REACTION ON PILE FOR R.C.

C RETAINING WALL OF RAMP


HT.ABOVE GROUND
3.7 m
HT.BELOW GROUND
0.65 m
Ka
0.333333
Ws
20 KN/m2
Ys
17.5 KN/m2
Kp
3
TOP THK. OF WALL
0.25 M
BOT.THK OF WALL
0.5 M
THK.OF CAP
0.5 M
WIDTH OF CAP
2.79 M
SPACING OF PILES IN LONG. DIRECTION
1 M
Total ht.
4.35
DIST
LATERAL LOAD
ACTIVE FORCE DUE TO SURCHARGE
29.00 KN
2.18
ACTIVE FORCE DUE TO EARTH PRESSURE
55.19 KN
1.45
VERTICAL LOAD
1.WALL 1
2. WALL 2
3.PILE CAP
4.BACK FILL 1
5.BACK FILL 2
6.SURCHARGE

24.06
12.03
34.88
8.42
154.29
48.30

KN
KN
KN
KN
KN
KN

281.98 KN/1M
PASSIVE FORCE
C.G OF VERTICAL LOAD FROM TOE
ECCENTRICITY
MOMENT ON PILE
VERTICAL LOAD/PILE
LATERAL LOAD ON PILE

11.09063 KN/1M
0.8603 M
0.535 M
148.3625 KN-M/1M
239.90
23.99
36.55
3.66

KN/1M
tn/1M
KN/1M
tn/1M

0.125
0.333333
1.395
0.333333
1.645
1.52

Mo
63.075 KN-M
80.026 KN-M
143.10 KN-M/1M
3.01
4.01
48.65
2.81
253.80
73.42
385.70 KN-M/1M

REACTION ON PILE FOR R.C.C RETAINING WALL OF RAMP


HT.ABOVE GROUND
2.53 m
HT.BELOW GROUND
0.65 m
Ka
0.333333
Ws
0 KN/m2
Ys
17.5 KN/m2
Kp
3
TOP THK. OF WALL
0.2 M
BOT.THK OF WALL
0.35 M
THK.OF CAP
0.5 M
WIDTH OF CAP
2.2 M
SPACING OF PILES IN LONG. DIRECTION
1M
Total ht.
3.18
DIST
LATERAL LOAD
ACTIVE FORCE DUE TO SURCHARGE
0.00 KN
1.59
ACTIVE FORCE DUE TO EARTH PRESSURE
29.49 KN
1.06
VERTICAL LOAD
1.WALL 1
2. WALL 2
3.PILE CAP
4.BACK FILL 1
5.BACK FILL 2
6.SURCHARGE

13.40
5.03
27.50
3.52
86.77
0.00

KN
KN
KN
KN
KN
KN

136.21 KN/1M
PASSIVE FORCE
C.G OF VERTICAL LOAD FROM TOE
ECCENTRICITY
MOMENT ON PILE
VERTICAL LOAD/PILE
LATERAL LOAD ON PILE

11.09063 KN/1M
0.8303 M
0.270 M
34.33845 KN-M/1M
91.00
9.10
9.20
0.92

KN/1M
tn/1M
KN/1M
tn/1M

0.1
0.25
1.1
0.25
1.275
1.2

AMP

Mo
0.000 KN-M
31.264 KN-M
31.26 KN-M/1M
1.34
1.26
30.25
0.88
110.63
0.00
144.35 KN-M/1M

REACTION ON PILE FOR R.C.C RETAINING WALL OF RAMP


HT.ABOVE GROUND
3.7 m
HT.BELOW GROUND
0.15 m
Ka
0.333333
Ws
20 KN/m2
Ys
17.5 KN/m2
Kp
3
TOP THK. OF WALL
0.2 M
BOT.THK OF WALL
0.4 M
THK.OF CAP
0.5 M
WIDTH OF CAP
2.79 M
SPACING OF PILES IN LONG. DIRECTION
1 M
Total ht.
3.85
DIST
LATERAL LOAD
ACTIVE FORCE DUE TO SURCHARGE
25.67 KN
1.93
ACTIVE FORCE DUE TO EARTH PRESSURE
43.23 KN
1.28
VERTICAL LOAD
1.WALL 1
2. WALL 2
3.PILE CAP
4.BACK FILL 1
5.BACK FILL 2
6.SURCHARGE

16.75
8.38
34.88
5.86
140.11
49.80

KN
KN
KN
KN
KN
KN

255.78 KN/1M
PASSIVE FORCE
C.G OF VERTICAL LOAD FROM TOE
ECCENTRICITY
MOMENT ON PILE
VERTICAL LOAD/PILE
LATERAL LOAD ON PILE

0.590625 KN/1M
0.9663 M
0.429 M
109.6134 KN-M/1M
200.96
20.10
34.15
3.42

KN/1M
tn/1M
KN/1M
tn/1M

0.1
0.266667
1.395
0.266667
1.595
1.495

Mo
49.408 KN-M
55.481 KN-M
104.89 KN-M/1M
1.68
2.23
48.65
1.56
223.48
74.45
352.05 KN-M/1M