Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

FLAT BED - HEAT PRESS PREVENTIVE MAINTENANCE SCHEDULE

(Based on 40 hour week)


ITEM
Air Line Filter

INSPECTION
Check For Condensation
Accumulation
Check For Cleanliness

FREQUENCY
Daily

ACTION
Drain Filter Bowl As Required

Daily

Clean Probes As Necessary

Proper Checking
Proper Cleaning

Daily
Daily

Check for Level of water for process


Clean machines necessarily

Check For Proper


Calibration
Test Photo-Eye And
Regulators For Proper
Operation
Cleanliness/Housekeeping
Proper Cleaning
Proper Checking
Cleanliness/Housekeeping

Weekly

Check Process Value With Temperature Stripes.


Recalibrate As Required
Adjust Settings For Photo-Eye And/or Regulators If
Needed.

Thermocouple
Probes

Functional Check

Quarterly

Motor

Brushes

Quarterly

Tables
Press Steam Pipe

Proper Positioning
Check Properly

Quarterly
Quaterly

Thermocouple
Probes
Water Level
Cleaning of
Machine
Temperature
Controllers
Tracking

General
Steam Tank Clean
Safety Valve Check
General

Weekly

Weekly
Weekly
15 Days
Monthly

Clean On And Around The Machine


Water should be clean
Remove al the dust materials
Remove The Top Two Covers And Two Side Covers. Clean
Any Accumulated Debris Using A Compressed Air Gun.
Remove Thermocouple Probes. Clean And Polish Tips.
Reinstall And Adjust As Necessary. (Approx. 3/16
Required For Tip Compression Past Contract With
Drums)Recalibrate Temperature Controller As Necessary.
Visually Inspect Motor Brushes For Wear And Replace If
Necessary
Check For Leveling And Placement
Checking the pipes regularly

Suction
Functioning

Functional Cheching

Quaterly

Checking should be done regularly

You might also like