CALCULATION SHEET
SHEET___1___ OF ___1___
Designed by
Date
41947.00
PROJECT
Checked by
SEWER
Design Discharge =
225
= 2.604X10 m /PE/Second
0.63
2 STOREY SHOP
MH20
MH20-MH21
MH21-MH22
MH25
MH25-MH24
MH24-MH23
MH23-MH22
12
107
DENSITY
(UNIT/AREA)
POPLN
(PE)
60
60
535
MH12
MH12-MH13
MH13-MH16
MH14
MH14-MH15
MH15-MH16
107
535
MH16-MH17
BLOCK B
MH17
MH17-MH18
MH18-MH19
MH19-EXT. MANHOLE
BLOCK B
MH5
MH5-MH4
MH4-MH3
BLOCK A
MH1
MH1-MH2
MH2-MH3
106
530
107
535
106
107
535
MANHOLE
CAP CAP. Length FALL
m3 /s Check (m)
(m)
G.L.
m
I.L.
m
Depth
m
MH
TYPE
Remark
0
0
0
60
60
60
6.40
6.40
0.01
0.01
225
225
200
200
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
21
27
0.11
0.14
5.935
5.910
5.890
0
0
0
0
60
60
60
60
6.40
6.40
6.40
0.01
0.01
0.01
225
225
225
200
200
200
0.87 O.K.
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
0.035 O.K.
31
31
36
0.16
0.16
0.18
5.780
5.820
5.885
5.890
4.280
4.125
3.970
3.790
120
120
5.93
0.01
225
200
0.87 O.K.
0.035 O.K.
22
0.11
6.035
0
0
120
535
535
655
5.03
4.92
0.01
0.01
225
225
200
200
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
21
22
0.11
0.11
6.035
6.035
6.035
0
0
655
655
4.92
4.92
0.01
0.01
225
225
200
200
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
19
19
0.10
0.10
6.035
6.035
6.035
0
0
0
535
535
535
5.03
5.03
0.01
0.01
225
225
150
150
1.02 O.K.
1.02 O.K.
0.040 O.K.
0.040 O.K.
25
25
0.17
0.17
6.035
6.035
6.035
655
1190
4.61
0.01
225
200
0.87 O.K.
0.035 O.K.
11
0.06
6.035
1190
0
0
1190
1720
1720
1720
4.43
4.43
4.43
0.01
0.01
0.01
225
225
225
200
200
200
0.87 O.K.
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
0.035 O.K.
27
28
30
0.14
0.14
0.15
6.035
6.035
6.035
6.035
3.580
3.445
3.305
3.155
0
0
535
535
535
5.03
5.03
0.01
0.01
225
225
200
200
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
22
28
0.11
0.14
6.035
6.035
6.035
4.535 1.500
4.425 1.610 Precast mh
4.285 1.750 Precast mh
0
0
530
530
530
5.04
5.04
0.01
0.01
225
225
200
200
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
27
27
0.14
0.14
6.035
6.035
6.035
4.535 1.500
4.400 1.635 Precast mh
4.265 1.770 Precast mh
535
0
0
1065
1065
1065
4.67
4.67
0.01
0.01
225
225
200
200
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
20
18
0.10
0.09
6.035
6.035
6.035
4.535 1.500
4.435 1.600 Precast mh
4.345 1.690 Precast mh
1065
0
0
0
1600
1600
1600
1600
4.46
4.46
4.46
0.01
0.01
0.01
225
225
225
200
200
200
0.87 O.K.
0.87 O.K.
0.87 O.K.
0.035 O.K.
0.035 O.K.
0.035 O.K.
23
23
32
0.12
0.12
0.16
6.035
6.035
6.035
6.035
4.265
4.230
4.115
3.955
530
MH3
MH3-MH6
MH6-MH7
BLOCK A
MH7
MH7-MH8
MH8-MH9
MH9-EXT MH
110
PIPE
MH22-MH12
BLOCK C
MH10
MH10-MH11
MH11-MH12
C =
3.02.01
xS
CATCHMENTS
UNIT
m2
12
VCP
Version No:
0.54
DESIGN
MH
to
MH
Job No
1.500
1.695
1.915
2.100
2.455
2.590
2.730
2.880
1.770
1.805
1.920
2.080
Precast mh
Precast mh
Precast mh
Precast mh
Precast mh
Precast mh Add PE MH17-MH18
Precast mh
Precast mh Ext. Manhole