Design of Box Type Culvert: Thickness of Side Wall Is OK
Design of Box Type Culvert: Thickness of Side Wall Is OK
Mscbc
12000
45000
18000
30
50
20
7
3.05
N/m2
N/m2
Degree
mm
400
400
410
x
N/m
415
7 Steel
4.00
1 In side diamentions
N/m2
m
N/m2 sst
150
50
25000
13
190
mm
mm
O.K.
mm
kg/m3
N/m2
mm
9 Reinforcement
Top slab
20
8
mm F @
Vertical
8
20
8
8
20
mm F @
Distribution
mm c/c
mm F @
120
110
200
100
110
-180
300
mm F @
110
mm c/c
240
mm c/c
Main
Distribution
At supports
Bottom slab
Main
Distribution
At supports
20 mm F @
mm F @
mm F @
mm F @
mm F @
8 mm F @
200
8 mm F @
mm c/c
mm c/c
mm c/c
mm c/c
mm c/c
mm c/c
Both side
mm C/C
110
mm C/c
400
800
20 mm F @
300 mm C/C
20 mm F @
120 mm C/C
3.05
8 mm F @
110 mm C/C
20 mm F @
100 mm c/c
410
20 mm F @
200 mm c/c
400
pk_nandwana@yahoo.co.in
8 mm F @
200 mm C/C
4.00
8 mm F @
110
mm C/c
400
O.K.
1
2
3
4
5
6
6
In side diamentions
Super imposed load
Live load
Wieght of soil
Angle of repose
Nominal cover top/bottom
Cocrete
7 Steel
1 Solution
9800
N/m3
50
mm
25000 N/m3
13
190
N/m2
150
N/m2
Genral
For the purpose of design , one metre length of the box is considered.
The analysis is done for the following cases.
(I) Live load, dead load and earth prssure acting , with no water pressure from inside.
(II) Live and dead load on top and earth pressure acting from out side, and water pressure acting from inside,
with no live load on sides
(III) Dead load and earth pressure acting from out side and water pressure from in side.
Let the thicness of Horizontal slab
Vertical wall thicness
Effective slab span
Effective Height of wall
400
400
4
3.05
mm
mm
+
0.4
+
0.4
=
=
=
=
0.4
0.4
4.4
3.45
m
m
m
m
2 Case 1 : Dead and live load from out side of while no water pressure from inside.
10000
Self weight og top slab =
0.4 x
1x
1 x #### =
57000
Live load and dead load =
45000 + ####
=
67000
Total load on top =
34500
Weight of side wall =
3.45 x
0.4 x ####
=
\ Upward soil reaction at base = ( 67000 x
4.4 )+(
2 x #### )=
82681.8
4.4
1 - sin 30
10.5
0.5 = 1 =
Ka =
=
=
1 + sin 30
1+
0.5
3
1.5
\ Latral pressure due to dead load and live load = Pv x Ka
19000 N/m2
p = #### x
0.33 =
Latral pressure due to soil Ka x w x h
=
0.33 x #### h = 6000 h
Hence total pressure
= #### + 6000 h
19000 N/m2
Latral presure intencity at top
=
39700
Latral pressure intencity at bottom
= #### + 6000 x 3.45 =
Fig 1 show the box culvert
frame ABC D, along with the
external loads, Due to symmetry,
half of frame (i.e. AEFD ) of box
culvert is considered for moment
distribution. Since all the members
have uniform thickness, and uniform
diamentions, the relative stiffness
K for AD will be equal to 1 while the
relative stiffness for AE and DF will
be 1/2.
w=
67000 N/m
N/m2
N/m2
N/m2
N/m
N/m2
0.33
N/m2
19000
19000
A
4.40
h
19000
3.45
6000 h
D
C
19000
39700
w
82682 N/m
Fig 1
20700
1
=
1+1/2
pL2
12
19000
+
x
12
WL
15
3.45
2/3
wL2
12
1/2
=
1+1/2
1/3
#### x
3.45 2=
-66456 N - m
12
#### x
wL2
3.45 2= 82010 N - m
+
=
12
12
Where W is the total tringular earth pressure.
