OIM / BARGE MASTER DAILY CHECKLIST

PREPARE NON ESSENTIAL PERSONNEL LIST (to be agreed with


Company drilling supervisor)

HOLD MORNING MEETING

OBTAIN COPY OF DAILY WORK INSTRUCTION AND POST

VERIFY DAYS SINCE LAST BOP TEST

VERIFY DAYS SINCE LAST H2S DRILL

VERIFY DAYS SINCE LAST FIRE DRILL

VERIFY DAYS SINCE LAST ABANDON RIG DRILL

VERIFY SUPPLY VESSEL SCHEDULE

VERIFY THIRD PARTY HP COMPLIANCE & PERFORMANCE

VERIFY WEEKLY H2S AND COMBUSTABLE GAS SENSOR TEST

VERIFY MINIMUM STOCKS AND REQUIREMENTS

(HP section)

Cement
(MT)

Barite
(MT)

Actual
Mini Level
Requirement
On board
supply boat
Comments
Problems / Recommendations
Name/ Date/ Signature

Mud
volume(m3)

Drill water
(m3)

Glycol
(litre)

Base oil
(m3)

SENIOR TOOLPUSHER HPHT DAILY CHECKLIST


Prepare daily work instructions
Hold operational pre-tour briefing with drill crew + service
company personnel on shift.

Check hole volume work-sheet

Obtain slug calculations from mud engineer

OBTAIN FROM Company drilling supervisor

kick tolerance calculations

Current swab and surge calculations

ECD at bit and shoe

Pipe speed limitations

ROP limitations
OBTAIN FROM MUD LOGGERS
Current gas trend
VERIFY

All instruments and chart recorders calibrated

Verify cross checking of mud logging and driller instrumentation

Choke usage log & BOP usage log up to date

Hours since last choke inspection

Days since last BOP test

Days since last BOP function test

Days since last wear bushing inspection

Days since last gas detection calibration

Days since last mud measurement system calibration

Days since last check of MGS


Hours since last Top Drive service
Hours since Swivel Packing changed
Comments
Problems / Recommendations
Name/ Date/ Signature

DRILLER HPHT CHECKLIST EACH TOUR

Check line up of choke manifold


Check Well can be Safely Shut in
Check active volume alarms
Pump through choke and kill lines
Complete new hole volume work sheet
Take SCR as soon as safely possible, update kill sheet
Note wind direction and designate over board line
Have and fill out drilling parameters sheet every 30 min
Review rams space out and shut in procedure
Function test all safety valves (Kelly TDS and Stab in)

OBTAIN FROM MUD LOGGERS


Agree/Record all daily losses/gain (carry over daily)
Agree on volume in all mud pits
Lag time
Position of connection gas in the annulus
Position of Trip gas flow check gas in the annulus
OBTAIN FROM Company drilling supervisor / Contractor Tool pusher
kick tolerance calculations
Current swab and surge calculations
ECD at bit and shoe
Pipe speed limitations
ROP limitations
OBTAIN FROM Mud engineer
Mixing or transfer instructions
Slug calculations
Confirmation last trip volumes are available
OBTAIN FROM AD and derrick man
HP check list (ensure they have fully complied with their check list)
NOTE all aspects of the following have been dealt with:
Kick assembly
Safety valves, darts
Choke manifold
MGS
Active mud volume requirement
Minimum stocks
Degasser
Barite System

Comments
Problems / Recommendations

Name/ Date/ Signature

ASSISTANT DRILLER HP CHECKLIST EACH TOUR


Function test both remote operated auto chokes
Check choke manifold valves are aligned correctly
Check choke manifold equipped w/ Lo-pressure gauges
Verify amount and accessibility of glycol
Verify MGS U tube is flushed and full after each use
Check trip tank is half full
Verify dropping dart passes through both valves and all tubular
Verify minimum ID of Tool string
Verify Drop In Dart location (dog house) and condition
Verify 15K Kelly cocks, Gray valves and associated XO are
operational
Verify Kick assembly accessibility
Verify Drill Pipe tally and count
Run Degasser
Verify shakers being attended by responsible person
Up date BOP and choke usage log
Up date BHA rotating hours
Copy of drilling parameter log in rig files
Verify Koomey unit is in running order. Check gauge reading in dog
house.
Monitor and record annulus well pressure.
Comments

