Confined Space Equipment and/ or Structure Register - Phase 1

Date Updated:15.10.2012
No.

Name of Equipment/Structure

Date
Inspected

AIR DRYERS (2 NOS) V5000A & V5000B

09-12-12

DIRECT CONTACT AFTER COOLER TW5000

09-12-12

GASEOUS NITROGEN STORAGE TANK(V7300) VESSEL ENTRY

09-12-12

GASEOUS OXYGEN STORAGE TANK (V6200 & V6100)

09-12-12

N2-WATER COOLING TOWER (TW7000)

09-12-12

PRIMARY HEAT EXCHANGER (HX1000)

09-12-12

ENTERY INSIDE THE DIVERFER CHUTE # 6

13/09/2012

ENTRY INSIDE IOP SCREEN 1 & 2

13/09/2012

ENTRY INSIDE OXIDE FINE BIN

13/09/2012

10

ENTRY INSIDE STACKER DISCHARGE CHUTE

13/09/2012

11

ENTRY INSIDE THE TRANSFORMER TOWER 1,2 & 3 (DIVERFER OR DISCHARGE CHUTE)

13/09/2012

12

ABSORBER COLUMN CO2 AREA

09-10-12

13

ACTIVATED CARBON FILTER

09-10-12

14
15

ALL CABLE TRENCHES


Co2-PREPERATION TANK

16

CG QUENCH TOWER

09-10-12

17

COOLER ENTRY

09-10-12

25/07/2012
26/07/2012

Inspected by
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Ade Nche
Ade Nche
Faakhir /
Jaafar
Faakhir /

Specific location

PREPURIFIER U

AIR PRECOOLING

STORAGE TANK

STORAGE TANK

AIR PRECOOLING

PHX & TURB

SCREEN HOU

DRP-1 Co2 AR

DRP-1 Co2 AR

ALL DRP-1 AR
CO2 AREA
COMPRESSOR &
AREA
REACTOR & HY

18

COOLER SURGE BIN ENTRY

09-10-12

19

COOLING GAS (CG) SEPERATOR (VESSEL ENTRY)

09-10-12

20

COOLING GAS AFTER COOLER KOD (VESSEL ENTRY)

09-10-12

21

COOLING GAS KOD (SUCTION)

09-10-12

22

CUMBUSTION AIR FILTER

09-10-12

23

DECARBONATED GAS WASHER

09-10-12

24

DEDUSTING SYSTEMS IN DRP 1

25/07/2012

25

DEPRESSURIZING SCREUBBER (VESSEL ENTRY)

09-10-12

26

EF SURGE BIN ENTRY

09-10-12

27

ENTRY INSIDE DRI SILO (2NOS)

09-10-12

28

ENTRY INSIDE OXIDE DAY BINS (4 NOS)

09-10-12

29

EQUILIZING BIN

09-10-12

31

FH-31,41,51,&72

09-10-12

32

FLARE SEAL PIT

09-06-12

33

HEAT RECUPERATOR ENTRY

09-06-12

34

HY TEMP DEPRESSURISING

09-10-12

35

HY TEMP INTERFACE BIN ENTRY

09-10-12

36

HYTEMP PT SEPERATOR ENTRY

09-10-12

37

IOP (FOUR BINS) ENTRY (4 NOS)

09-10-12

Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Ade Nche
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar

AREA
REACTOR & HY

COMPRESSOR &
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA

REFORMER A

DRP-1 Co2 AR

DRP(1-4) SYST
COMPRESSOR &
AREA
REACTOR & HY
AREA

DRP-MH AR

DRP-MH AR

DRP-MH-AR

DRP-MH AR

REFORMER A
REACTOR & HY
AREA
REACTOR & HY
AREA
REACTOR & HY
REACTOR & HY
REACTOR & HY
AREA

38

MM-MECHANICAL DRP-1

39

PG AFTER COOLER KOD (VESSEL ENTERY)

09-10-12

40

PG QUENCH TOWER

09-10-12

41

PP BIN ENTRY

09-10-12

42

PROCESS GAS HEATER(MANHLE ENTRY)

09-10-12

43

PROCESS GAS SEPARATOR (VESSEL ENTRY)

09-10-12

44

PROCESS GAS SUCTION KOD (VESSEL ENTRY)

09-10-12

45
46
47
48
49
50
51
52
53
54
55
56
57

PT GAS KOD (VESSEL ENTRY)


