11.Make the Load MCCB (800A) ON. Power will flow to DG Incomer-1.
12. Go to the Panel room and ON the DG-1 Incomer (630A) MCCB.The R,
Y, B indicators of ACB-1 will glow. Now the Feeder-1 is charged with DG
power supply. Checks the voltages and if it is OK then give Loads.
Similar procedure should be adopted for DG-2.
First ensure that the Grid indicators glow and WESCO power came.
Disconnect the major loads on DG.
Make the DG Incomer OFF (630A) MCCB.
Go to the DG and make the Load MCCB (800A) inside DG OFF. Let the
DG to run in no-load for 5minutes.
5- In the mean time come to the control room and put the CASTELL key
inside ACB and make the ACB CLOSED. The R, Y, B indicators again
glow.
6- Switch on the loads.
7- Come to the DG and stop the DG by pressing the RED button STOP on
the manual DG control panel. OFF the DC ON SS1 switch.
I understood the above procedures for changeover and can operate the