100 MS 0,8/0,7 A12T1 RAL7035
GT Batterie roof SNV100 TS 0,85/0,85 A12T1 RAL7035
Made by:
Date: October, 2014 Primo Kozlevar, BSc
SCREW CALCULACTION

Ineniring in proizvodnja montanih objektov
Prijatljeva 12, 8210 Trebnje, Slovenija
Phone: +386 7 34 60-339, Fax: +386 7 34 60 337
1.1 Geometry of object
b = 8,3 m lenght of object
d = 4,5 m width of object
h = 4,7 m height of object
= incline of roof
1.2 Location of object
Location of object Boufarik, Ageria
Category of ground I
Elevation: 18 m
1.3 Panels
1.3.1 Wall 1.3.2 Roof
Panel: FTV Panel: SNV
Thickness of external steel sheet: 0,63 mm Thickness of external steel sheet: 0,75 mm washer saddle
Width: 1,0 m Width: 1,0 m
Type of fixing: standard Type of fixing: standard
1.4 Screws
Screw for steel: E19
Screw for concrete:
Thickness of structure-wall: 4 mm or more
Thickness of structure-roof: 4 mm or more
Nrd,w =: 1,80 kN design force - wall (steel structure)
Nrd,w,c =: 0,80 kN design force - wall (concrete structure)
Nrd,r =: 2,33 kN design force - roof
1.5 Wind load
1.4.1 The basic wind velocity
v
b,0
= 25,0 m/s the fundamental value of the basic wind velocity
C
dir
= 1,0 the directional factor
C
season
= 1,0 the season factor
v
b
= x C
season
x v
b,0
= 25 m/s
1.4.2 The basic velocity pressure
= 1,2 kg/m
3
the air density
q
b
=0,5 x x v
b
2
= 375 kg/ms
2
1.4.3 The mean wind velocity
z = h = 4,7 m a height above the terrain
C
0
(z) = 1,00 the roughness factor
C
r
(z) =
1,044 the orography factor
k
r
x ln ( z ) za z
min
z z
max
C
r
(z) = z
0
C
r
(z
min
) za z z
min
k
r
= 0,19 x ( z
0 )
0.07
= 0,170
the terrain factor
z
0,II
z
min
= 1,00 m z
max
= 200,0 m
z
0
= 0,01 m z
0,II
= 0,05 m
v
m
(z) =(z) x C
0
(z)

x v
b
= 26,11 m/s
1.4.4 The peak velocity pressure
z
e
= h = 4,7 m the reference height
C
e
(z
e
) = 2,33 the exposure factor
C
e
(z
e
) =[1+7 x l
v
(z
e
)] x Cr
2
(z) x C
0
2
(z)
l
v
(z
e
) = 0,163 the turbulence intensity
k
l
za z
min
z
e
z
max
l
v
(z
e
) = C
0
(z
e
) x ln (z
e
/z
0
)
l
v
(z
min
) za z
e
z
min
k
l
= 1,0 the turbulence factor
q
p
(z
e
) = C
e
(z
e
) x q
b
= 0,87
kN/m
2
4
,
5
8,3
ground plan
EJOT JT3-12-5,5xL