To,
M/s Rajaratna Energy Holdings Private Limited
Sl.
No
1
a)
b)
c)
d)
.45
.125
Civil
a) Supply of J Bolts
b) Construction of Civil Base Pedestals
c) Errection of Structures
Total Cost(Cr)
.12
1.25
2.25
.625
.60
3.5 Cr
4.725 Cr
General Terms:
1. CST @ 2% extra for the System against C form
2. Can get the ED exemption otherwise Excise Duty @ 10.36% extra.
3. Service Tax of 12.36% extra for Design and Installation.
4. Payment: a. 90% prorated with supply of structures against LC after delivery of material at site.
c. 10% after successful Commissioning of the System.
5. Freight Charges extra as per actual.
6. Supply of Auxiliary Power Supply will be Under Customer Scope.
7. Delivery of the System will be done within 6 Weeks.