2
+ #### x
2
3.45
3.45 =
15
27059
WL
pL2
12
15
19000 x
3.45 2-- #### x 3.45
3.45 = -18846
MFDA = x
12
2
10
The Moment distribution is carried out as illustrate in table
N-m
MFDA = -
-12319
-31165
DC
82010.03
DA
-31165
AD
27059
AB
-66456
45330
67000
45330
54096
115575
115575
54096
19000
45330
116810
45330
1.725
#####
3.45 m
58023
1.725
20700 D
39700
D
75044
58023
181900
142067
181900
75044
82682
Fig 2
67000 N/m2.
For horizontal slab AB, carrying UDL @
67000 x 3.45 = 115575 N/m2
Vertical reactionat a and B =
0.5
x
Similarly, for the Bottom slab DC carrying U.D.L.loads @ #### N/m2
82681.8 x 4.40 = 181900
Vertical reaction at D and C = 0.5
x
N
The body diagram for various members, including loading, B.M. And reactions are shown in fig.2
For the vertical member AD, the horizontal reaction at A is found by taking moments at D.Thus
( -ha x 4.40
) + 45330 - #### + #### x 4.40 x 4.40 x 1/2
1/2
20700 x 4.40 x 4.40 x 1/3
+
x
-12693
183920 + 66792
-ha x 4.40 +
+
From which, ha = 54096
Hence , hd =( 19000 + #### )x 4.40 #### = 75044 N
2
x 4.40 2=
162140 N-m
8
162140
45330
116810 N-m
Net B.M. at E =
=
82681.8182 x 4.40 2=
Similarly, free B.M. at F =
200090 N -m
8
200090
58023
142067 N-m
Net B.M. at F =
=
For vertical member AD , Simply supported B.M. At mid span
19000
x 4.40 2+
1/16 x #### x 4.40 2= 71027
Simply supporetd at mid sapn =
8
58023
+ 45330
Net B.M. =
=
51677 - #### = -19351 N-m
2
3 Case 2 : Dead load and live load from out side and water pressure from inside.
In this case , water pressure having an intensity of zero at A and
9800 x 3.45 = 33810 N/m2
At D, is acting, in addition to the pressure
considered in case 1. The various pressures
w=
67000 N/m2
are marked in fig 3 .The vertical walls will thus
19000
19000
19000
be subjected to a net latral pressure of
2
13110
= 19000 N/m At the Top
Itensity
A
E
B
And
= 39700 33810
4.40
=
5890 N/m2 at the bottom
3.45
39700
39700
w
Fig 3
= #### x
4.40 2=
-108093 N - m
12
#### x
wL2
4.4 2= 133393 N - m
=
12
12
Where W is the total tringular earth pressure.
Mfdc=
MFAD = +
pL2
12
5890
+
x
12
WL
10
4.4
5890
82682 N/m2
wL2
12
MFAD = +
67000
+ #### x
2
4.4
4.4
10
WL
pL2
12
15
5890 x
4.4 2- #### x
4.4
4.4
MFDA = x
12
2
15
The moment distribution is carrired out as illustred in table.
