Scope of Sub Contractor External Plaster Work

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

K.G.

N
DATE: 03/05/13
Scope Of Sub Contractor
External Plaster Work
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.

External stageing for plastering, fixing & removing .


Bardan fixing & removing.
Famping & cleaning.
Fully curing.
Sanda & chicken mark.
Chatkam.
Putting string from top to bottom & button at every 6feet intervals.
Fully curing.
Every 5th floor interval the stageing in for loose material & also remove & utilized at the dame
time.
Self lifting of material as sand & cement .
1st coat.
String & button , curing.
2nd coat with flikar machine.
4 days curing.
Removing of external stageing & also do repair if required.
Self operator & diesel for lifting.

Role Main Contractor


Aranging
1.
2.
3.
4.

Bamboos & kahta.


Light & water.
Bardans & water pipe.
Lift.

NOTE:
Do not wastge of excess materials, contractor shall be compulsary at site during working hours.
Works shall be done under safty precaution.