Download as rtf, pdf, or txt
Download as rtf, pdf, or txt
You are on page 1of 2

TRAINING PROGRESS REPORT (TPR)

Date: 16
th
July 2014 to 24
th
July 2014
EMP : EM 458 Name of the training :
Departent
: Transport / Highway Date of the training :
Weeks
No Pro!e"t Name Assignment# Progress Ne$ %esson %earnt Remark
Week No. 1
General
Introduction with lab mates
How to access Serer !olders
International reports"##STH$ and %uwait & %'( )
'esigning o! the !le*ible
paement in accordance
with ##SHT$
#ccessing documents and
reports on the serer o!
Systra
16
th
July to
24
th
July
Shei+h ,aber #l #hmed #l Sabah
-auseway (ro.ect
"%uwait (ro.ect)
/asic aim and layout o! causeway pro.ect
%uwait city to subiyah main bridge
including two arti!icial islands
Shuwai+h (ort Interchange
Gha0ali Street interchange
Subiyah Interchange
Tra!!ic Model and population !orecast o! %uwait city and
sel!&containment city o! Subiyah
'oha lin+ re1uirement
2pgrade o! Gha0ali street
/asic aim o! the %uwait
(ro.ect3 isual appearance
o! the oerall bridge
(ossible upgrades !or
tra!!ic management within
%uwait -ity
'ocument III4534 3 #denda 6 5
%uwait 'esign Manual3 !or asphalt paements in
arid and hot climate
'esign analysis report"'4#474) submitted by Systra
in March 89:4
Stage 8# -oncept and Tender 'esign
'esigning o! !le*ible
paement in accordance
with %uwait 'esign
Manual
'eeloped a code in e*cel sheet to design a !le*ible
paement in accordance with ##SHT$ and %'(
7oad Sa!ety /arrier 'etailed 'esign 7eport and
drawings"7#:49&88&7$E)
'eeloped an e*cel !ile !or
the design o! !le*ible
paement "##SHT$)

You might also like