22194
N-m
-17963 N -m
MFDA = -
DC
133393.3
DA
-17963
AD
22194
AB
-108093
61460
67000
61460
20044
115575
19000
115575
61460
38224
20044
61460
1.725
51903
3.45
79378
5890 D
1.725
D
-1060
balance
Carry over
balance
Carry over
balance
Carry over
balance
Carry over
balance
Final moment
-475
-118
-53
-13
79378
-2121
1425
-950
353
-236
158
-106
39
-26
-79378
2850
-1060
707
-475
317
-118
79
-53
35
61460
1425
22892
353
43637
79378
142626
142626
22892
158
82682
39
Fig 4
18
-61460
67000 N/m2.
For horizontal slab AB, carrying UDL @
67000 x 3.45 = 115575 N/m2
Vertical reactionat a and B =
0.5
x
Similarly, for the Bottom slab DC carrying U.D.L.loads @ #### N/m2
82682 x 3.45 = 142626
Vertical reaction at D and C = 0.5
x
N
The body diagram for various members, including loading, B.M. And reactions are shown in fig.3
For the vertical member AD, the horizontal reaction at A is found by taking moments at D.Thus
( -ha x 3.45
) + 61460 - #### + 5890 x 3.45 x 3.45 x 1/2
1/2
13110 x 3.45 x 3.45 x 2/3
+
x
-17918
35052.9 + 52013.9
-ha x 3.45 +
+
From which, ha = 20044
Hence , hd =( 5890 + #### )x 3.45 #### = 22892 N
2
67000
x 3.45 2=
Free B.M. at mid point E =
99684
N-m
8
99684
61460
38224 N-m
Net B.M. at E =
=
2
82682
x 3.45 =
Similarly, free B.M. at F =
123015 N -m
8
79378
43637 N-m
Net B.M. at F = 123015.043 =
For vertical member AD , Simply supported B.M. At mid span
5890
x 3.45 2+
1/16 x #### x 3.45 2= 18516
Simply supporetd at mid sapn =
8
79378
+ 61460
Net B.M. =
=
70419 - #### = 51903 N-m
2
4 Case 3 : Dead load and live load on top water pressure from inside no live load on side.
in this case, it is assume that there is no latral oressure due to live load . As before .
The top slab is subjected to a load of '=
67000 N/m2
w=
67000 N/m2
4000
4000
A
N/m
N/m
4000
4.40
3.45
6000
24700
4000
N/m2
24700
33810
w=
13110
82682 N/m233810
Fig 5
24700 N/m2
Earth pressure intensity at Bottom= 4000 + 6000 x 3.45
=
In addition to these, the vertical wall lslab subjectednto water pressure of intensity ZERO at top and
N/m2 at Bottom, acting from inside . The lateral pressure on vertical walls Is shown in fig 5 and 6
33810
wL2
12
#### x
4.40 2=
-108093 N - m
12
#### x
wL2
4.4 2= 133393 N - m
=
12
12
Where W is the total tringular earth pressure.
pL2
12
4000
x
12
WL
15
4.4
#### x
2
6453 -
4.4
4.4
15
WL
8460
pL2
+
12
10
4000 x
4.4 2- #### x
4.4
4.4
MFDA = x
12
2
10
The moment distribution is carrired out as illustred in table.
MFDA = -
-2007
N-m
6237
N -m
DC
133393.3
DA
6237
AD
-2007
AB
-108093
49361
67000
49361
=
115575
115575
4000
A
49361
49361
112779
A
1.725
64504
3.45
67280
0D
13110
1.725
D
67280
142626
5833
132810
142626
82682
Fig 4
67000 N/m2.
For horizontal slab AB, carrying UDL @
67000 x 3.45 = 115575 N
Vertical reactionat a and B =
0.5
x
Similarly, for the Bottom slab DC carrying U.D.L.loads @ #### N/m2
82682 x 3.45 = 142626
Vertical reaction at D and C = 0.5
x
N
The body diagram for various members, including loading, B.M. And reactions are shown in fig.6
For the vertical member AD, the horizontal reaction at A is found by taking moments at D.Thus
( ha x 3.45
) + 49361 - #### + 4000 x 3.45 x 3.45 x 1/2
1/2
13110 x 3.45 x 3.45 x 1/3
x
-17919
23805
26007
-ha x 3.45 +
+
5833
From which, ha =
Hence , hd =( 13110 x 3.45 )- 4000 x
3.45 - 5833 = 2981.8
2
67000
x 4.40 2=
Free B.M. at mid point E =
162140 N-m
8
49361
112779 N-m
=
x 4.40 2=
Similarly, free B.M. at F =
200090 N -m
8
200090
67280
132810 N-m
Net B.M. at F =
=
For vertical member AD , Simply supported B.M. At mid span
4000
x 4.40 2+
1/16 x #### x 4.40 2= 6183.1
Simply supporetd at mid sapn =
8
67280
+ 49361
Net B.M. =
=
58321 + 6183 = 64504 N-m
2
Net B.M. at E =
162140
82682
Case
(i)
(II)
(II)
Mid section
The top slab is subjected to following values of B.M. and direct force
B.M. at Center (E)
B.M. at ends (A)
Direct force (ha)
116810
45330
54096
38224
61460
20044
112779
49361
5833
Area
2617 /
available from the bars bentup from the middle section =
2 = 1308
mm2
1037 < 1308 Hence these bars will serve the purpose. However, provide 8 mm dia.
