6) Vent Connection Shall Be With Blinded

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1)Vendor to kindly furnish the welding details (Base plate shall

be welded to beam structure)so that our QC can check the


same and recommend the applicable WPS
2)Vendor shall recommend the minimum straight length
requirements at suction side.
3)Ensure Insulating Gaskets for the Casing Vent and Drain
Piping Isometrics as skid drain and vent piping material is
Duplex Stainless Steel.
4)Vendor shall furnish the static & Dynamic loads
5)Show the lifting lug location for pump & motor.

6)Vent connection
shall be with
blinded
Vent shall be neatly
terminated near the
base plate to avoid
splashing/stray jets.

7)Vendor shall
ensure that proper
support is provided
for all vent & drain
connections

11)Drip pans shall have


a minimum slope of
10mm/1m

125mm

ADMA Comments in
green background.
Vendors proposal
exceeds minimum reqmt.
JRM to check the
comment.

8)Include Pump
rotor assembly
weight

10)1489 as per
motor data sheet

9)Include safety
execution for
terminal box.
N.m

As per this note, JRM to ensure that allowable nozzle loads are within Table-4 of API 610. Vendor has not allowed the use of
twice nozzle loads for piping design.
Vendor to only give those loads in the drawing which are to be used by piping. After the application of such piping loads the
coupling misalignment shall be within the limits of Cl. 6.3.5 of API 610 and Table 12 (base plates not intended for grouting).
Casing support and baseplate shall also be designed accordingly. Pipe load test results to be provided in case higher loads