Problems / Recommendations
Name/ Date/ Signature

DERRICK MAN HP CHECKLIST EACH TOUR

Verify surge tanks topped up with barite

Verify mud balance have been checked and calibrated

Purge Bulk transfer lines

Check and set all pit level markers

Verify total mud volume on surface (active, reserve & kill mud) exceeds
250m3, clear with mud loggers.

Calculate Total Active System =.m3

Verify with mud engineer sufficient mud chemicals are available to build
150m3 of drilling mud.

Verify LCM stocks are accessible in sack store and exceed 5 MT

Verify all mud mix systems are operative

Agree optimum mud slug parameters from Driller / Mud engineer

Obtain mixing / transfer instructions from mud engineer (clear with


driller)

Obtain from mud engineer Barite tonnage required to raise active mud
by 0.1 SG

Calculate total active volume at + 0.1SG

Comments
Problems / Recommendations
Name/ Date/ Signature

CEMENTING OPERATOR HPHT DAILY CHECKLIST


Daily checks
Check that Fuel tank is full
Check all oil levels
Check all down hole & surface tools are on board (RTTS packer)
and take inventory
Check cement vent
Check cement and chemicals are sufficient to set 3 x 200m long
cement plugs
Take inventory of all chemicals & check against minimum stock
requirement
Weekly Checks
Pressure test unit
Check spares against inventory.
Make sure cement has been fluffed up
Check barites supply to cement unit
Is weekly maintenance audit complete
Material requirement (safety stock only)
Material
Slurry
Spacer

Cement volumes
Cement tank 1
..MT
Cement type
Comments
Problems / Recommendations
Name/ Date/ Signature

Min required

Cement tank 2
Cement tank

On board
stock

.MT

MUD ENGINEER HPHT DAILY CHECKLIST


Material Check list
Material
Accessible

Amount on board

Amount required

Note: Amount of materials required is the amount sufficient to rebuilt


150m3 of active mud.
Kill mud weightSG
Premix weight..SG

Kill mud volumem3


Premix volume. m3

Record mud volume: Agree with derrick man and mud loggers

Pilot testing completed

Ensure mixing / transfer / slug information clear to all relevant


personnel

Verify mud balances have been checked for calibration

Calculate swab, surge and hydraulics using VIRTUAL HYDRAULICS


soft ware and inform Company drilling supervisor

Verify oil show in cuttings

Verify Shaker screens optimised

Verified stock and compare with minimum stock levels

Verify barite lines have been tested

What is the maximum volume of mud that can be mixed with the
chemical on boardm3

Comments
Problems / Recommendations
Name/ Date/ Signature

MUD LOGGING HPHT DAILY CHECKLIST


Complete new hole volume work sheet
Driller provided with all relevant information
OBTAIN FROM Company drilling supervisor

kick tolerance calculations


Current swab and surge calculations
ECD at bit and shoe
Pipe speed limitations
ROP limitation

Check limits on all monitored systems


Carry out flow meter checks
Follow position of any gas in annulus (Pump off, Drilled gas, Trip
gasetc)
Monitor trend in gas levels (BGG, Drilled Gas, Trip Gas)
Monitor flow line temperature and trend
Check that drillers instrument cross checked with mud loggers
Monitor days since last major gauge calibration
Monitor days since last calibration check of gas and H 2S
detection system.
Is weekly maintenance audit complete
Daily ditch magnet recovery.
Recovery.grams
Record total and composition of all shut down, connection and
trip gases to be recorded on morning report
Record 24 hr mud loss/gain and carry over daily. Confirm with
mud engineer and classify gain/losses (seepage, formation,
super-charging)
Note any drilling parameters, D exponent changes
Comments
Problems / Recommendations
Name/ Date/ Signature