Additional bars @ 200 mm c/c
3.14xdia2
4 x100
Spacing of Bars =Ax1000/Ast
314 x 1000 / 3010
Hence Provided
20
mm F Bars @
Acual Ast provided 1000 x
314 /
100
Bend half bars up near support at distance of L/5
=
4.40
0.1 x(
410
Area of distributionn steel =
0.3
450 100
Ast
=
0.21
x
410 x 10 = 867
20 x 20
= 314 mm2
4
100 mm
=
104
say
=
100 mm c/c
= 3140
mm2
/
5 = 0.90 m
100
= 0.21 %
using
20
mm bars
= #### N/m3
= 9800 N/mm2
for water side force
= 0.378
0.378
= 0.874
= 1.155
J
R
=
=
0.874
1.155
mm bars
401
mm
360 mm
= 3010 mm2
=
mm2
using 8
3.14xdia
=
4 x100
x 1000 / 434 =
mm F Bars @
8
=
3.14 x
434 mm2
area on each face=
3.14 x
8
x 8
= 50 mm2
4
110 mm
116
say
=
110 mm c/c on each face
-269
mm2
3.14 x
8
x 8
3.14xdia
A
=
=
= 50 mm2
4 x100
4
50
x 1000 / -269 = -187
say
= -180 mm
-180 mm c/c throught out the slab, at its bottom.
using 8
mm bars
Case
(i)
(II)
(II)
1000 n
2
1000 n+
2
or
500 n
400
12
350
12560
500 n+
n
50
1047
x
n
n
3
n
3
12
50
50
####
n
50
167
n2
+ -1256000
175000 n
500 n
12560
multiply by n
175000 n2
500 n2
167 n3
12560
175000 n2
293500 n2
167 n3
+ -1256000 n
15359833 n
-
-118500 n2
14103833 n
84623
-711 n2
+
Solwing this trial and error we get, n
\ c'
= (
500
x
x(
112.86
628000
n
+ -1256000 n
n- 628000 -
n
=
+
400 -
1047
x
n
13
50
1047
x 400 n
-1E+06
n
350
-100
50
-n
= 437 + 150
n
-62800000
n
=
4762333
+ ####
n
587
-62800000
4762333 +
#### n
-62800000
3164125667
587
= 167 n3
-3101325667
18607954
112.86 mm
12 x
1047
( 112.86 112.86
112.86 )
50 -
= n3
50
)-
13 x 1047
112.86
237.14 =
34840
56432 +
111.3 x 62.86 121 x
181900
=
<
\ c' =
5.22
7
N/mm2 Stress is less than permissiable
34840
m c'
13 x
5.22
Also stress in steel t =
(D-dc-n)
=
x ( 400 50
- 112.86
)
112.86
n
= 142.6 N/mm2
< 190 N/mm2
O.K.
Stress in steel is less than permissiable Hence section is O.K.
