TIME STUDY

Sno.
Present
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Activity

Observed Time (Seconds)


Cycle 1 Cycle 2 Cycle 3
Cycle 4

Cycle 5

Removed the Jig


Removed the job
Picked new job and placed
Placed the jig on new job
Bolted Jig over new job
Picked up the Drilling macine 1
Drilling process 1
Changed the drilling bit
Put back the drilling machine 1
Drilling machine 2 picked
Drilling process 2
Put back the drilling machine 2
Unbolted the jig
Removed the Jig

1.26
2.14
3.23
1.92
15.71
2.20
17.80

1.14
2.06
7.76
1.79
13.56
2.77
22.58
15.20
2.45
2.66
10.56
3.45
5.16
1.22

1.15
2.15
3.25
1.92
15.62
2.19
17.86

Picked up the Drilling macine 1


Drilling process 1
Changed the drilling bit
Put back the drilling machine 1
Drilling machine 2 picked
Drilling process 2
Put back the drilling machine 2

2.20
17.80

2.77
22.58
15.20
2.45
2.66
10.56
3.45

2.19
17.86

3.14
3.93
11.20
4.10
4.72
1.11

1.15
2.10
7.70
1.70
13.60
2.70
22.50
15.00
2.50
2.70
10.60
3.50
5.10
1.20

1.17
2.08
3.30
1.92
15.50
2.18
17.88

2.70
22.50
15.00
2.50
2.70
10.60
3.50

2.18
17.88

3.08
3.79
11.12
4.01
4.80
1.15

3.11
3.87
11.25
4.08
4.77
1.10

Proposed
1
2
3
4
5
6
7

3.14
3.93
11.20
4.10

3.08
3.79
11.12
4.01

3.11
3.87
11.25
4.08

Note: Initially for the shift the set up time of the job will be take

STUDY
Rating Factor Normal Time Allowance Standard time
Average Time
1.17
2.11
5.05
1.85
14.80
2.41
19.72
15.10
2.86
3.39
10.95
3.83
4.91
1.16

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

1.17
2.11
5.05
1.85
14.80
2.41
19.72
15.10
2.86
3.39
10.95
3.83
4.91
1.16

0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
Total Time

1.94
3.47
8.33
3.05
24.42
3.97
32.54
24.92
4.71
5.59
18.06
6.32
8.10
1.91
147.34

2.41
19.72
15.10
2.86
3.39
10.95
3.83

100.00
100.00
100.00
100.00
100.00
100.00
100.00

2.41
19.72
15.10
2.86
3.39
10.95
3.83

0.95
0.95
0.95
0.95
0.95
0.95
0.95
Total Time

3.97
32.54
24.92
4.71
5.59
18.06
6.32
96.12

e set up time of the job will be taken. This will not be taken in the cycle time.