PT GAS QUENCH TOWER (VESSEL ENTRY)
PT GAS SEPARATOR (VESSEL ENTRY)
PT HEATER
REACTOR LOADING BIN ENTRY
REACTOR QWR TANK ENTRY
REBOILER (ENTRY)
REBOILER CONDENSATE DRUM
REFLUX KO DRUM
REFORMER BOX
REFORMER FLUE GAS
SAMPLING BIN SEPARTOR
SOLUTION PREPARATION TANK ENTRY

26/07/2012

09-10-12
09-10-12
09-10-12
09-10-12
09-10-12
09-10-12
09-10-12
09-10-12
09-10-12
09-06-12
09-10-12
09-10-12
09-10-12

Ade Nche
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /

PGH-FD FA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
REACTOR & HY
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
COMPRESSOR &
AREA
REACTOR & HY
AREA
REACTOR & HY
AREA

DRP-1 Co2 AR

DRP-1 Co2 AR

DRP-1 Co2 AR

DRP-1 REFORME

DRP-1 Co2 AR
COMPRESSOR &
AREA
DRP-1 Co2 AR

58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
72
73
74
75

SOLUTION STORAGE TANK (3 NOS) (TANK ENTRY)


STRIPPERS COLUMN
SULPHER OXIDIZER (3 CHANNELS) ENTRY
VESSELS ENTRY RGQT,HYDRO DESULPJURIZERS,DESULPHURIZERDES 1 & 2,DEREATOR,NGKOD & NITROGEN
TANK
ENRY INSIDE MANHOLE OF DRAINAGE WATER CHANNEL OF ROUGHING STRANDS
ENTRY INSIDE DOOR OF DRAINAGE WATER CHANNEL OF FINISHING STRANDS
ENTRY INSIDE ROLLING MILL FURNACE
FURNACE RECUPERATOR
ENTRY INSIDE DOOR OF DRAINAGE WATER CHANNEL OF FINISHING & ROUGHING STRANDS
ENTRY INSIDE REHEATING FURNACE
FURNACE RECUPERATOR
ENTRY INSIDE DOOR OF DRAINAGE WATER CHANNEL OF FINISHING & ROUGHING STRANDS
ENTRY INSIDE REHEATING FURNACE
FURNACE RECUPERATOR

09-10-12
09-10-12
09-10-12
09-06-12
13/09/2012
13/09/2012
13/09/2012
13/09/2012
13/09/2012
13/09/2012
13/09/2012
13/09/2012
13/09/2012
13/09/2012

BAG HOUSE HOOPER

09-11-12

BUNKERS ENTRY (1)

09-11-12

BUNKERS ENTRY (2)

09-11-12

CCM STEAM MAIN DUCT


COLD DRI BUNKERS ENTRY

09-12-12
09-11-12

Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /

DRP-1 Co2 AR

DRP-1 Co2 AR

DRP-1 Co2 AR

REFORMER

GROUND LEV

GROUND LEV

RE-HEATING FU
GROUND LEVE
FURNACE

GROUND LEV

RE-HEATING FU

GROUND LEV

GROUND LEV

RE-HEATING FU

GROUND LEV
FTP

EAF (TOP LEV

LRF(TOPLEV
CCM
EAF/LRF

76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98

COOLING CHAMBER SCALE COLLECTION PIT

09-12-12

FTP MAIN CENTRIFUGAL FAN

09-11-12

FTP STACK ENTRY (CHAMBERS)

09-11-12

HAIR PIN COOLER

09-11-12

LADDLE ROTATION TURRET DRIVE UNIT

09-12-12

LRF BOOSTER FAN

09-11-12

MAIN BEARING HOUSING EAF

09-11-12

PRIMARY & SECONDARY FTP DUCT

09-11-12

SETTLING CHAMBER

09-11-12

SILO OF DOLO & LIME

09-12-12

UDH-01,02 & 03

09-11-12

UNDERGROUND TRENCH ENTRY IN HYDRAULIC ROOM


A10 WTK INDIRECT COOLING WATER SYSTEM
A51WTK DRAIN PIT
C01 WTK DIRECT COOLING WATER SYSTEM STORAGE
C5IWTK PUMPING STATION FOR TRANSFER WATER TO SEDIMENTAION TANK
C10 WTK WATER RESEVIOR FOR PRODUCTION
C51 WSP-SCALE PIT SCALE REMOVING
C51WSP SCALE PIT (SCALE REMOVING)
C52 WTK PUMPING OUT WATER TO CLARIFIER
C81 WTK CLARIFIER TANK
C91 WRK & WTR (CLARIFIER)
C91 WTK RETURN WATER FROM MILL

09-11-12
08-02-12
08-08-12
08-02-12
30/07/2012
25/07/2012
25/07/2012
08-08-12
08-08-12
30/07/2012
08-08-12
25/07/2012

Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Faakhir /
Jaafar
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche
Ade Nche

CCM
FTP
FTP
FTP
CCM
FTP
EAF
FTP
FTP

DOLO LIME CHA


RMH

EAF
RM-2 WTP
RM-2 WTP
RM-2 WTP
RM-2 WTP
WTP AREA
WTP AREA
RM-2 WTP
RM3 WTP
RM-2 WTP
RM-3 WTP
CLARIFIER AR

99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121

CLARIFIER TANK
COOLING TOWER (CONCREATE TANK)
DC 621 TANK (DIRECT COOLING)
E10WTK DCW-DIRECT COOLING WATER SYSTEM

21/08/2012
09-05-12
21/08/2012
08-02-12

ENTRY INSIDE A01,B02,C01 WTK

16/09/2012

ENTRY INSIDE A01.B02.C01 WK

16/09/2012

ENTRY INSIDE A03 & B03 WEM (EMERGENCY TANK)

16/09/2012

ENTRY INSIDE A04 WFS (1 & 2 ) (SAND FILTER)

16/09/2012

ENTRY INSIDE B013 WEV

16/09/2012

ENTRY INSIDE C01 WMX

16/09/2012

ENTRY INSIDE C81 WFS ( 01 2 02) (SAND FILTER)

16/09/2012

ENTRY INSIDE COOLING TOWER A01 - WCT

16/09/2012

ENTRY INSIDE COOLING TOWER A01.C01 WCT

16/09/2012

ENTRY INSIDE F12 WTK

16/09/2012

ENTRY INSIDE F41 WTK(1)

16/09/2012

ENTRY INSIDE F41 WTK

16/09/2012

ENTRY INSIDE G30 WTS (SULPHURIC ACID)

16/09/2012

ENTRY INSIDE THE C51 WTK & C61 WTK


F51 WTK DRAIN PIT
FEED TANK (WATER RESERVIOR) CAPACITY 600
IE TANK 620 (INDIRECT COOLING)
MIXED BED (DESTILIATION WATER) WATER SUPPLY TO DRP
NUTRILIZATION TANK WASTE WATER TANK

16/09/2012
08-02-12
09-05-12
21/05/2012
09-05-12
09-04-12

Ade Nche
Siddique M.
Ade Nche
Ade Nche
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Faakhir &
Jaafar
Ade Nche
Siddique M.
Ade Nche
Siddique M.
Siddique M.

UTILITY RM
RO PLANT
UTILITY RM
WTP-RM3

SMP- WTP

SMP - WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP

DRP WTP
RM-3 WTP
RO PLANT
UTILITY RM
RO PLANT
RO PLANT

122 PIPE CHANNEL AREA


123 PUMP 650 PIT
124

SCALE PIT OPEN TOP (RETURN WTER FROM MILL TO IRON FINE PARTICLES) E51 WHS
125 SEA WATER TANK
126 TANK 675 (FILLER BACK WASH PIT)
127

UTILITY - WTP

21/08/2012
21/08/2012

Ade Nche
Ade Nche

UTILITY RM
UTILITY RM

30/07/2012
21/08/2012
20/08/2012

Ade Nche
Ade Nche
Ade Nche
Faakhir &
Jaafar

RM-2 & RM
UTILITY RM
UTILITY RM

16/09/2012

SMP WTP (NEA

Confined Space Equipment and/ or Structure Register - Phase 2


Date Updated: 04.10.2012
No.
1
2
3
4
5

Name of Equipment/Structure
BAG HOUSE HOOPER
FTP main ID fan#1
FTP main ID fan#2
FTP main ID fan#3
CCM STEAM MAIN DUCT

Date
Inspected
27.09.2012
27.09.2012
27.09.2012
27.09.2012
01.10.2012

Inspected
by
JJ
JJ
JJ
JJ
JJ

EBC-01 Do Lime Charging area

28.09.2012

JJ

Do-Lime Charging Area

SMP

Operation

EBC-01 Ferro-Alloy Charging area

28.09.2012

JJ

Ferro - Alloy Charging Area

SMP

Operation

EBC-01 Carbon Injection Charging area

28.09.2012

JJ

Carbon Injection Charging


Area

SMP

Operation

Primary Water Cooled & Secondary FTP Duct

28.09.2012

JJ

Primary Water Cooled Duct

SMP

Operation

10
11
12

BUNKERS ENTRY (1)


BUNKERS ENTRY (2)
Cold DRI Bins - 4 units

01.10.2012
01.10.2012
01.10.2012

JJ
JJ
JJ

EAF (TOP LEVEL)


LRF (TOP LEVEL)
LRF (TOP LEVEL)

SMP
SMP
SMP

Operation
Operation
Operation

Specific location
FTP
FTP
FTP
FTP
CCM

Department Section
SMP
Operation
SMP
Operation
SMP
Operation
SMP
Operation
SMP
Operation

Remarks

See Photos at p
page
See Photos at p
page
See Photos at p
page
See Photos at p
page

13

COLD DRI BUNKERS ENTRY

01.10.2012

JJ

EAF-LRF

SMP

Operation

14

COOLING CHAMBER SCALE COLLECTION PIT

02.10.2012

JJ

15
16
17
18
19
20
21
22
23
24

FTP MAIN CENTRIFUGAL FAN


FTP STACK ENTRY (CHAMBERS)
HAIR PIN COOLER
LADDLE ROTATION TURRET DRIVE UNIT
LRF BOOSTER FAN
MAIN BEARING HOUSING EAF
SETTLING CHAMBER
SMP Sludge Thickener
UDH-01,02 & 03
UNDERGROUND TRENCH ENTRY IN HYDRAULIC ROOM

02.10.2012
02.10.2012
02.10.2012
02.10.2012
02.10.2012
03.10.2012
03.10.2012
01.10.2012
03.10.2012
03.10.2012

JJ
JJ
JJ
JJ
JJ
JJ
JJ
DM
JJ
JJ

Auxilliary
FTP
FTP
FTP
CCM
FTP
EAF
Settling Chamber near furnace
SMP - WTP
RMH
EAF

SMP

Operation

SMP
SMP
SMP
SMP
SMP
SMP
SMP
SMP
SMP
SMP

Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation

25

XB 15

27.09.2012

JJ

Sea Water Intake

ROP

Utility

26
27
28
29
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

DRP2 WTP CLARIFIER


Reactor
DRI Cooler
A01 WCT 01-02-03
SMP Sludge Thickener
Depressurizing Stuck Scrubber
PT Cooler Separator
Cooling Gas Separator
Pellet Trap Tank
Product Silos
Cable Trenches
PG Quench Tower
PG Knock Out Drum
Cooling Gas Quench Tower
CO2 Absorption Tower
Stripper
Cooling Gas after Cooler K.O Drum
PG after Cooler Knock Out Drum

28.09.2012
29.9.2012
29.9.2012
29.9.2012
01.10.2012
01.10.2012
01.10.2012
01.10.2012
01.10.2012
01.10.2012
01.10.2012
02.10.2012
02.10.2012
02.10.2012
02.10.2012
02.10.2012
02.10.2012
02.10.2012

SA
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM

DRP2 WTP Clarifier bottom


DRP2 Reactor Tower
DRP2 Reactor Tower
DRP WTP
SMP WTP
DRP
DRP
DRP
DRP WTP Clarifier
DRP
Within the Plant
DRP
DRP
DRP
DRP
DRP
DRP
DRP

Utility WTP
DRP
DRP
Utility
Utility
DRP
DRP
DRP
Utility
DRP

Utility
Operation
Operation
Utility
Utility
Operation
Operation
Operation
Utility
Operation

DRP
DRP
DRP
DRP
DRP
DRP
DRP

Operation
Operation
Operation
Operation
Operation
Operation
Operation

Cooling Gas Suction K.O. Drum


PT Quench Tower

02.10.2012
02.10.2012

DM
DM

DRP
DRP

DRP
DRP

Operation
Operation

See Photos at p
page

See Photos at p
page

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

PT Knock Out Drum


PT Heater
Day Bin
Convection Box
Radiation BOx
Stack
Reoxidizing Thermalizer (RTO)
Steam Drum
Deaerator
Demineralized Water
Desulphurizer 1 & 2
Emergency Condenser
Hydro Desulphurizer
Reform Gas Quench Tower
Nitrogen Tank
Natural Gas Knock Out Drum
Instrumentation Air Tank
Reboiler
Decarbonated Gas Washer
Carbon Filter
Storage Tank
CO2 Sump Pit
Furnace De-Scaler
XB 18 Bottom of the Clarifier
XB 18 Tanks
Re-Heating Furnace
Water Manhole

02.10.2012
02.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
03.10.2012
09.10.2012
09.10.2012
09.10.2012
10.10.2012
10.10.2012

DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
DM
Hameed
Hameed
Hameed
Mohamed
Hameed

DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
RM4
RM4
RM4
RM4
RM4 Near Roll Workshop

DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
DRP
RM4
Utility WTP
Utility WTP
RM4
RM4

Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Operation
Utility
Utility
Operation
Operation