BI-DIRECTIONAL
O-cell®
LOAD TESTING
IER Z ea a
LOADTEST
Te UD eam LUR Uae eee ce CgFounded in 1991, LOADTEST
specializes in b-crectional deep foundation
load testing using the award-winning O-cll
Through its research and hard work
LOADTEST has redefined the art of
load testing.
No job has been too big or too small
to enjoy the advantages of the O-cll
Numerous word testing records have been
using the O-call including the current
world record of 62,700 kips (279 MN) set
in Incheon, Korea in 2005, LOADTEST has
completed over 2,000 load tests adding
‘nother 250-300 tests per year Over 10%
ofthe thase tests had total loads in excess
(of 10,000 kips (45 MIN). The O-cell can be
Used to isolate portions of a died shaft or
Pile for testing, or can be used to test
‘multiple levels within the same ple
‘Whether inthe middle of the Mekong River
in Vietnam, off the coast of South Africa or
just down the road, LOADTEST and the
(O-cll nave risen to every challenge.
LOADTEST otters O-cel load testing
equipment and instalation assistance
LOADTEST can also provide full planning
and specication support, field load
testing and analytical services. LOADTEST
is dedicated to advancing state-of-the-art
deep foundation load testing
Test Shatts trom 15 10450 feet (5t0 138 m)
hhave been successfully installed. Precast
piles as long as 130 feet (40 m) have been
‘riven and tested with tne O-cel eT TayThe O-cell®
Dt. Jor]. Osterberg, Professor Emeritus of Chil portion of the O-cal load test and upp s
gineering at Northwestern University, inve provides reaction forthe
and developed a deep foundation lod testing side shear portion of th
vice to meet the construction industry's need for
an innovative and effective method for testing high
capacity died shafts and piles. Osterberg's
invention, the Osterberg Cel, or O-cel,has
radically
changed the
way foundation
load tess are
lesioned,
performed and
interpreted
Load testing withthe 0
thre things occurs: ult
acted, ulimate end bs
or the maximum O-cell
No longer do
engineers need
ta rely on smal,
sealed down tost
shafts due to
the enormous
expense of
convention:
ally testing large
diameter shafts,
Non-conserva
tive scaling
errors can be p
eliminated by (Goel)
testing the
full size produc
tion shafts even
if loads exceed
50,000 kips Exctaane
(223 MN). The
(call isa hydraulically driven, calirated, sacrificial increased to more t 2
Jacking device installed within the foundation unit, utilizing mu
Working in two directions, upward against side elements wt
shear and downward against end-bearng, the for testing
-cell automaticaly separates the resistance dat,
By virtue of its instalation within the foundation Using the 0
‘member, the O-call cad testis not restricted by the application of
limits of overhead structural beams and tie-down expensive, tm
piles. Instead, the O-cell derives all reaction from to st
the soil and/or rock system. End bearing and lower load testing of dedicated or production sh
side shear provide reaction forthe upper side shear and piles.
re