or
Box culverts
20 mm F @
240
mm c/c
8 mm F @
200
8 mm F @
mm C/C
110
mm C/c
400
800
20 mm F @
300 mm C/C
20 mm F @
120 mm C/C
3.05
8 mm F @
110 mm C/C
20 mm F @
100 mm c/c
410
20 mm F @
200 mm c/c
400
8 mm F @
8 mm F @
200 mm C/C
110 mm C/c
4.00
400
Tensile
stress
1.2
M-15
M-20
M-25
M-30
M-35
M-40
2.0
2.8
3.2
3.6
4.0
4.4
10
15
20
25
30
35
40
45
50
Kg/m2
300
500
700
850
1000
1150
1300
1450
1600
(N/mm2)
2.5
4.0
5.0
6.0
8.0
9.0
10.0
11.0
12.0
Kg/m2
250
400
500
600
800
900
1000
1100
1200
M-15
19
(18.67)
M-20
13
(13.33)
M-25
11
(10.98)
M-30
9
(9.33)
M-35
8
(8.11)
M-40
7
(7.18)
M-15
M-20
M-25
M-30
M-35
M-40
Modular Ratio
scbc N/mm2
18.67
5
13.33
7
10.98
8.5
9.33
10
8.11
11.5
7.18
13
93.33
93.33
93.33
93.33
93.33
93.33
kc
0.4
0.4
0.4
0.4
0.4
0.4
jc
0.867
0.867
0.867
0.867
0.867
0.867
Rc
0.867
1.214
1.474
1.734
1.994
2.254
Pc (%)
0.714
1.214
1.429
1.643
1.857
kc
0.329
0.329
0.329
0.329
0.329
0.329
0.89
0.732
0.89
0.89
0.89
0.89
0.89
1.025
1.244
1.464
1.684
1.903
0.433
0.606
0.736
0.866
0.997
1.127
kc
0.289
0.289
0.289
0.289
0.289
0.289
jc
0.904
0.904
0.904
0.904
0.904
0.904
Rc
0.653
0.914
1.11
1.306
1.502
1.698
Pc (%)
0.314
0.44
0.534
0.628
0.722
0.816
m scbc
(a) sst =
140
N/mm2
(Fe 250)
(b) sst = j
c
190
Rc
N/mm2
Pc (%)
(c ) sst =
230
N/mm2
(Fe 415)
Grade of concrete M
tbd (N / mm2)
Shear stress tc
100As
M-20
bd
0.15
0.18
0.16
0.18
0.17
0.18
0.18
0.19
0.19
0.19
0.2
0.19
0.21
0.2
0.22
0.2
0.23
0.2
0.24
0.21
0.25
0.21
0.26
0.21
0.27
0.22
0.28
0.22
0.29
0.22
0.3
0.23
0.31
0.23
0.32
0.24
0.33
0.24
0.34
0.24
0.35
0.25
0.36
0.25
0.37
0.25
0.38
0.26
0.39
0.26
0.4
0.26
0.41
0.27
0.42
0.27
0.43
0.27
0.44
0.28
0.45
0.28
0.46
0.28
0.47
0.29
0.48
0.29
0.49
0.29
0.5
0.30
0.51
0.30
0.52
0.30
0.53
0.30
0.54
0.30
0.55
0.31
0.56
0.31
Reiforcement %
100As
M-20
bd
0.18
0.15
0.19
0.18
0.2
0.21
0.21
0.24
0.22
0.27
0.23
0.3
0.24
0.32
0.25
0.35
0.26
0.38
0.27
0.41
0.28
0.44
0.29
0.47
0.30
0.5
0.31
0.55
0.32
0.6
0.33
0.65
0.34
0.7
0.35
0.75
0.36
0.82
0.37
0.88
0.38
0.94
0.39
1.00
0.4
1.08
0.41
1.16
0.42
1.25
0.43
1.33
0.44
1.41
0.45
1.50
0.46
1.63
0.46
1.64
0.47
1.75
0.48
1.88
0.49
2.00
0.50
2.13
0.51
2.25
Value of angle
Degree
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
30
35
40
45
50
55
60
65
sin
0.17
0.19
0.21
0.23
0.24
0.26
0.28
0.29
0.31
0.33
0.34
0.36
0.37
0.39
0.41
0.42
0.50
0.57
0.64
0.71
0.77
0.82
0.87
0.91
cos
0.98
0.98
0.98
0.97
0.97
0.97
0.96
0.96
0.95
0.95
0.94
0.93
0.93
0.92
0.92
0.91
0.87
0.82
0.77
0.71
0.64
0.57
0.50
0.42
tan
0.18
0.19
0.21
0.23
0.25
0.27
0.29
0.31
0.32
0.34
0.36
0.38
0.40
0.42
0.45
0.47
0.58
0.70
0.84
1.00
1.19
1.43
1.73
2.14
0.57
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68
0.69
0.7
0.71
0.72
0.73
0.74
0.75
0.76
0.77
0.78
0.79
0.8
0.81
0.82
0.83
0.84
0.85
0.86
0.87
0.88
0.89
0.9
0.91
0.92
0.93
0.94
0.95
0.96
0.97
0.98
0.99
1.00
