Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

APPENDIX C: PRE-SAILING CHECKLIST FOR TOW

Project: Departure Date:


Towing Vessel: Tow:
Tow
Superintendent:
Tow Engineers:
Departing From: Destination:
1. PRE-SAILING CHECKLIST
1.1. All valves are closed including sea valves
1.2. Starting atteries s!ut o""
1.#. Fuel valves closed
1.$. %avigation lig!ts installed& atteries topped up& uls c!ec'ed and all are wor'ing
1.(. )arpin * "is!plate s!ac'les c!ec'ed
1.+. Fis!plate s!ac'le c!ec'ed
1.,. -!ec' emergenc. towline
a/ Securel. clipped and in place
/ S!ac'les 01
c/ Float line in place and clear
1.2. Sailing Dra"t Fwd: A"t:
1.3. Anc!or stowed and secured
1.14. 5ooring lines stowed and secured
1.11. 6atertig!t doors closed 7loc'ed w!ere applicale/
1.12. Portlig!ts closed and loc'ed
1.1#. Ventilators closed
1.1$. Emergenc. access loc'ed
1.1(. Sea"astening installed as per drawings
1.1+. Spare sea"astenings& criing& stanc!ions and ot!er arge materials sa"el. stowed
and secured
1.1,. -ontact details provided to tug
1.12. Emergenc. operation procedures reviewed wit! tug
1.13. 8ridle retrieval line slac'ed and winc! set "or sea
1.24. Searc! completed "or drugs9stowawa.s
1.21. Food and ot!er peris!ales removed
1.22. :arage removed
1.2#. 8arge documents !anded over to tug
1.2$. ;eviewed destination9routing wit! 5aster o" tug
$
t!
Edition ;evision 1& 1+ %ov 2443& Aut!orised . DPA
1.2(. ;eceived cop. o" 6arrant. Surve.or<s =Trip and Tow -erti"icate>
1.2+. Too' pictures o" cargo9arge prior to departing
2. BALLAST WATER
Port ?uantit. Staroard ?uantit.
3. FO Onboard
cu5
4. Additional Co!nt"
$
t!
Edition ;evision 1& 1+ %ov 2443& Aut!orised . DPA

You might also like