Archive Manager Message Export

From:

Michael Kuo

To:

Dennis Kuhn

Subject:

RE: Temp Electric Panel on Commons

Page 1 of 2

Sent:

Thu, 14 Nov 2013 05:11:58 GMT

Done. Work Order #301181388.

Michael R. Kuo
Project Manager
Ithaca Commons Repair & Upgrade Project
215 East State Street
Ithaca, NY 14850
W: (607)216-8873
F: (607)274-6587
C: (607)342-4235
mkuo@cityofithaca.org
>>> "Kuhn, Dennis" <DKuhn@nyseg.com> 11/14/2013 9:05 AM >>>

Michael,
I have passed this on to Jack Czaparanski. It looks fine to me. The first thing that needs to happen is the
City needs to apply for the temporary service. 1-800-572-1111. Once that happens I can do my work.
Thanks,
Dennis

Dennis Kuhn

Electrical Field Planner


NYSEG - Ithaca Division Electrical Engineering

Ph: (607) 347-2501


Fax: (607) 347-2949
Email: dkuhn@nyseg.com

From: Michael Kuo [mailto:mkuo@cityofithaca.org]


Sent: Wednesday, November 13, 2013 11:04 AM
To: Kuhn, Dennis
Cc: Jessica Buckley; Tom West; William McGuane; Dan Walker; Robert Sparks
Subject: Temp Electric Panel on Commons

file://K:\FOIL264\mkuo2011\messages\69f8c961-73be-fd5b-7472-09958a61765e.html

11/20/2014

Archive Manager Message Export

Page 2 of 2

Dennis:
Just left you a VM on this.

Last Friday, the City met with Sparks Electric about establishing a temp electric panel for our streetlights and
construction power. We would like to set up a 100a, 3-phase panel with a meter approximately 35'-40'
south of the existing NYSEG manhole on Bank Alley. The panel would be specified for outdoor use and
would be mounted ona frame madeof plywood mounted on 4' x 4's.Sparks will be submitting a proposal
to the City today and we will get a contract going with them.

We'd like to have our utilities contractor, Vacri Construction,establish a pathway for Sparks by connecting
the panel to the manhole via 2" conduit with a drag line for Sparks to run the wiring between the two
points. Vacri would also construct the panel.

Attached is a sketch of the proposed plan.

The City will be the applicant/owner forthe temp electric service. The work will be complete by December 6,
2013. What do we need to do to gain access to and penetrate the manhole?

Thanks,
Michael

Michael R. Kuo
Project Manager
Ithaca Commons Repair & Upgrade Project
215 East State Street
Ithaca, NY 14850
W: (607)216-8873
F: (607)274-6587
C: (607)342-4235