Scope of Work for the Antipinski Refinery
project:
ELOU AT-3
Site V1
Sulfur production unit
Site V1
Hydrogen production unit Site V1
Hydrocracker
Site V1
Antipinski Refinery
Antipinski Refinery
Antipinski Refinery
Antipinski Refinery
Excavator
11
Bulldozer
Motor grader
Pipelayer
Vibrorollers
Backhoe loader
Telescopic loader
Front-end loader
13
Vacuum truck
Mobile crane
72
31
21
Truck
Long-length trailer
Dumptruck
Truck mixer
Automobile tank
65
Compressor
15
Hydraulic hammer
Diesel Generator
310
180
Total
786
Antipinski Refinery
Tobolsk project (full scope of work)
vs
from March 2012 till September 2013).
Tobolsk
Antipinski refinery
From
Till
Duration
(months)
% (Antipinski vs Tobolsk)
Concrete works
70,000.00m
73,700.00m
March 2012
September 2013
18
+5
Pile driving
140,00.00m
180,442.00m
March 2012
May 2013
14
+29
Structural steel
22,000.00t
12,653.00t
June 2012
September 2013
15
-42
Pipe works
12,000.00t
9,120.00t
February 2013
September 2013
-24
2,400,000.00m
308,930.00m
May 2013
September 2013
-87
Work Type
Cable
If we summarize the scope of work finished during 18 months in Antipinski refinery and
compare with the scope of works for the Tobolsk project, OOO Velesstroy are confident
that the Tobolsk project could be finished within period of 2 to maximum 2,5 years