CALCULATION SHEET
SHEET___1___ OF ___1___
Designed by

Date
41947.00

PROJECT

Checked by

Design of External Sewerage Reticulation

SEWER

Design Discharge =

225

Peak Flow Factor = 4.7 x (PE/1000)^-0.11


-6

= 2.604X10 m /PE/Second

Hazen William Equation,


V = 0.849 x C x R

0.63

2 STOREY SHOP
MH20
MH20-MH21
MH21-MH22
MH25
MH25-MH24
MH24-MH23
MH23-MH22

12

107

DENSITY
(UNIT/AREA)

OTHER CUMM PEAK CUMM DIA GRAD VEL VEL.


(PE) POPLN FLOW FLOW (mm) 1 in (m/s) Check
(PE) FACTOR ( m3/s )

POPLN
(PE)

60

60

535

MH12
MH12-MH13
MH13-MH16
MH14
MH14-MH15
MH15-MH16

107

535

MH16-MH17
BLOCK B
MH17
MH17-MH18
MH18-MH19
MH19-EXT. MANHOLE
BLOCK B
MH5
MH5-MH4
MH4-MH3
BLOCK A
MH1
MH1-MH2
MH2-MH3

106

530

107

535

106

107

535

MANHOLE
CAP CAP. Length FALL
m3 /s Check (m)
(m)

G.L.
m

I.L.
m

Depth
m

MH
TYPE

Remark

0
0
0

60
60
60

6.40
6.40

0.01
0.01

225
225

200
200

0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.

21
27

0.11
0.14

5.935
5.910
5.890

4.435 1.500 Precast mh


4.330 1.580 Precast mh
4.195 1.695 Precast mh

0
0
0
0

60
60
60
60

6.40
6.40
6.40

0.01
0.01
0.01

225
225
225

200
200
200

0.87 O.K.
0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.
0.035 O.K.

31
31
36

0.16
0.16
0.18

5.780
5.820
5.885
5.890

4.280
4.125
3.970
3.790

120

120

5.93

0.01

225

200

0.87 O.K.

0.035 O.K.

22

0.11

6.035

3.825 2.210 Precast mh Add PE MH21-MH23

0
0
120

535
535
655

5.03
4.92

0.01
0.01

225
225

200
200

0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.

21
22

0.11
0.11

6.035
6.035
6.035

4.535 1.500 Precast mh


4.430 1.605 Precast mh
4.320 1.715 Precast mh Add PE MH12

0
0

655
655

4.92
4.92

0.01
0.01

225
225

200
200

0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.

19
19

0.10
0.10

6.035
6.035
6.035

3.825 2.210 Precast mh


3.730 2.305 Precast mh
3.635 2.400 Precast mh

0
0
0

535
535
535

5.03
5.03

0.01
0.01

225
225

150
150

1.02 O.K.
1.02 O.K.

0.040 O.K.
0.040 O.K.

25
25

0.17
0.17

6.035
6.035
6.035

4.535 1.500 Precast mh


4.368 1.667 Precast mh
4.202 1.833 Precast mh

655

1190

4.61

0.01

225

200

0.87 O.K.

0.035 O.K.

11

0.06

6.035

3.580 2.455 Precast mh Add PE MH16

1190
0
0

1190
1720
1720
1720

4.43
4.43
4.43

0.01
0.01
0.01

225
225
225

200
200
200

0.87 O.K.
0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.
0.035 O.K.

27
28
30

0.14
0.14
0.15

6.035
6.035
6.035
6.035

3.580
3.445
3.305
3.155

0
0

535
535
535

5.03
5.03

0.01
0.01

225
225

200
200

0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.

22
28

0.11
0.14

6.035
6.035
6.035

4.535 1.500
4.425 1.610 Precast mh
4.285 1.750 Precast mh

0
0

530
530
530

5.04
5.04

0.01
0.01

225
225

200
200

0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.

27
27

0.14
0.14

6.035
6.035
6.035

4.535 1.500
4.400 1.635 Precast mh
4.265 1.770 Precast mh

535
0
0

1065
1065
1065

4.67
4.67

0.01
0.01

225
225

200
200

0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.

20
18

0.10
0.09

6.035
6.035
6.035

4.535 1.500
4.435 1.600 Precast mh
4.345 1.690 Precast mh

1065
0
0
0

1600
1600
1600
1600

4.46
4.46
4.46

0.01
0.01
0.01

225
225
225

200
200
200

0.87 O.K.
0.87 O.K.
0.87 O.K.

0.035 O.K.
0.035 O.K.
0.035 O.K.

23
23
32

0.12
0.12
0.16

6.035
6.035
6.035
6.035

4.265
4.230
4.115
3.955

530

MH3
MH3-MH6
MH6-MH7
BLOCK A
MH7
MH7-MH8
MH8-MH9
MH9-EXT MH

110

PIPE

MH22-MH12
BLOCK C
MH10
MH10-MH11
MH11-MH12

C =

3.02.01

xS

CATCHMENTS
UNIT
m2

12

VCP

Version No:

0.54

DESIGN
MH
to
MH

Job No

1.500
1.695
1.915
2.100

2.455
2.590
2.730
2.880

1.770
1.805
1.920
2.080

Precast mh
Precast mh
Precast mh
Precast mh

Precast mh
Precast mh Add PE MH17-MH18
Precast mh
Precast mh Ext. Manhole

Precast mh Add PE MH6


Precast mh
Precast mh
Precast mh Ext. Manhole