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
0.31
0.31
0.31
0.32
0.32
0.32
0.32
0.32
0.33
0.33
0.33
0.33
0.33
0.34
0.34
0.34
0.34
0.34
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.36
0.36
0.36
0.36
0.36
0.36
0.37
0.37
0.37
0.37
0.37
0.37
0.38
0.38
0.38
0.38
0.38
0.38
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.39
0.4
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35
1.36
1.37
1.38
1.39
1.40
1.41
1.42
1.43
1.44
1.45
1.46
1.47
1.48
1.49
1.50
1.51
1.52
1.53
1.54
1.55
1.56
1.57
1.58
1.59
1.60
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.41
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.44
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
1.61
1.62
1.63
1.64
1.65
1.66
1.67
1.68
1.69
1.70
1.71
1.72
1.73
1.74
1.75
1.76
1.77
1.78
1.79
1.80
1.81
1.82
1.83
1.84
1.85
1.86
1.87
1.88
1.89
1.90
1.91
1.92
1.93
1.94
1.95
1.96
1.97
1.98
1.99
2.00
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10
2.11
2.12
0.45
0.45
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.46
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.47
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.48
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
0.49
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
2.30
2.31
2.32
2.33
2.34
2.35
2.36
2.37
2.38
2.39
2.40
2.41
2.42
2.43
2.44
2.45
2.46
2.47
2.48
2.49
2.50
2.51
2.52
2.53
2.54
2.55
2.56
2.57
2.58
2.59
2.60
2.61
2.62
2.63
2.64
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
2.65
2.66
2.67
2.68
2.69
2.70
2.71
2.72
2.73
2.74
2.75
2.76
2.77
2.78
2.79
2.80
2.81
2.82
2.83
2.84
2.85
2.86
2.87
2.88
2.89
2.90
2.91
2.92
2.93
2.94
2.95
2.96
2.97
2.98
2.99
3.00
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
0.51
tc N/mm2
M-35
M-40
0.2
0.2
0.23
0.23
0.31
0.32
0.37
0.38
0.42
0.42
0.45
0.46
0.49
0.49
0.52
0.52
0.54
0.55
0.56
0.57
0.58
0.60
0.60
0.62
0.62
0.63
300 or more
1.00
275
1.05
250
1.10
225
1.15
200
1.20
175
1.25
150 or less
1.30
M-15
1.6
tc.max
M-20
1.8
M-25
1.9
M-30
2.2
M-35
2.3
M-40
2.5
Table 3.4. Permissible Bond stress Table tbd in concrete (IS : 456-2000)
Grade of concrete M10
-tbd (N / mm2)
15
0.6
20
0.8
25
0.9
30
1
35
1.1
40
1.2
H.Y.S.D. Bars
tbd (N / mm2)
kd = Ld F
M 15
0.6
58
0.96
60
M 20
0.8
44
1.28
45
M 25
0.9
39
1.44
40
M 30
35
1.6
36
M 35
1.1
32
1.76
33
M 40
1.2
29
1.92
30
M 45
1.3
27
2.08
28
M 50
1.4
25
2.24
26
45
1.3
Value of angle
tan
0.18
0.19
0.21
0.23
0.25
0.27
0.29
0.31
0.32
0.34
0.36
0.38
0.40
0.42
0.45
0.47
0.58
0.70
0.84
1.00
1.19
1.43
1.73
2.14
Degree
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
30
35
40
45
50
55
60
65
sin
0.17
0.19
0.21
0.23
0.24
0.26
0.28
0.29
0.31
0.33
0.34
0.36
0.37
0.39
0.41
0.42
0.50
0.57
0.64
0.71
0.77
0.82
0.87
0.91
cos
0.98
0.98
0.98
0.97
0.97
0.97
0.96
0.96
0.95
0.95
0.94
0.93
0.93
0.92
0.92
0.91
0.87
0.82
0.77
0.71
0.64
0.57
0.50
0.42
: 456-2000)
50
1.4