CANTILEVER
SURAMADU APPROACH BRIDGE
1
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
Lokasi Jembatan
Suramadu
2
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
TO SURABAYA
02.10.07
TO MADURA
APPROACH BRIDGE
APPROACH BRIDGE
672 M
818 M
672 M
44
38
36
40
42
45
41
37
39
43
BRIDGE DETAILS
BRIDGE ELEVATION
48
56
50
52
54
51
53
55 57
49
CONSORTIUM OF INDONESIAN
CONTRACTOR
A. DATA TEKNIS
1. Panjang Bentang : 672 m P37 ~ p45
2. Jumlah Pier :
3. Pile Casing :
16 Pier x 18 ttk
4. Bored pile :
5. Pile Cap :
4
02.10.07
= 25.5 x 12 x 3 m
P41 + P42
= 25.5 x 16 x 3.5 m
P45 + P48
CONSORTIUM OF INDONESIAN
CONTRACTOR
6.
7.
Box Girder :
Length = 40 m
Height = 2.1 ~ 4.4 m (variatif)
Width = 14.7 m
Balance Cantilever Method :
5
02.10.07
Segment = 2 x 7 x 8 segment
Closure
Pier
P45
P48
Unit
2
2
2
2
2
2
2
2
16
Unit
2
2
4
= 2 x 7 buah
CONSORTIUM OF INDONESIAN
CONTRACTOR
B. CONSTRUCTION METHOD
Super structure berupa double box
girder yang dilaksanakan secara
balance cantilever, cast in situ dengan
traveller form.
6
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
1. Assembly Traveller
Traveller F/W
= 58.0 T
Traveller = 20.4 T
1. Traveller = 13,050 T
2. Rail
Total
7,300 T
= 20,350 T
2. Beam + Penggantung
= 5.9 T
CONSORTIUM OF INDONESIAN
CONTRACTOR
CONSORTIUM OF INDONESIAN
CONTRACTOR
CONSORTIUM OF INDONESIAN
CONTRACTOR
2. Pengoperasian Traveller
Pengecoran
Pergerakan
Bagian depan traveller
bertumpu pada Hyd. Jack j_1
Traveller bertumpu diatas rel
Pergerakan traveller
dilakukan dg hydraulic jack j_3
CONSORTIUM OF INDONESIAN
CONTRACTOR
1.
2.
3.
6200
(2)
(2)
CL
PIER
F1
F1
STEP 1
1.
2.
3.
4.
5.
4000
2
(2)
1
CL
AUXILIARY SUPPORT
STEP 2
PIER
AUXILIARY SUPPORT
F1
S5
4000
2
2.
3.
4.
5.
4000
1
S3 S4
3500
3500
CL
F1
STEP 3
4000
2
S4
4000
1
S4 S3
S5
4000
2
4000
1
4500
PIER
S5
F1
2600
1.
4000
1
3500
3500
S5
S4 S3
S3 S4
S5
F1
S3
3500
3500
4000
1
S4 S3
4000
2
S5
CONSORTIUM OF INDONESIAN
CONTRACTOR
4500
CL
F1
PIER
S5
S4
4000
2
4000
3
1
2.
3.
4.
STEP 4
S3
4000
1
3500
3500
4000
1
4000
2
PIER
4000
4
S4
4000
3
F1
S3
4000
2
1.
STEP 5
S5
4000
3
4500
CL
S5
S4 S3
CASTING A SECTION WITH 4000mm FOR BOTH SIDES, SET UP LAUNCHING-RAIL WITH TIE DOWN 7.
MOVING FORWARD BOTH DEVICES BY 1000mm WITHOUT LONG F1.
FORWARD MOVEMENT OF BOTH DEVICES AND LONG, GIRDER F1 BY 3000 mm INTO NEXT CASTING POSITION
ROLL-OFF BEARING S3 IS NEWLY ANCHORED, THEN REAR - ROLLER S4 IS PUT FORWARD AND ANCHORED
4500
F1
F1
2.
3.
4000
1
3500
3500
4000
1
4000
2
4000
3
S4 S3
4000
4
S5
CASTING A SECTION WITH 4000mm FOR BOTH SIDES, MOVING FORWARD THE LAUNCHING-RAIL WITH TIE
DOWN 7 & 2
MOVING FORWARD BOTH DEVICES AND LONG. GIRDER F1, INTO NEXT CASTING POSITION.
ROLL-OFF BEARING S3 IS NEWLY ANCHORED , THEN REAR-ROLLER S4 IS PUT FORWARD AND ANCHORED
CONSORTIUM OF INDONESIAN
CONTRACTOR
Chain Bloks
( 100kN )
Chain Bloks
( 100kN )
Girder
C
L Of Pier
C
L Of Pier
80000
80000
CONSORTIUM OF INDONESIAN
CONTRACTOR
C
L Of Pier
C
L Of Pier
Plan
Bearing
80.000
80.000
CONSORTIUM
OF INDONESIAN
CONTRACTOR
80000
80000
CONSORTIUM OF INDONESIAN
CONTRACTOR
SEQUENCE OF CONCRETING
BOX GIRDER
STEP 1
CONCRETE ( STEP 1 )
BOX GIRDER ( TYPICAL SECTION )
STEP 2
CONCRETE ( STEP 2 )
CONCRETE ( STEP 1 )
BOX GIRDER ( TYPICAL SECTION )
CONCRETE ( STEP 3 ) STEP 3
CONCRETE ( STEP 2 )
CONCRETE ( STEP 1 )
BOX GIRDER ( TYPICAL SECTION )
CONSORTIUM OF INDONESIAN
CONTRACTOR
No
DESCRIPTION
Duration
0.5
0.5
1.5
0.5
1.5
Concrete pouring
0.5
Curing
Stressing
19
02.10.07
Days
1
Bisa diperpendek
0.5
CONSORTIUM OF INDONESIAN
CONTRACTOR
5. Sequence stressing
Cantilever
Cantileverstressing
stressing
Tes
Testekan
tekanbeton
beton>>85
85%%
Stressing
Stressing75
75%%UTS
UTS
Urutan
Urutan
pekerjaan
pekerjaan
stressing
stressing
Transversal
Transversalstressing
stressing
Stressing
Stressing40-50
40-50%%UTS
UTS
Continuity
Continuitystressing
stressing
closure
CCororclosure
20
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
Tampang Tendon
1.
Tendon cantilever
2. Tendon transversal
3-515.24 mm
3. Tendon longitudinal
1915.24 mm
21
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
1
0
1
1
1
2
1
3
1
4
1
5
1
6
1
7
1
8
1
9
2
0
1
6
1
7
1
8
1
9
2
0
02.10.07
NOTE :
- FOR TOP =
- FOR BOTTOM =
1
0
1
1
1
2
1
3
1
4
1
5
CONSORTIUM OF INDONESIAN
CONTRACTOR
Pier 36
Pier 38
P.3
7
Pier 36
Pier 38
P.3
7
P.3
7
Pier 36
02.10.07
Pier 38
NOTE :
- FOR TOP =
- FOR BOTTOM =
CONSORTIUM OF INDONESIAN
CONTRACTOR
6. Deflection control
3
4
5
24
02.10.07
Install rebar
Compare
prechamber
analysis
Pengecoran segmen
Pekerjaan stressing
Pergerakan traveller
CONSORTIUM OF INDONESIAN
CONTRACTOR
25
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
4. Closure
A
Segmen penutup antar span
Closure
Selama pelaksanaan
terlindungi thd muai
D
F/W memakai traveller / profil
26
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
2.
1.
27
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR
CONSORTIUM OF INDONESIAN
CONTRACTOR
29
02.10.07
CONSORTIUM OF INDONESIAN
CONTRACTOR