Time Study: Sno. Activity Observed Time (Seconds)
Time Study: Sno. Activity Observed Time (Seconds)
Time Study: Sno. Activity Observed Time (Seconds)
Sno.
Present
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Activity
Cycle 5
1.26
2.14
3.23
1.92
15.71
2.20
17.80
1.14
2.06
7.76
1.79
13.56
2.77
22.58
15.20
2.45
2.66
10.56
3.45
5.16
1.22
1.15
2.15
3.25
1.92
15.62
2.19
17.86
2.20
17.80
2.77
22.58
15.20
2.45
2.66
10.56
3.45
2.19
17.86
3.14
3.93
11.20
4.10
4.72
1.11
1.15
2.10
7.70
1.70
13.60
2.70
22.50
15.00
2.50
2.70
10.60
3.50
5.10
1.20
1.17
2.08
3.30
1.92
15.50
2.18
17.88
2.70
22.50
15.00
2.50
2.70
10.60
3.50
2.18
17.88
3.08
3.79
11.12
4.01
4.80
1.15
3.11
3.87
11.25
4.08
4.77
1.10
Proposed
1
2
3
4
5
6
7
3.14
3.93
11.20
4.10
3.08
3.79
11.12
4.01
3.11
3.87
11.25
4.08
Note: Initially for the shift the set up time of the job will be take
STUDY
Rating Factor Normal Time Allowance Standard time
Average Time
1.17
2.11
5.05
1.85
14.80
2.41
19.72
15.10
2.86
3.39
10.95
3.83
4.91
1.16
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
1.17
2.11
5.05
1.85
14.80
2.41
19.72
15.10
2.86
3.39
10.95
3.83
4.91
1.16
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
0.95
Total Time
1.94
3.47
8.33
3.05
24.42
3.97
32.54
24.92
4.71
5.59
18.06
6.32
8.10
1.91
147.34
2.41
19.72
15.10
2.86
3.39
10.95
3.83
100.00
100.00
100.00
100.00
100.00
100.00
100.00
2.41
19.72
15.10
2.86
3.39
10.95
3.83
0.95
0.95
0.95
0.95
0.95
0.95
0.95
Total Time
3.97
32.54
24.92
4.71
5.59
18.06
6.32
96.12
e set up time of the job will be taken. This will not be taken in the cycle time.