60 - HPHT Checklists
60 - HPHT Checklists
(HP section)
Cement
(MT)
Barite
(MT)
Actual
Mini Level
Requirement
On board
supply boat
Comments
Problems / Recommendations
Name/ Date/ Signature
Mud
volume(m3)
Drill water
(m3)
Glycol
(litre)
Base oil
(m3)
ROP limitations
OBTAIN FROM MUD LOGGERS
Current gas trend
VERIFY
Comments
Problems / Recommendations
Problems / Recommendations
Name/ Date/ Signature
Verify total mud volume on surface (active, reserve & kill mud) exceeds
250m3, clear with mud loggers.
Verify with mud engineer sufficient mud chemicals are available to build
150m3 of drilling mud.
Obtain from mud engineer Barite tonnage required to raise active mud
by 0.1 SG
Comments
Problems / Recommendations
Name/ Date/ Signature
Cement volumes
Cement tank 1
..MT
Cement type
Comments
Problems / Recommendations
Name/ Date/ Signature
Min required
Cement tank 2
Cement tank
On board
stock
.MT
Amount on board
Amount required
Record mud volume: Agree with derrick man and mud loggers
What is the maximum volume of mud that can be mixed with the
chemical on boardm3
Comments
Problems / Recommendations
Name/ Date/ Signature