6) Vent Connection Shall Be With Blinded
6) Vent Connection Shall Be With Blinded
6) Vent Connection Shall Be With Blinded
6)Vent connection
shall be with
blinded
Vent shall be neatly
terminated near the
base plate to avoid
splashing/stray jets.
7)Vendor shall
ensure that proper
support is provided
for all vent & drain
connections
125mm
ADMA Comments in
green background.
Vendors proposal
exceeds minimum reqmt.
JRM to check the
comment.
8)Include Pump
rotor assembly
weight
10)1489 as per
motor data sheet
9)Include safety
execution for
terminal box.
N.m
As per this note, JRM to ensure that allowable nozzle loads are within Table-4 of API 610. Vendor has not allowed the use of
twice nozzle loads for piping design.
Vendor to only give those loads in the drawing which are to be used by piping. After the application of such piping loads the
coupling misalignment shall be within the limits of Cl. 6.3.5 of API 610 and Table 12 (base plates not intended for grouting).
Casing support and baseplate shall also be designed accordingly. Pipe load test results to be provided in case higher loads
are offered by the vendor.
2
ZCSC / ZWSC