Form 1B-Works Program
Form 1B-Works Program
Week Number
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
1
2
3
4
5
6
RI 1
RI 2
RI 3
Construct trapezoidal earth drain at locations as directed by MID engineer as per specification.
Location in appendix.
Supply, place and compact coronous material to fill potholes and to form and reshape existing
road as where directed by MID Officer. Locations in Appendix.
Clear Inlets and Outlets, desilt and unblock culvert at Ch 2.088 and Ch 2.154 (Lata Mbanyo Road)
RI 4
RI 5
RM 1
RM 2
RM 4
De-silting Culverts and Clearing/ Cleaning Inlets and Outlets (2 times/yr) Ch 01+600, Ch 01+800,
Ch 01+880, Ch 01+920, Ch 04+110, Ch 04+700, Ch 05+000
Clear side drain, catch water & mitre drain (2 times a year)
RM 5
RM 6
RM 3
Company / Group /
Business Name:
Signature:
Name of Signatory:
Date: