ANTIPINSKI REFINERY

TOBOLSK-POLYPROPYLENE

JUMEN

Antipinski Refinery

Antipinski Refinery
Scope of Work for the Antipinski Refinery
project:
ELOU AT-3
Site V1
Sulfur production unit
Site V1
Hydrogen production unit Site V1
Hydrocracker
Site V1

Tank Farm Site V3 & V4

Tank farm - 8 tanks of 10.000m

Water cleaning facilities for physical-andchemical treatment process

Antipinski Refinery

Antipinski Refinery

Antipinski Refinery

Antipinski Refinery

Manpower and Machinery Structure on 27.09.2013.


Equipment in use
Machinery

Manpower at Antipinski Refinery


Number of
Job
Employees
123
Technical staff
600
Civil workers
200
Mechanical workers
90
Welders for construction
420
Pipe fitters
205
Pipe welders
150
Insulation fitters
40
Heating and ventilation
30
Water Supply and Sewerage
200
Electrical technicians
Instrumentation and
200
Automation
219
Production of steel structures
110
Administrative personnel
118
Service staff
2705
Total

Excavator

11

Bulldozer

Motor grader

Pipelayer
Vibrorollers

Backhoe loader

Telescopic loader

Front-end loader

13

Vacuum truck

Mobile crane

72

Truck mounted hydraulic lift

31

Truck with crane

21

Truck

Long-length trailer

Dumptruck

Truck mixer

Automobile tank

Passenger transport vehicles

65

Truck Mounted Concrete Pump

Hydrostatic testing unit (laboratory)

Compressor

15

Aerial work platform

Hydraulic hammer

Diesel Generator

Welding equipment - Lincoln

310

Welding equipment - other

180

Total

786

Antipinski Refinery
Tobolsk project (full scope of work)
vs
from March 2012 till September 2013).

Antipinski Refinery project (finished works

Tobolsk

Antipinski refinery

From

Till

Duration
(months)

% (Antipinski vs Tobolsk)

Concrete works

70,000.00m

73,700.00m

March 2012

September 2013

18

+5

Pile driving

140,00.00m

180,442.00m

March 2012

May 2013

14

+29

Structural steel

22,000.00t

12,653.00t

June 2012

September 2013

15

-42

Pipe works

12,000.00t

9,120.00t

February 2013

September 2013

-24

2,400,000.00m

308,930.00m

May 2013

September 2013

-87

Work Type

Cable

If we summarize the scope of work finished during 18 months in Antipinski refinery and
compare with the scope of works for the Tobolsk project, OOO Velesstroy are confident

that the Tobolsk project could be finished within period of 2 to maximum 2,5 years