DAKSHIN HARYANA BIJLI VITRAN NIGAM

Instruction No.- 11 /2006/PD&C


From

The Chief Engineer/PD&C,
(Plg. & Design), DHBVN, Hisar.
To

The Chief Engineer (OP),
DHBVNL, Delhi.

Memo No.Ch- 28/DD-169 Dated : 27.07.2006


Sub : Conversion of L.T. Distribution System into HVDS system under
Operation Circle, Narnaul - Pilot Project.


The Nigam intends to convert LT Distribution System to HVD System.
A pilot project is required to be carried out to study the pros and cons of HVD System
before final implementation.
11 kV Seka feeder, falling under Operation Division, Narnaul, has
been selected for the conversion of L.T. Distribution system into HVD System as
Pilot Project.
The HVD System shall be laid on Rajasthan Model Project by
providing Single phase 11/0.440 kV DTs.
The work shall be got carried out through the registered /enlisted
contractor of Rajasthan on the same rates of labour, terms and conditions of AVVN
Khetri as labour rates.
The total cost of the project shall be restricted to Rs. Thirty Lacs only.
This issues with the approval of Whole Time Directors of DHBVNL.



Chief Engineer/PD&C,
DHBVN, Hisar.

Copy to the :

1. SPS to M.D., DHBVNL, Hisar for kind information of the M.D. please.
2. SPS to Director /Projects/(OP), DHBVNL, Hisar for kind information of
the Directors please..
3. Chief Engineer (MM), DHBVNL, Hisar
4. S.E., Operation Circle, DHBVNL, Narnaul.